RESOLUTION NO. 83-911;
A RESOLUTION CONFIRMING ORDERING RESOLUTION
NO. 83-658 AND AUTHORIZING THE CITY CLERK
TO ADVERTIZE FOR SEALED BIDS FOR THE CON-
STRUCTION OF EAST LITTLE HAVANA HIGHWAY IM-
PROVEMENT - PHASE I IN EAST LITTLE HAVANA
HIGHWAY IMPROVEMENT DISTRICT - PHASE I,
H-4487.
WHEREAS, at the City Commission meeting of July 18, 1983,
Resolution No. 83-658 was passed which ordered a highway improve-
ment identified as EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I
in EAST LITTLE HAVANA HIGHWAY IMPROVEMENT DISTRICT - PHASE I, H-4487;
and
WHEREAS, pursuant to due public notice a public hearing was
held before the City Commission on October 25 , 1983, as to any
objections to the confirmation of Resolution No. 83-658, which
resolution ordered EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I
in EAST LITTLE HAVANA HIGHWAY IMPROVEMENT DISTRICT - PHASE I, H-4487;
and
WHEREAS, no objections to the confirmation of said highway
improvement were sustained by the Commission, it is therefore in
order for the Commission to confirm said ordering resolution and
authorize the City Clerk to advertise for sealed bids for the con-
struction of said improvement;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. Resolution No. 83-658 dated July 18, 1983, which
ordered EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I in EAST
LITTLE HAVANA HIGHWAY IMPROVEMENT DISTRICT - PHASE I H-4487 is
hereby confirmed.
CITY COMMISSION
MEETING OF
OCT 25 1983
83-911,
REMARKS.
0
0
Section 2. That the City Clerk be, and he is hereby,
authorized to advertise for sealed bids for the construction
of EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I in EAST
LITTLE HAVANA HIGHWAY IMPROVEMENT DISTRICT - PHASE I, H-4487.
PASSED AND ADOPTED this 25th day of October ,
1983.
Maurice A. Ferre
MAURICE A. FERRE, MAYOR
ATTEST:
-- a p Oie; "City erk ��
G!
PREPARED AND APPROVED BY:
Robert F. Clark, Deputy City
Attorney
APPROVED AS TO FORM AND CORRECTNESS:
i ose R. Garcia -Pedrosa
I" City Attorney
-2-
83-91JL
Noo
O Howard V. Gary
City :Manager
=ROM
Donal d TJ rather
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
DATE` September 19, 1 98311LE.
SUBJECT EAST LITTLE
I1.1P ROVE: TENT
Resolution
REFERENCES. Resolution
HAVANA HIGHWAY
- PHASE I, H-4487
Confirming Ordering
Director of Public Works ENCLOSURES. (For Commission Meeting of
October 13, Resolution Attached
The Department of Public Works recommends
adoption of a resolution confirming Ordering
Resolution No. 83-658 and authorizing the
Citv Clerk to advertise for sealed bids for
EAST LITTLE HAVAN&% HIGHWAY IMPROVEMENT -
PHASE I in EAST LITTLE HAVANA HIGHWAY
IMPROVEMENT DISTRICT - PHASE I, H-4487.
EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I, H-4487, was
ordered by the City Commission on July 18, 1983. It is now in
order to confirm the ordering resolution and to authorize advertising
for bids.
A public hearing will be held by the City Commission at their
meeting of October 13, 1983. At that time the Commission will
hear objections to the confirmation of the ordering resolution,
No. 83-658.
This improvement is being proposed as an assessable improvement
under Section 56 of the Charter of the City of Miami. This district
is bounded by S.W. 1 Street, S.W. 7 Street, S.W. 4 Avenue and S.W.
9 Avenue.
The overall condition of the street rights of way in the eastern
portion of Little Havana has deteriorated. The pavement is narrow,
in poor condition and/or out of grade, side parkways are in poor
condition and drainage problems are extensive.
All of these problems will be corrected by EAST LITTLE HAVANA
HIGHWAY IMPROVEMENT - PHASE I, H-4487. Tie proposed construction
will include asphaltic pavement, concrete sidewailk, concrete curbs
and/or gutters, storm drainage and landscaping.
some sanitary sewer replacement will be necessarJ before construction
can begin on EAST LITTLE HAVANA HIGHWAY IMP ROVEMtNT - PHASE I. The
sanitary sewer project, entitled CITY :?IDE SANITARY SE14ER IMEROVE-
XE NT - EAST LITTLE HAVA-NA, B-5498, is also scheduled to be confirmed
at the October 13, 1983 Commission meeting.
83--91 JL
• Ago
Howard V. Gary September 19, 1983
EAST LITTLE HAVANA HIGHWAY IMPROVE"MENT - PHASE I, H-4487 is included
in the City of Miami's 1982-1988 Capital Improvement Program. The
construction of this improvement will be funded by Highway and Storm
Sewer General Obligation Bond Funds.
This improvement shall be designated in all proceedings and assessments
as EAST LITTLE HAVANA HIGHWAY I:IPROVEMENT - PHASE I, H-4487 and the
property against *.which special assessments shall be made for a portion
of the cost thereof, shall be designated as EAST LITTLE HAVANA HIGHWAY
IMPROVEMENT DISTRICT - PHASE I, H-4487.
DCB:slf
Resolution attached
-1-
83-911,
PERTINENT INFORMATION
EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I
H-4487
A. The overall condition of the streets in the eastern portion
of Little Havana has deteriorated. Parkways are in poor
condition due to extensive on -street parking, pavement is in
poor condition, narrow and/or out of grade, and drainage
problems are extensive.
B. The proposed improvements will include clearing and grading,
construction of asphaltic pavement, concrete curbs and/or
gutters, concrete sidewalk, storm drainage facilities and
landscaping.
C. EAST LITTLE HAVANA HIGHWAY U4PROVEMENT - PHASE I is included
in the City of Miami's 1982-88 Capital Improvement Program.
ACTION TO BE TAKEN
1. A local improvement designated as EAST LITTLE HAVANA HIGHWAY
IMPROVEMENT - PHASE I, H-4487 shall be :Wade under Section 56
of the Charter of the Citv of Miami, as amended, located in
the area bounded by S.W. 1 Street, S.W. 7 Street, S.W. 4
Avenue and S.W. 9 Avenue.
?. This improvement shall be designated in all proceedings and
assessments as EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I,
H-4487 and the property against which special assessments
shall be made for a portion of the cost thereof, hereunder
shall be designated as EAST LITTLE HAVANA HIGlfdAY IMPROVEMENT
DISTRICT - PHASE I, H-4487.
DCB:rj
83-911
CITY MANAGER'S ESTIMATE OF COST
OF
LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES
EAST LITTLE HAVANA HIGHWAY L'13?ROVEMENT - PHASE I u-4a87
ORDERED BY RESOLUTION NO. 83-658 ADOPTED DULY 18, 1983
ESTIMATED CONSTRUCTION COST OF IMPROVEMENT ................$1,565,000
ESTIMATED INCIDENTAL EXPENSES:
Surveys; Inspection and Supervision
of work; Preparation of Plans,
Specifications and Estimates, etc ... $204,000
Printing; Publishing of notices and
proceedings; Preparation of Bonds;
Legal services, Abstracts; etc.,
and other necessary and proper
expenses............................$ 31,000
Total estimated incidental expenses......... $ 235,000
TOTAL ESTI..'ATED CONSTRUCTION COST AND INCIDENTAL
EXPENSE .................................................. $1,800,000
DISTRIBUTION:
Estimated
cost to be
paid by City of Miami......
$1,530,000
Estimated
cost of all
items to be assessed......
$
270,000
Estimated
assessment
per front foot .............
$
8.00
Estimated
assessment
per L. Ft. of curb.........
$
1.45
Estimated
assessment
per L. Ft. of curb and
gutter..........................................
$
1.60
Estimated
assessment
per L. Ft. of valley
gutter..........................................
$
1.45
Estimated
assessment
per L. Ft. of concrete
sidewalk........................................
$
2.15
Estimated
assessment
per s.y. of 8-inch
limerock base ...................................
$
1.75
Estimated
assessment
per s.y. of 1-inch
asphaltic
concrete ..............................
$
0.60
:JITNESS my signature at Miami, Florida this day of
, A.D., 1983.
CITY :LyNAGER
83-911: