Loading...
HomeMy WebLinkAboutR-83-1150J-83-1056 04 IN A RF �?Ll'T TOiI ()RD::I;; iI TT`. -., `D?: SEWER I"•1`-'i'0VE',-F,11T - t-)'VIERT(_'uilJ r'NU)i; I rR-r�Cl-C DE`T,'1i?'.TT'Itj THE? ;)F(-1T' :' 7 t, 'r,T??;- . WHTCH SPiCTAL A"F;'`'r".i1^ 1 , nR A p(�FTTC)IN 1117 ; I{i C�?;'T THi RI;� )F c, ('TTi'- •r '.SIDE; -Am � n r ,>AIII�AP,�' „E,,I:?', T?��IROVE_•�t.�1i rm-7 . T im r,ra• BE IT RESOLVED_' Y THE Cnrrl;T:' I0N nP T?II? � IT". (, i� I —L AI"T , FT ORTDA: Section 1. That a sanitary sct•.re•r improvem(-,nt ident-ifie;I as CITY-W T I)1; SANITARY SEWER TI"PROVE"•1ENT - OVERTOWN PHASE 1, SR-5501-C shall be made under the rrov.s7ons of Section 56 of the Charter of the City of I'liam:i, as }.mended, ^aid improvement to consist of: LayinC an 8" inch or lams r Vitrified Clay and/or Iron Pipe Sanitary Sewer at or near the centerline of: N.W. 4 Ave. from I1.;•!. 5 St. to ir, `:.,; .,us;!: i:::r) -r: ( -O5) N.W. 9 St. from N.11. 5 Ave. to (T-?�) l_ J N.W. 3 Ave. from I1.:7. 14 ?t, to i,d.W. 19 St;. N.W. 20 Terr. from 2 Ave. to N.W. 3 Ave. Laying six-inch (611) cast iron pipe laterals as required to the lots and parcels of land which abut upon the above -mentioned streets, includint- the lots and parcels of land described in Section 2 hereof; together with necessary manholes, other appurtc-n••:n,,es, pump stations, outfall, connections to existing; sewers, relayinc, street pavement, sidewalks, and curb and ��,utters where such relaying is made necessary by this improvement. Section 2. Special Assessments for a portion of the cost of said CITY-WIDE SANITARY SEWER IMPROVEMENT - OVERTOWN PHASE I, SR-5501-C shall be levied upon all the lots and parcels of land which abut upon the above -mentioned streets, including the following described lots and parcels of land, and such lots and parcels of land are hereby designated CITY-WIDE SANITARY SEWER IMPROVEMENT - OVERTOWN PHASE I DISTRICT SR-5501-C (CENTERLINE SEWER). CITY COMMISSION MEETING OF DEC 8 1983 RCSOLUi!On ;w83-11 1 SUBDIVISION OF LOTS 3 AND r � B_156 '. ° r rr . 24 35 BLOCK 17 OF ERICKSON ADD. : 9 & 10 8752 t.. Tract TOWNPAR K SUB. 4 r�� Tract 13 - 17 91-10 TOWNPARK SUB. 5 3, This improvement shall be designated in all proceed- . Section CITY-WIDE SANITARY SEWER IMPROVEMENT - OVERTOWN ings and assessments as SR 55 01-C and the above described properties, including all PRASE 1, 83-1150 A of latid abutti.ng the streets described in S'ec- the lots and. parcels tjori 1 hereof against t-:hlch qssessment,s shell be made for a port otz thereof hereunderi shall be des mated as CITY-WIDE of the cost IT1IPROVEMENT OVERTOWN PHASE Ti SR=r-501=C (CENTERLINE SANITARY SEWER SEWER). PASSED AND ADOPTED this 8th_......__, day o f - pecembe 3 1983. r+a A rre - P� URICE AePER gA RE r 1•7 A Y 0 R st 1 a CITY CLERK PREPARED AND APPROVED BY: DEPUTY CITY ATTORNEY ?J!�O4S GARCIA-PEDROSA CITY ATTORNEY 83-1150 I CITY OF MIAMI, FLORIDA 1,,, INTER -OFFICE MEMORANDUM TO Howard V. Gary DATE November 22, 1983 FILE: SR-5501-C City Manager SUBJECT: CITY-WIDE SANITARY SEWER IMPROVEMENT - OVERTOWN PHASE I, B-5501 Ordering FROM• Donald W. Cather REFERENCES: Resolution D for of Publi 4orks ENCLOSURES, (For Commission Meeting of V0 a�,_ December 8, 1983) The Department of Public Works recommends the adoption of the Ordering Resolution for the con- struction of CITY-WIDE SANITARY SEWER IM;PROVEMENT - OVERTOWN PHASE I DISTRICT SR-5501-C (CENTERLINE SEWER). This district consist of properties i,i the area bordered by N.W. 5 Street, N.W. 20 Terrace, N. Miami Avenue and N.W. 5 Avenue. The construction of this sanitary sewer improvement is part of the City's continuing program to provide sanitary sewers throughout the City of Miami. The area is presently served by a sewer system built in 1915, which has been found to be in need of replacement. To serve this area, the Department of Public Works has designated CITY-WIDE SANITARY SEWER IMPROVEMENT - OVERTOWN PHASE I in CITY- WIDE SANITARY SE,,1ER I1,1PROVEMENT - OVERTOWN PHASE I DISTRICT SR-5501-C (CENTERLINE SEWER), as an assessable improvement under Section 56 of the City Charter. Each property designated for assessment under the Ordering Resolution will have its existing sewer service lateral reconnected to the new lines. The CITY-WIDE SANITARY SEWER IMPROVEMENT - OVERTOWN PHASE I is included in the 1983-88 Capital Improvement Program and will be constructed by a private contractor under contract with the City of Miami. The estimated total project is $188,000, and will be funded by General Obligation Bonds. PM : mad Resolution attached. 83-1150 A FACT SHEET :J JOB NAME: - CITY-WIDE SANITARY SEWER IMPROVEMENT - OVERTOWN PHASE I SR-5501-C C.I.P. 7092 JOB SCOPE: - Construction of new 8-inch and 10-inch sanitary sewers to replace existing concrete sewers constructed in 1915. This project will be on: N.W. 4 Ave. from N.W. 5 St. to NIS X-way N.W. 9 St. from N.W. 5 Ave. to NIS X-way N.W. 3 Ave. from N.W. 14 St. to N.W. 19 Street N.W. 20 Terr. from N.W. 2 Ave. to N.W. 3 Ave. JOB SCOPE: - Estimated Construction Cost: $155,000 Estimated Total Cost: $188,000 REASON FOR WORK: - Deteriorated condition of existing sewers and the planned street rebuilding of these Streets by the City. SIZE OF AREA: - Approximate Acres: 22 Acres Approximate Population: 3,300 Persons SOURCE OF FUNDS: - General Obligation Bonds - Sanitary Sewer PROJECT HISTORY: - This project is funded by the 1976 $25,000,000 Bond Issue. 83-11SO