HomeMy WebLinkAboutM-83-0582r F TO: Honorable Howard Gary s'A;{ S CI CfC� DATE: June 8, 1983 Manager 1"33 JU'v 16 FAi= 28 City cf Miami SUBJECT: "Teter Beater" Tram/Interim FROM: Roger M. Carl Parking Facility Director Department o r During the the first six months of operation of the Interim Parking Facility, the "Meter Beater" Tram accrued an accumulated loss of $8,765.00. Losses are projected to increase to approximately $1,500.00 per month if the tram is maintained in its current method of operation. Voyager Tram has agreed to lower their charge from $23.70 to $22.50 per hour per tram. This reduction is estimated to be $400 peer month over the next six months. Conversely, a $2,500 monthly profit for the parking facility is projected if the tram is discontinued. Those revenues would aid in recovering operating expenses as well as a portion of the $234,583.13 construction cost. Some customer participation would be lost if the tram is discontinued. It is the recommendation ,of the Department that sixty days be allotted in which to work with the Downtown business community to subsidize the tram, potentially via advertising. In the event that this support does not materialize during the next sixty days, the alternative would be to discontinue the tram service. We believe that the City Commission should take the position that the tram should not be subsidized by the City and therefore r�egup,t that *hie -item he scheduled for discussion at the next City Commission meeting. Att . a MOT1QN 83"582. 1 PERIOD FROM NOVEMBER 1983 APRIL 30, 1983 TRAM OPERATION TOTAL REVENUES 9,156.00 TOTAL EXPENDITURES 34,142.00 OPERATING LOSS 24,986.00 INTERIM PARKING TOTAL REVENUES 25,670.00 FACILITY TOTAL EXPENDITURES 9,449.00 OPERATING PROFIT 16,221.00 COMBINED LOT TOTAL OPERATING LOSS 8,765.72 AND TRAM 83-SSZ