RESOLUTION NO. :'443" 74'1G
A RESOLUTION ACCEPTING THE C0,4PLETED
WORK PERFORMED BY INTERCOUNTY CON-
STRUCTION, INC. AT A TOTAL COST OF
$'_,185,873.57 FOR RIVERVIEW STORM
SEWER PROJECT - PHASE I (2ND BIDDING) -
B1D "B"; AND AUTHORIZING A FINAL
PAYMENT OF $82,387.12
WHEREAS, there exists a contract dated August 14,
1983 between the City of Miami and Intercounty Construction
Corporation; and
WHEREAS, the original contract was increased on
April 1, 1982 by Resolution No. 82-321 and on October 14,
1982 by Resolution No. 82-962 in the amounts of $12,000
and $30,000 respectively; and
WHEREAS, the work has been satisfactorily
completed, and Intercounty Construction Corporation
has furnished the required documents.certifying that
all bills for labor and materials have been paid in
full in connection with the aforesaid contract; and
WHEREAS, the City Manager and the Department
of Public Works recommend that the completed work be
accepted and final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by
Intercounty Construction Corporation for RIVERVIEW
STORM SEWER PROJECT - PHASE I (2ND BIDDING) - BID "B"
at a total cost of $2,185,873.57 is hereby approved.
Section 2. The proper officials of the City
of Miami are hereby authorized to pay $82,387.12 to
Intercounty Construction Corporation as full and final
payment for all work performed and all materials furnished
in connection with RIVERVIEW STORM SEWER PROJECT -
PHASE I (2ND BIDDING) - BID "B".
CITY C014114rlssiwi
MF-ETti\I1'3 017
SEP 7 1'38�3+y^ &
P.EMARKS
x
0
PASSED AND ADOPTED this 701 _ day of 5eL) ember
1982.
ATTEST:
ty lerk
PREPARED AND APPROVED BY:
Deputy City Attorney
APPROVED AS TO FORM AND CORRECTNESS:
y A orne
- 2 -
?Saurice �. i'errc
M A Y O R
83-746
6
CITY OF MIAMI, FLORIDA /
L
1
52 4WER+OFFICE MEMORANDUM
�O Howard V. Gary DATE August 13, 1983 FILE B-5441-A2
City Manager
sUBJEC7 RIVERVIEW STORM SEWER PROJECT -
PHASE I (2ND BIDDING) - BID "B" -
Resolution for Final Payment
FROM Donald W. Cather REFERENCES
Director of u lic Works
� / ENCLOSURES (For Commission Meeting
of September 7, 1983)
The Department of Public Works recommends the
adoption of the resolution accepting the
completed work and authorizing a final payment
of $82,387.12 to Intercounty Construction
Corporation for RIVERVIEW STORM SEWER PROJECT
- PHASE I (2ND BIDDING) - BID "B".
Intercounty Construction Corporation has completed the project
consisting of constructing a storm sewer pumping station
located on the corner of N.W. 6 Street at N.W. 13 Avenue.
This pumping station was constructed to pump storm water col-
lected by a gravity system constructed under Bid A of this
project under another contract. Together the two projects
provide storm drainage for 107 acres in the vicinity of West
Flagler Street and 12 Avenue, and will eliminate severe local
flooding problems at S.W. 1 Street and 11 Avenue, West Flagler
Street and 12 Avenue, N.W. 1 Street and 13 Avenue, and other
locations in the area.
The original contract amount was for $2,146,000.00 and was
increased by Resolution No. 82-321 dated April 1, 1982 and
Resolution No. 82-962 dated October 14, 1982. The completed
amount is $2,185,873.57, and it was completed on time. The
source of funds is, "Storm Sewer G. 0. Bond Fund".
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are met.
Resolution Attached
83-746
4 6
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME Riverview Storm Sewer Project Phase I (2nd Bidding) Bid "B" -
Pump Station =3 - B-5441
CONTRACTOR Intercounty Construction Corp.
JOB SCOPE Construct storm sewer pump station =3 located on the corner
of N. W. 6 Street at N. W. 13 Avenue.
REASON
Eliminate storm water flooding in area bounded by N. W.
FOR WORK
11 Avenue, S. W. 1 Street, N. W. 13 Avenue and the Miami
River in conjunction with construction of a new gravity
collection system.
SOURCE
OF FUNDS
Storm Sewer G. 0. Bond Fund
PROJECT
Bids Received: 7/13/80
HISTORY
Contract Awarded: 7/24/80
Preconstruction Meeting: 9/8/80
CONTRACT
TIME
STARTED
1/2/81
_ CONTRACT
250 Working days plus 43 days delay from rain and
TIME
337 days delay from the addition of
sophisticated fire control equip-
ment, modifications to the bar
screen assembly and other misc.
additional work.
SCHEDULED
COMPLETION
7/6/83 - The City assumed beneficial use of the pumping
DATE
station in April, 1982 subject to completion of
design changes and additional work, which occurred
this date.
ACTUAL
COMPLETION
DATE
7/6/83
BID AMOUNT
$ 2,188,000 (Includes $12,000 and $30,000 Increases auth.
by Commission Reso. 82-321 dated 4/l/82 and
82-962 dated 10/14/82)
CONTRACT
FINAL COST
$ 2,185,873.57
CURRENT
ITEM FOR
Resolution to accept completed work and authorize
CONSIDERATION
final payment to the contractor.