HomeMy WebLinkAboutR-84-0068J-83-1123 r* RESOLUTION NO. 44—G A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORPIED BY ACI CENTURY, INC. AT A TOTAL COST OF $103, 700.00 FOR M.,I.P.D. - GARAGE FLOOR RESURFACING; AND AUTHORIZING A FINAL PAYMENT OF $18,013.66 WHEREAS, there exists a contract dated June 20, 1983 between the pity of Miami and ACI Century, Inc.; and WHEREAS, the original contract was increased on October 25, 1983 by Resolution No. 83-945 in the amount of $9,900.00; and WHEREAS, the work has been satisfactorily completed, and ACI Century, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE CO! -IISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by ACI Century, Inc. for M.M.P.D. GARAGE FLOOR RESURFACING at a total cost of $103,700.00 is hereby approved Section 2. The proper officials of the City of Miami are herewith authorized to pay $18,013.66 to ACI Century, Inc, as full and final payment for all work performed and all materials furnished in connection with 1I.M.P.D. - GARAGE FLOOR RESURFACING. PASSED AND ADOPTED this 19th day of January 1984� A EST: Ci Clerk PREPARED A14D APPROVED BY: APPR Deputy City Attorney dy Maurice A. Ferre Y 0 R ,D AS TO FORM i :torney CORRECTNESS: CITY COMMISSION MEETIDIG OF Q J A N 19 1984 RESOLUTION iva. 8 •-68• JRFMARW.t- ---------- G?'Y OF MIAMI, FLORIDA 69 INTER -OFFICE MEMORANOUM . TO Howard V. Gary DATE: December 22, 1983 nLE:B-2852 City Manager SUBJECT :q.;q. P . D . - GARAGE FLOOR RESURFACING - Resolution for Final Payment FROM Donald W. Cather REFERENCES: Director of Public --Works ENCLOSURES: (For Commission :1eeting of - January 12, 1984) I fl, The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $18,013.66 to ACI Century, Inc. for M.M.P.D. - GARAGE FLOOR RESURFACING ACI Century, Inc, has completed the project consisting of sandblasting the concrete floor of the five level Police Parking Garage, including some crack repairs, followed by a slip resistant surface coating, excluding the uncovered upper level of the garage. The original contract amount was $93,800.00, and was increased by Resolution No. 83-945 in the amount of $9,900 on October 25, 1983. The completed amount is $103,700.00, and it was completed on time. The source of funds is the "Police Parking Garage Improvement" account. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. LEL : a z $e�olution attached •1-10 lb FINAL CONSTRUCTION FACT SHEET �• FOR THE CITY MANAGER JOB NAME mMPD - Garage Floor Resurfacing - B-2852 CONTRACTOR ACI Century, Inc. JOB SCOPE The project consists of sandblasting the floor of the five level police parking garage, including crack repairs followed by a slip resistant surface coating, excluding the uncovered upper level of the garage located at the S.E. corner of N.W. 5 Street and N.W. 3 avenue. REASON FOR WORK Stop water leaks from level to level and eliminate slippery driving surface. SOURCE OF FUNDS Police Parking Garage Improvement PROJECT Bids Received: 2/8/83 HISTORY Contract Awarded: 3/18/82 Preconstruction Meeting: 8/29/83 CONTRACT TIME _ STARTED 9 / 19 / 8 3 CONTRACT 15 Working days plus 49 working days to have increase TIME in contract approved, remobilize contractor's work force, make additional repairs to garage floor SCHEDULE COMPLETION DATE 12/21/83 ACTUAL _ COMPLETION DATE 12/21/83 BID AMOUNT $ 103,700 (Includes $9,900 increase in contract auth. by Comm. Reso. 83-945 dated 10/25/83) - CONTRACT ' FINAL COST S 103,700 CURRENT T_TEM FOR Resolution to accept completed and authorize final CONSIDERATION payment to the contractor 84-68.