RES1)LUI ION Nil. < v (oil
A RF_SOLU(ION AUTHORIZING AN INI'RI:A'if= IN
THE CONTRACT AMOUNT OF $55,OOO IN THE
CONTRACT BETWFFN THE CITY OF 1•11A1.11 AND
11EIIFR CONSTRUCfION, INC., OATEO MAY 11,
19H2, FOR THE CONSTRUCTION OF J11SE MARTI
RIVERFRONT PARK WI TH FUNDS TI-1LRFI OR
ALLOCATED FROM I1.5. DEPARTMENT OF
INTERIOR LAND AND W.ATF_R CONSERVATION
FUNDS; FURTHER RATIFYING THE CITY
MANAGER'S WRITTEN FINDING THAT THE HEREIN
INCREASE RESHLfED FROM EMERGENCY
CIRCOMSIANCES 13Y AN AFFIRMATIVE VOTE OF
2/3RDS OF THE MEMN1-I?S 0F' THE CI TY
COMM I59ION AND ADOPT ING THE F INDINGS AND
CONCLUSIONS SET FORTH IN THE PREAMBLE OF
[HIS RESOLUTION; FURTHER AUTHORIZING AN
INCREASE OF 90 WORKING DAYS IN THE
CONSTRUCTION TIME FOR SAID PROJECT.
WHEREAS, there exists a contract dated May 11, 1982
between the City of Miami and Better Construction, InC. in
the amount of $19910,934 for the construction of Jose Marti
Riverfront Park; and
WHEREAS, an increase in the contract is required because
of additional and unforeseen work needed to protect the river
edge bulkhead from salt water intrusion, added length to
bulkhead tiebacks as required by Metropolitan Dade County
Department of Environmental Resources, and poor soil
conditions encountered at the site that will require the
hauling away of debris and its replacement with the suitable
soil; completely depleting the cash allowance set forth in
the proposal to rover special items; and
WHEREAS, the City Manager has made a written finding
that a valid emergency existed under the circumstances; and
WHEREAS, the Director of the Department of Parks
recommends the increase in contract to cover the additional
cost and has certified that funds for the increase are
available from U. S. Depatment. of Interior Land and Water
Conservation Funds; and
WHEREAS, the special work items have delayed the
contractor and have caused it to request additional
construction time; and CITY COMMISSION
MEETING OF
.JUL 28 1983
4
I
Y
WHEREAS, the contractor has agreed that the granting of
this additional construction time shall not he used as a
1)ariis for it to Iod(I 1eiav cIaim7 .1g1iinst the City; and
WHEREAS, the Direr.turs of the Depnrtmr,nts of Park._- and
Public Works recommend the Brantinq of an additional 90
working days construction time;
NOW, THEREFORE, I3F IT RESOLVED BY THE COMI.IISSION OF THE
CITY OF MIAMI, FLORIDA:
Sect inn 1. After a property advertised public hearing,
the finding of the City Manager set forth in the preamble to
this Resolution is hereby rat ified by an affirmative vote of
2.'3rds of the City Commission and adopted as if fully set
forth in this Section.
Section 2. The contract between the City of Miami and
Better Construction, Inc., dated May 11, 1982, for the
construction of Jose Marti Riverfront Park is hereby
increased by $35,000 with funds therefor hereby allocated
from U. S. Department of Interior Land and Water Conservation
Funds.
Section 3. The construction time allowed by the
contract documents for the same contract is hereby increased
by 90 workinq days.
PASSED AND ADOPTED this 28th day of July , 1983.
Maurice A. Ferre
MAURICE A. FERRE
M A Y O R
(EST:
-RAKPH G. ONGIE, CITY RK
PREPARED AND APPROVED BY:
OBERT F. CLARK
DEPUTY CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
SE R. GARCIA-PEDROSA
ITY ATTORNEY
-2-
83-7041.
CITY OF MIAMI, FI.,ORIDA
INTER-OFFICE..016MORANDUM
Howard V . Gary r°ATE` June 30, 1983 B-2770
City Manager
SUBJECT JOSE MARTI RIVERFRONT PARK
Resolution for Increase in
Contract Amount and in
FROM Donald 14. Cather REFERENCES:Construction Time
Director of Pub orks
C��I
ENcLosuRES. (For Commission Meeting
'/r� of July 18, 1983)
The Department of Public Works recommends the
adoption of a resolution authorizing an increase
in the contract between the City of Miami and
Better Construction, Inc., for the construction
of Jose Marti Riverfront Park in the amount of
$35,000, said funds to be provided entirely by
U.S. Department of Interior Land and Water
Conservation Funds, and authorizing an increase
of 90 working days in the construction time for
the project.
There is a contract dated May 11, 1982 between the City of Miami
and Better Construction, Inc., in the amount of $1,910,934 for
the construction of Jose Marti Riverfront Park. The park is
located on the south side of the Miami River between S. W. 3 and
4 Avenues, extending as far south as S. W. b Street.
Additional work and expense we have incurred by corrections we had
to make to the river edge bulkhead, added length to the bulkhead
tiebacks as required by Metropolitan Dade County Department of
Environmental Resources, and poor soil conditions we have en-
countered that will require the hauling away of debris and replace-
ment with suitable soil will completely deplete the cash allowance
for the project. We are aware of other items of special work that
are forthcoming that will require the replenishing of the nearly
depleted cash allowance. The Director of the Department of Parks
agrees with the recommendation for the increase in contract of
$35,000 to replenish the cash allowance, and has certified that
funds for the increase are available from U.S. Department of
Interior Land and Water Conservation Funds.
The special and extra work referred to above has also
contractor, and has caused him to request additional
time. The Director of the Department of Parks concur
recommendation of adding an additional 90 working day
construction time for the project.
L:vh
Resolution Attached
delayed the
construction
s with my
s to the
83---704