HomeMy WebLinkAboutR-84-0068J-83-1123
r*
RESOLUTION NO. 44—G
A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORPIED BY ACI CENTURY, INC. AT A TOTAL
COST OF $103, 700.00 FOR M.,I.P.D. - GARAGE
FLOOR RESURFACING; AND AUTHORIZING A FINAL
PAYMENT OF $18,013.66
WHEREAS, there exists a contract dated June 20, 1983
between the pity of Miami and ACI Century, Inc.; and
WHEREAS, the original contract was increased on
October 25, 1983 by Resolution No. 83-945 in the amount of
$9,900.00; and
WHEREAS, the work has been satisfactorily completed,
and ACI Century, Inc. has furnished the required documents
certifying that all bills for labor and materials have been
paid in full in connection with the aforesaid contract; and
WHEREAS, the City Manager and the Department of
Public Works recommend that the completed work be accepted
and final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE CO! -IISSION OF
THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by ACI
Century, Inc. for M.M.P.D. GARAGE FLOOR RESURFACING at a
total cost of $103,700.00 is hereby approved
Section 2. The proper officials of the City of
Miami are herewith authorized to pay $18,013.66 to ACI
Century, Inc, as full and final payment for all work performed
and all materials furnished in connection with 1I.M.P.D. -
GARAGE FLOOR RESURFACING.
PASSED AND ADOPTED this 19th day of January 1984�
A EST:
Ci Clerk
PREPARED A14D APPROVED BY: APPR
Deputy City Attorney dy
Maurice A. Ferre
Y 0 R
,D AS TO FORM
i
:torney
CORRECTNESS:
CITY COMMISSION
MEETIDIG OF
Q
J A N 19 1984 RESOLUTION iva. 8 •-68•
JRFMARW.t- ----------
G?'Y OF MIAMI, FLORIDA
69 INTER -OFFICE MEMORANOUM .
TO Howard V. Gary DATE: December 22, 1983 nLE:B-2852
City Manager
SUBJECT :q.;q. P . D . - GARAGE FLOOR
RESURFACING - Resolution for
Final Payment
FROM
Donald W. Cather REFERENCES:
Director of Public --Works
ENCLOSURES: (For Commission :1eeting of
- January 12, 1984)
I
fl,
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorizing a final
payment of $18,013.66 to ACI Century, Inc.
for M.M.P.D. - GARAGE FLOOR RESURFACING
ACI Century, Inc, has completed the project consisting of
sandblasting the concrete floor of the five level Police
Parking Garage, including some crack repairs, followed by a
slip resistant surface coating, excluding the uncovered upper
level of the garage.
The original contract amount was $93,800.00, and was increased
by Resolution No. 83-945 in the amount of $9,900 on October 25,
1983. The completed amount is $103,700.00, and it was completed
on time. The source of funds is the "Police Parking Garage
Improvement" account.
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are met.
LEL : a z
$e�olution attached
•1-10
lb
FINAL CONSTRUCTION FACT SHEET
�• FOR THE CITY MANAGER
JOB NAME mMPD - Garage Floor Resurfacing - B-2852
CONTRACTOR ACI Century, Inc.
JOB SCOPE The project consists of sandblasting the floor
of the five level police parking garage, including
crack repairs followed by a slip resistant surface
coating, excluding the uncovered upper level of
the garage located at the S.E. corner of N.W. 5
Street and N.W. 3 avenue.
REASON
FOR WORK
Stop water leaks from level to level and eliminate
slippery driving surface.
SOURCE
OF FUNDS
Police Parking Garage Improvement
PROJECT
Bids Received: 2/8/83
HISTORY
Contract Awarded: 3/18/82
Preconstruction Meeting: 8/29/83
CONTRACT
TIME
_
STARTED
9 / 19 / 8 3
CONTRACT
15 Working days plus 49 working days to have
increase
TIME
in contract approved,
remobilize
contractor's work force,
make
additional repairs to
garage
floor
SCHEDULE
COMPLETION
DATE
12/21/83
ACTUAL
_
COMPLETION
DATE
12/21/83
BID AMOUNT
$ 103,700 (Includes $9,900 increase in contract
auth. by Comm. Reso. 83-945 dated
10/25/83)
- CONTRACT
'
FINAL COST
S 103,700
CURRENT
T_TEM FOR
Resolution to accept completed and authorize
final
CONSIDERATION
payment to the contractor
84-68.