Loading...
HomeMy WebLinkAboutR-83-0750c rl 1-8 5-708 RI'SOLL;'i ION NO. A RESOLUTION ACCEI'TIIv'(; THE CO:II'LE'I'ED I ORK OF :ITRI C0NST1)vUC1'I0N, INC. AT A 'TOTAL COST OF $587 , 783. 06 FOR 'fA'IIA:IT STOI::i SEM"R P R0.11:CT ; AND AUTHOR T:: I N(, A FINAL PAY, IF. 1T OF $5,767.06. C'1ERLA!',, there exists a contract dated April 5, 1982 between the City of iMiami and :1iri Construction, Inc.; and WHEREAS, the work has been satisfactoril,! completed, and Miri Construction, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and t,JTHEREAS , the City Ilanager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE C0;1IISSION OF THE CITY OF '1IAMI , FLORIDA: Section 1. The completed work performed by Miri Construction, Inc. for TAIMILMI STOR11 SETTER PROJECT at a total cost of $587,783.06 is hereby approved. Section 2. The proper officials of the City of i•Iiami are hereby authorized to pav $5,767.06 to Miri Construction, Inc. as full and final payment for all work performed and all materiales furnished in connection with TAIIIAIII STOR11 SE14ER PROJECT. PASSED AI4D ADOPTED this 7th day of September , 1983. ATTEST: it)vClerk l PREPARED AND APPROVED Deputy City Attorney Maurice A. Ferro M A Y O R APPROVED AS TO FORM A14D CORRECTNESS: ty Attorney CITY COMMISISION MEETING OF SEP 7 1%3 83-7 01 &4 RIM 156 Howard V . Gar_ City 'Lana.ger 41 CITY OF MIAMI• FLORIDA ANTER-OFFICE_ MEMORANDUM FROM Donald W. Cather Director of Public Works DATE AuF_ust 19, 1983 FILE B-5&80 Su 9JE TA:•IIA�II ST01Z:•I SEWER PROJECT Resolution for Final Pavment REFERENCES (For Commission Me2t1_T1P of The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $5,767.06 to Miri Construction, Inc. for TA-MIAMI STORM SEWER PROJECT. Miri Construction, Inc, has completed the project consisting of constructing new drainage in an area bounded by best 55 - 60 Avenue from S.W. 8 Street to N.W. 5 Street, including 24" french drain, 12" - 30" storm sewer pipe, along with all necessary appurtenances. The original contract amount was for $668,514.45, and the completed amount is $587,783.06. It was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. rp :az solution attached 83--'750, FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Tamiami Storm Sewer Project B-5480 CONTRACTOR Miri Construction, Inc. JOB SCOPE Construct drainage facilities in area bounded by W. 55-60 Avenues between S. W. 8 Street to N. W. 5 Street including: 24" French drain, storm sewer pipe 12"-30" along with necessary appurtenances. REASON Eliminate drainage problems at locations of FOR WORK greatest need. SOURCE OF FUNDS Storm Sewer G. 0. Bond Fund PROJECT Bids Received: 3/18/82 HISTORY Contract Awarded: 4/l/82 Preconstruction Meeting: 4/22/82 CONTRACT TIME STARTED 7/30/82 CONTRACT TIME 160 Working days plus 16 days delay from rain and 18 days delay from redesign and additional work SCHEDULED COMPLETION DATE 5/9/83 ACTUAL COMPLETION DATE CONTRACT FINAL COST CURRENT ITEM FOR CONSIDERATION 5/9/83 $ 668,514.45 $ 587,783.06 Resolution to accept completed work and authorize final payment to the contractor. 83-'750