HomeMy WebLinkAboutR-83-0648.1-83-525
rr
RES0LIIT ION NO.
A RESOLUTION ACCEPTING THE COMPLETED WORK
OF WEEKLEY ASPHALT PAVING, INC. AT A
TUT AI_ COST OF $55,994.62 FOR CITY WIDE
PAVING PROJECT - OVERTOWN; AUTHORIZING AN
INCREASE IN THE SEPTEMBER 139 1982
CONTRACT WITH WEEKLEY ASPHALT PAVING,
INC. FOR SAID WORK IN THE NET AMOUNT OF
$2,277.12; AND AUTHORIZING A FINAL
PAYMENT OF $8,176.48.
WHEREAS, there exists a contract. dated September 13,
1982 between the City of Miami and Weekley Asphalt Paving,
Inc. for CITY WIDE PAVING PROJECT - OVERTOWN; and
WHEREAS, it was determined that additional broken and
cracked sidewalk should be replaced and constructed where
needed; and
WHEREAS, approval from the City Manager for an increase
in the contract cost of approximately $3,000.00 was requested
and received; and
WHEREAS, the City Commission is hereby concurring in the
determination that the actual amount be increased by
$2, 277, 12; and
WHEREAS, the work has been satisfactorily completed, and
Weekley Asphalt Pavinq, Inc has furnished the required
documents certifying that all hills for labor and materials
have been paid in full in connection with the aforesaid
contract; and
WHEREAS, sufficient monies are available from the "City
Wide Paving Improvements" fund;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. The amount of the September 13, 1982
contract with Weekley Asphalt Paving, Inc. for CITY WIDE
PAVING PROJECT - OVERTOWN is hereby increased in the net
amount of $2,277.12, with monies therefor hereby allocated
from the "City Wide Paving Improvements" fund. CITY COMMISSION
MEETI140 OF
J U L 188 1983a
O.J No. 83^5
REMARKS.
Section 2. The completed work performed by Weekley
Asphalt Paving, Inc. for CITY WIDE PAVING PROJECT - OVERTO'WN
is hereby accepted at a total cost. of $55,995.62.
Section 3. The proper officials of the City of Miami
are hereby authorized to pay Weekley Asphalt Paving, Inc. a
balance of $8,176.48 as fall and final payment for all work
performed and all material furnished in connection with the
aforesaid contract.
PASSED AND ADOPTED this 18th day of i,ly , 1983.
/.----ATT�S T
ALPG. ONGIE, CITY CL
PREPARED AND APPROVED BY:
OBERT F. CLARK •
DEPUTY CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
47-e �? &4tol-0. w
Ae�
E R. GARCIA-PEDROSA
TY ATTORNEY
Maurice A Ferre
MAURICE A. FERRE
M A Y O R
- 2 - 83-648
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME City Wide Paving Project - Overtown - B-4480
CONTRACTOR Weekly Asphalt Paving, Inc.
JOB SCOPE Construct new asphalt overlay, replacement of
broken sidewalk, curb and gutter and tree replace-
ments in the area bounded by N. W. 14-20 Streets
between N. W. 3 Avenue and I-95
REASON Final layer of asphalt not constructed when streets
FOR WORK were rebuilt to allow utilities to install their
facilities for future development.
SOURCE
OF FUNDS City Wide Paving Improvements
PROJECT Bids Received: 8/12/82
HISTORY Contract Awarded: 9/9/82
Preconstruction Meeting: 10/28/82
CONTRACT
TIME
STARTED 2/14/83
CONTRACT 30 Working days plus 2 days delay from rain and
TIME 32 days delay to remobilize and
construct additional sidewalk
under I-95
SCHEDULED
COMPLETION
DATE 5/13/83
ACTUAL
COMPLETION
DATE 5/13/83
BID AMOUNT $ 53,717.50
CONTRACT
FINAL COST $ 55,994.62
CURRENT
ITEM FOR Resolution to accept completed work, increase
CONSIDERATION contract amount $2,277.12 for extra work, and
authorize final payment to the contractor.
83-64F-
55;1
CITY OF MIAM1. FLORIDA
INTER -OFFICE MEMORANDUM
To. Howard V. Gary OATE7 June 10, 1983 FIDE: B-4480
City Manager
SUBJECT CITY WIDE PAVING PROJECT -
OVERTOWN - Resolution for
Increase in Contract and
FROM. Donald W. Cather REFERENCES: Final Payment
Director of Public Works (For Commission Meeting
ENCLOSURES: (For
July 18, 1983 )
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work performed by Weekley
Asphalt Paving, Inc. at a total cost of
$55,994.62 for CITY WIDE PAVING PROJECT -
OVERTOWN; authorizing an increase in the
contract in the amount of $2,277.12; and
authorizing a final payment of $8,176.48.
Weekley Asphalt Paving, Inc. has completed the project con-
sisting of constructing asphalt overlay over approximately
one mile of street in the area bounded by N. W. 17-20 Streets
between N. W. 3 Avenue and I-95, and included concrete curb
and gutter replacement, concrete sidewalk replacement, and
landscaping.
During construction it was learned that all of the sidewalk
in the vicinity of N. W. 17 Street under the I-95 overpass
could not be replaced because of insufficient quantities
within the contract. The City Manager authorized an
increase in the contract not to exceed $3,000.00, and work
proceeded on the additional sidewalk. We are hereby
requesting the City Commission to confirm this action
for the actual amount to be increased of $2,277.12. The
total payment to the contractor is $53,717.50 plus this
increase. The final construction cost for the project is
$55,994.62.
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are met.
L:hc
esolution attached
83-646
OFFICE
19 March 17, 83 B-4480
Ha,vZrd V. Gary
Citv ilanager CITY 14IDE PAVING PROJECT -
OVERYOIdN - B-4480
Increase in Contract .mount
Donald 1-1. Cather-
Di'orlcs
'��(\`\\Actors PAP bl' ` � .._
Construction on the subject project is well under way aiad:•wcr'hatie
become aware that we will not be able to replace all of�Ae Sid-J--
walk in the vicinity of N. W. 17 Street and the I-95 oi-4.pass that
we believe needs to be replaced. More broken and cracked s:21ewalk
was encountered than we anticipated, and we have made arrangements
to replace it. Ile find that we do not have sufficient quantities
in the contract to construct a strip of concrete sidewalk between
the existing sidewalk and curb and gutter on both sides of 17 Street
underneath the expressway. Grass will not grow there, and if the
area is not paved, it will only serve as a trash collector.
Ile have determined that we can add this additional sidewalk to our
contract at an additional cost of $3,000 if we can proceed with
the work immediately rather than wait for Commission approval of
the necessary increase in contract. Since the $3,000 needed is less
than the amount the City Manager is empowered to authorize without
prior Commission approval, we request your approval of an increase
in contract not to exceed $3,000 immediately, to permit us to
proceed with the work. We will ask the Commission_ to confirm your
action at the time of final acceptance of the work.
EL:vh
; � cc: City Manager
bc: Construction -?
Design
Contract
APPROVED
DISAPPROVED
- ,D
CITY
83 6- 6-