RI'SOLL;'i ION NO.
A RESOLUTION ACCEI'TIIv'(; THE CO:II'LE'I'ED I ORK
OF :ITRI C0NST1)vUC1'I0N, INC. AT A 'TOTAL COST
OF $587 , 783. 06 FOR 'fA'IIA:IT STOI::i SEM"R
P R0.11:CT ; AND AUTHOR T:: I N(, A FINAL PAY, IF. 1T
OF $5,767.06.
C'1ERLA!',, there exists a contract dated April 5, 1982
between the City of iMiami and :1iri Construction, Inc.; and
WHEREAS, the work has been satisfactoril,! completed,
and Miri Construction, Inc. has furnished the required documents
certifying that all bills for labor and materials have been
paid in full in connection with the aforesaid contract; and
t,JTHEREAS , the City Ilanager and the Department of
Public Works recommend that the completed work be accepted
and final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE C0;1IISSION
OF THE CITY OF '1IAMI , FLORIDA:
Section 1. The completed work performed by Miri
Construction, Inc. for TAIMILMI STOR11 SETTER PROJECT at a total
cost of $587,783.06 is hereby approved.
Section 2. The proper officials of the City of i•Iiami
are hereby authorized to pav $5,767.06 to Miri Construction, Inc.
as full and final payment for all work performed and all
materiales furnished in connection with TAIIIAIII STOR11 SE14ER
PROJECT.
PASSED AI4D ADOPTED this 7th day of September ,
1983.
ATTEST:
it)vClerk
l
PREPARED AND APPROVED
Deputy City Attorney
Maurice A. Ferro
M A Y O R
APPROVED AS TO FORM A14D CORRECTNESS:
ty Attorney
CITY COMMISISION
MEETING OF
SEP 7 1%3
83-7 01
&4 RIM
156
Howard V . Gar_
City 'Lana.ger
41
CITY OF MIAMI• FLORIDA
ANTER-OFFICE_ MEMORANDUM
FROM Donald W. Cather
Director of Public Works
DATE AuF_ust 19, 1983 FILE B-5&80
Su 9JE TA:•IIA�II ST01Z:•I SEWER PROJECT
Resolution for Final Pavment
REFERENCES (For Commission Me2t1_T1P of
The Department of Public Works recommends
the adoption of the resolution accepting the
completed work and authorizing a final
payment of $5,767.06 to Miri Construction,
Inc. for TA-MIAMI STORM SEWER PROJECT.
Miri Construction, Inc, has completed the project consisting
of constructing new drainage in an area bounded by best 55 -
60 Avenue from S.W. 8 Street to N.W. 5 Street, including 24"
french drain, 12" - 30" storm sewer pipe, along with all
necessary appurtenances. The original contract amount was for
$668,514.45, and the completed amount is $587,783.06. It
was completed on time.
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are met.
rp :az
solution attached
83--'750,
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME Tamiami Storm Sewer Project B-5480
CONTRACTOR Miri Construction, Inc.
JOB SCOPE Construct drainage facilities in area bounded by
W. 55-60 Avenues between S. W. 8 Street to N. W.
5 Street including: 24" French drain, storm sewer
pipe 12"-30" along with necessary appurtenances.
REASON Eliminate drainage problems at locations of
FOR WORK greatest need.
SOURCE
OF FUNDS Storm Sewer G. 0. Bond Fund
PROJECT Bids Received: 3/18/82
HISTORY Contract Awarded: 4/l/82
Preconstruction Meeting: 4/22/82
CONTRACT
TIME
STARTED 7/30/82
CONTRACT
TIME 160 Working days plus 16 days delay from rain
and 18 days delay from redesign
and additional work
SCHEDULED
COMPLETION
DATE 5/9/83
ACTUAL
COMPLETION
DATE
CONTRACT
FINAL COST
CURRENT
ITEM FOR
CONSIDERATION
5/9/83
$ 668,514.45
$ 587,783.06
Resolution to accept completed work and authorize
final payment to the contractor.
83-'750