HomeMy WebLinkAboutR-83-0751r -� i - r t ) ; U .-r t- RESOLUTION No. 11 3-" t . ) _ , A RESOLUTION ACCEPTING THE COMPLETED WORK OF PATCHARD AND COt,IPANY, INC. AT A TOTAL COST OF $2 2 , 950 FOR :l. I.P.D. - GARAGE FLOOR SLAB REPLACEMENT; AUTHORIZING AN INCREASE IN THE DECE',°iBER 16, 1982 CONTRACT WITH PATCHARD AND CO;IPANY, INC. FOR SAID WORK IN THE NET AMOUNT OF $2,500; AND AUTHORIZING A FINAL PAYMENT OF $4,545 WHEREAS, there exists a contract dated December 16, 1982 between the City of i`liami and Patchard and Company, Inc. for 'M.M.P.D. - GARAGE FLOOR SLAB REPLACEMENT; and WHEREAS, the work has been satisfactorily com- pleted, and Patchard and Company, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, it was determined after removal of the slabs in the Police Department Parking Garage that addi- tional equipment costs and epoxy grout to set the slabs would be required, resulting in an increase in the contract; and WHEREAS, sufficient funds for the increased cost are available from "Police Parking Garage Improvement" funds; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend the increase of $2,500 to cover the increase in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The amount of the December 16, 1982 contract with Patchard and Company, Inc. for M.M.P.D. - GARAGE FLOOR SLAB REPLACEMENT is hereby increased in the net amount of $2,500, with monies therefor hereby allo- cated from "Police Parking Garage Improvement" funds. CITY c P 7 1983 83-751 R(%IARKS. 4 4 Section 3. The proper ol-ticials of. the City of ;Miami are hereby authorized to pay Pat -chard and Company, Inc. a balance of. $4,545 ;is full and final payment for all work performed and all materials furnished in connection with the aforesaid contract. PASSED AND ADOPTED this 7th day of September 1983. ATTEST: Fty erkLZ PREPARED AND APPROVED BY: Deputy City Attorney APPROVED AS TO FOPM AND CORRECTNESS: ty t orney Maurice A. Ferre M A Y 0 R - 2 - 83-751 4 g CITY OF MIAW FLORIDA 1,57 INTER -OFFICE•, MEMORANDUM � To Howard V. Gary Citv Manazer FROM Donald W. Cather Director of PublicAgorks C.'.TE August 19, 1983 FILE B-2851 SUB:E--' N. *M. P. D. - GARAGE FLOOR SLAB REPLACEMENT - Resolution for Increase in Contract Amount and Final Pavment REFERENCES (For Commission Meeting ENCLOSURES of September 7, 1983) The Department of Public Works recommends the adoption of the resolution accepting the completed work performed by Patchard and Company, Inc. at a total cost of $22,950 for M.M.P.D. - GARAGE FLOOR SLAB REPLACEMENT; authorizing an increase in the contract in the amount of $2,500; and authorizing a final payment of $4,545. Patchard and Company, Inc. has completed the project con- sisting of removal and replacement of 12 - 8' x 12' and 6 - 4' x 12' concrete slabs over a 60" sanitary sewer force main in the Police Department Parking Garage. After removal of the slabs, it became apparent that the work and working conditions were not as expected. These unforeseen conditions resulted in additional equipment costs and additional epoxy grout to set the slabs, result- ing in a $2,500 overrun in the contract amount. Chief Kenneth Harms' office has confirmed that funds are available to cover this overrun from the account "Police Parking Garage Improvement". This was a lump sum contract in the amount of $20,450, but the completed cpntract amount is plus $2,500 for the increase. The final construction cost for the project is $22,950. It is now in order for the Commission.to accept the completed work and authorize final payment, after all conditions are met. :hc Resolution attached 83-'751 E 4 FINAL CONSTRCCTION FACT SHEET FOR THE CITY MANAGER JOB NAME %IMPD - Garage Floor Slab Replacement B-2851 CONTRACTOR Patchard & Co., Inc. JOB SCOPE Remove and replace 12-8' x 12' concrete slabs and 6-4' x 12' concrete slabs over a 60" sanitary sewer force main running through the Police parking garage at 401 N. W. 2 Avenue. REASON FOR WORK Slabs cracked creating hazard to vehicular traffic and sanitary sewer force main. SOURCE OF FUNDS Police Parking Garage Improvement PROJECT Bids Received: 9/28/82 HISTORY Contract Awarded: 10/14/82 Preconstruction Meeting: 11/12/82 CONTRACT TIME STARTED 3/4/83 CONTRACT TIME 40 Working days SCHEDULED COMPLETION DATE 4/28/83 ACTUAL COMPLETION DATE 4/11/83 BID AMOUNT $ 20,450.00 CONTRACT FINAL COST $ 22,950.00 CURRENT ITEM FOR Resolution to accept completed work, increase CONSIDERATION contract amount $2,500.00, and authorize final payment to the contractor. 83-751