HomeMy WebLinkAboutR-84-0397J-84-259
U
RESOLUTION NO. 84-397
A RESOLUTION ACCEPTING THE COMPLETED WORK
OF SOUTHERN CONSTRUCTION INTERNATIONAL CORP.
AT A TOTAL COST OF $35,093.92 FOR UPARR -
HANDICAPPED ACCESS IMPROVEMENTS - PACKAGE "D";
AND AUTHORIZING A FINAL PAYMENT OF $3,509.39
WHEREAS, there exists a contract dated A
1983 between the City of Miami and Southern Con
International Corp.; and
WHEREAS, the work has been satisfac ily leNted, 40'
and Southern Construction International rp. furn' ed
the required documents certifying all is abor
and materials have been paid in f in tonne 'on with
the aforesaid contract; and
WHEREAS, the City Manager a the artment of
Public Works reconunen th t d work be accepted
and final payment made the ntractor;
NOW, THE , B, -1 REa VED BY THE COMMISSION
OF THE CITY 0 MIAMI, F ID
Sectio The c pleted work performed by Southern
Cons i n In 1 Corp. for UPARR - HANDICAPPED
ACC I TS PACKAGE "D" at a total cost of $35,093.92
her y appr d.
S 2. The proper officials of the City of
mi ar hereby authorized to pay $3,509.39 to Southern
ns tion International Corp. as final payment for all
who performed and all materials furnished in connection
ith UPARR - HANDICAPPED ACCESS IMPROVEMENTS - PACKAGE "D11.
PASSED AND ADOPTED this 5 day of April , 1984.
C;"'y (:C)Tv1,yj 19 SION
ATTEST: Maurice A. Ferro oF
0 M A Y 0 R AFF( 5 1954
81-397
CiVy Clerk
PREPARED AND APPROVED BY: APPROVED AS TO FORM AND C(JkRE'CT14ESS--.
Deputy City Attorney
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO Howard V. Gary
City Manager
FROM: Donald W. Cather
Department of Public Works
DATE: March 12, 1984 FILE--.B-2847-D .
SUBJECT: UPARR - HANDICAPPED ACCESS
IMPROVEMENTS - PACKAGE "D" -
Resolution for Final Payment
REFERENCES:
(For Commission Meeting
ENCLOSURES: of April 5, 1984)
The Department of Public Works recommends
the adoption of the resolution accepting
the completed work and authorizing a final
payment of $3,509.39 to Southern Construction
International. Corp. for UPARR - HANDICAPPED
ACCESS IMPROVEMENTS - PACKAGE "D".
Southern Construction International Corp. has completed the
project consisting of improvements to Grapeland Heights Park,
located at 1550 Tq. 11. 37 Avenue; Roberto Clemente Park,
located at N. W. 34 Street and 1. Avenue; Set%jell Park, located
at N. 11. 1_7 Avenue and N. W. N. River Drive; and Al.l.apattah-
Comstock Park, located at Iti . 11. 1.7 Avenue and 28 Street. The
work consisted of demolition, earth work, grading and sod,
concrete and masonry work, asphalt paving and patching, and
the installation of plumbing fixtures and accessories. The
original contract amount was $37,074.00, and the completed
amount is $35,093.92. It was completed on time. The source
of funds is "Park Rehabilitation For Those With Special
Needs" account.
It is now in order for the Commission to accept the completed
work and authorize final payment, after all conditions are
met.
EL:hc
Resolution attached
cc: Manuel Alvarez
84-33 f
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME UPARR-Handicapped Access Improvements - Package "D"
B-2847
CONTRACTOR Southern Construction International Corp.
JOB SCOPE Demolition, grading and sodding, concrete, asphalt
paving, and the installation of plumbing fixtures
located at Grapeland Heights, Roberto Clemente, Sewell,
and Allpattah - Comstock Parks
REASON Allow for better access of park facilities by the
FOR WORK handicapped.
SOURCE
OF FUNDS Park Rehabilitation For Those With Special Needs
PROJECT Bids Received: 6/24/83
HISTORY Contract Awarded: 7/18/83
Preconstruction Meeting: 8/10/83
CONTRACT
TIME
STARTED 9/9/83
CONTRACT 60 Calendar days plus 9 days delay in locating water
TIME services and redesign of paved areas
SCHEDULED
COMPLETION
DATE 11/16/83
ACTUAL
COMPLETION
DATE 11/16/83
BID AMOUNT $ 37,074.00
CONTRACT
FINAL COST $ 35,093.92
CURRENT
ITEM FOR Resolution to accept completed work and authorize
CONSIDERATION final payment to the contractor.
84—'o391V