HomeMy WebLinkAboutM-83-0719ilk 0 1
Howard V. Gary
City Manager
Cesar H. Odio 1, ��
Assistant City Manager �1
July 21, 1983
Dinner Key Marina
Renovation and Expansion
(City Commission meeting
agenda item - July 28, 1.983)
Four
The Dinner Key Redevelopment Design Project (Phase I) is completed.
The design contract with the firm of Greenleaf and Telesca requires
a presentation of conceptual design to the City Commission for re-
view and approval.
The State of Florida D.E.R. and the U.S. Army Crops of Engineers
have issued environmental permits for this project. The proposed
Master Plan, as outlined in the attached Executive•Summary, has
been endorsed by -the Waterfront Board, the Marina Users, Marina
Industrial and Commercial Organizations, as well as environmental
groups.
The preliminary construction cost estimate of $6.2 million is
responsive to budgetary goals and the design maintains all
essential operational features and requirements.
The design memoranda on Phase I, enclosed, consist of:
Memo 1 - A structural analysis of existing pier 2 & 5,
concluding that there is no alternative other
than replacement.
Memo 2 - Fleet Determination - Including a Dinner Key
Marina user survey, future fleet projection,
analysis of operational needs and recommended
amenity package.
Memo 3 - Conceptual Master Plan - Including preliminary
cost estimate and a construction phasing schedule.
Two drawings of the proposed Master Plan of the
marina and landside perimeter development are
included.
It is anticipated that, upon authorization to proceed, the work
required leading to final design and construction documents can
be completed without interruption and that this project can be
ready for the advertising of construction bids at the end of the year.
It is recommended that this item be scheduled for a brief presentation
at the July 28, 1983 City Commission meeting, so as to be able to
proceed with the design.
MOTION
83--'715i
After Phase I is approved by the City Commission, two additional chases
provide for the completion of the project, as follows:
Phase II consists of: 1) Completion of the Marina design;
2) An economic feasibility and market study
to be made by an independent contractor.
A request for proposals (R.FP) is presently_ being developed for the
feasibility study.
Phase III consists of: 1) The preparation of the final construction
plans, specifications and contract docu-
ments;
2) The formal solicitation for bids;
3) The award of the construction contract.
-2-
83--719,
•
EXECUTIVE SUMMARY
DINNER KEY MARINA IMPROVEMENTS
PROJECT BUDGET:
WATERSIDE
• Waterside $ 5,000,000
• Landside 1,200,000
TOTAL 6,200,000
1. Reconstruct piers in parallel configuration to:
a. Maximize utilization of area available
b. Improve maneuverability of boats in fairway
C. Provide minimum of 200 feet width in peripheral roadstead
d. Provide 499 slips for boats from under 30 feet to over 85 feet in
5-foot increments (an additional 174 slips above present 325)
2. Environmental permits (based on #1 above):
a. Permit 13-45677 obtained from State of Florida Department of
Environmental Regulation
b. Permit 82F1217 obtained from U.S. Corps of Engineers
C. Will allow 160 live -aboard slips.
3. Recommended pier construction:
a. Prestressed precast concrete piling driven in prebored holes
b. Prestressed precast concrete deck section 12-foot wide with cast -in
utility trough
C. Cast -in -place pile caps to tie piling and deck section into single
structural unit
d. Precast utility trough cover slabs to be removable where access
required
e. Concrete 5,000 psi for piles and 3,400 psi elsewhere; all reinforc-
ing epoxy coated
f. All anchor and fender piling greenheart or pressure treated pine;
banded and capped
4. Facilities to be provided:
a. Electric power single 30A, 110 V, slips 30 feet and under; single
50A, 220 V, slips over 30 feet
b. Dock lighting, 25 W light on each electric outlet pedestal
C. Fire protection valved standpipes with 100 feet of 1-1/2-foot hose
and cabinet at 75-foot centers each pier with 500 gpm flow from
last standpipe as required by City of Miami Fire Department
d. Domestic water, telephone and TV outlet available at each slip
e. Fire alarm and TV security surveillance systems on each pier
f. Conveniently located call boxes to dockmaster on each pier
g. Safety ladders conveniently located on each pier
h. Waste receptacle on each fingerpier
i. Sanitary sewer connections at each designated live -aboard slip
j. Sanitary sewer collection system on each pier with provisions for
future connections
k. Portable pump -out system for emptying -sewage holding tanks on tran-
sient boats
GREENLEAF•TELESCA • PLANNERS • ENGINEERS • ARCHITECTS
Page 1 of 2
83-'719I
11
EXECUTIVE SUMMARY
DINNER KEY MARINA IMPROVEMENTS
LANDSIDE
1. Adjunct waterside facilities:
a. Electric transformers and controls at each pier head
b. Sewage collection sump and pump station
C. Standard Miami Hydrants at 250 feet center to center with 1,000 gpm
flow as required by City of Miami Fire Department
d. Dinghy dock to serve moored vessels outside dock area
e. Sanitary and shower facilities
f. Laundry facilities
g. Fuel dock
h. Auxiliary Dockmaster office with public restrooms
i. Bait, tackle, supplies, and sundries
j. Vehicle loading and unloading area at each pier head
k. Launching ramp for trailered boats
2. Amenities:
a. Landscaped promenade along waterfront at marina
b. Vehicle access road to serve all piers with drop offs at each pier
C. Parking space for marina tenants and for vehicle trailer units at
or convenient to launching ramp
d. Improved traffic circulation to and from marina through signage and
road improvements
Above improvements are estimated to be within the allotted budget.
GREENLEAF•TELESCA • PLANNERS • ENGINEERS • ARCHITECTS Page 2 of 3
83-'7191