Loading...
HomeMy WebLinkAboutR-84-0397J-84-259 U RESOLUTION NO. 84-397 A RESOLUTION ACCEPTING THE COMPLETED WORK OF SOUTHERN CONSTRUCTION INTERNATIONAL CORP. AT A TOTAL COST OF $35,093.92 FOR UPARR - HANDICAPPED ACCESS IMPROVEMENTS - PACKAGE "D"; AND AUTHORIZING A FINAL PAYMENT OF $3,509.39 WHEREAS, there exists a contract dated A 1983 between the City of Miami and Southern Con International Corp.; and WHEREAS, the work has been satisfac ily leNted, 40' and Southern Construction International rp. furn' ed the required documents certifying all is abor and materials have been paid in f in tonne 'on with the aforesaid contract; and WHEREAS, the City Manager a the artment of Public Works reconunen th t d work be accepted and final payment made the ntractor; NOW, THE , B, -1 REa VED BY THE COMMISSION OF THE CITY 0 MIAMI, F ID Sectio The c pleted work performed by Southern Cons i n In 1 Corp. for UPARR - HANDICAPPED ACC I TS PACKAGE "D" at a total cost of $35,093.92 her y appr d. S 2. The proper officials of the City of mi ar hereby authorized to pay $3,509.39 to Southern ns tion International Corp. as final payment for all who performed and all materials furnished in connection ith UPARR - HANDICAPPED ACCESS IMPROVEMENTS - PACKAGE "D11. PASSED AND ADOPTED this 5 day of April , 1984. C;"'y (:C)Tv1,yj 19 SION ATTEST: Maurice A. Ferro oF 0 M A Y 0 R AFF( 5 1954 81-397 CiVy Clerk PREPARED AND APPROVED BY: APPROVED AS TO FORM AND C(JkRE'CT14ESS--. Deputy City Attorney CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO Howard V. Gary City Manager FROM: Donald W. Cather Department of Public Works DATE: March 12, 1984 FILE--.B-2847-D . SUBJECT: UPARR - HANDICAPPED ACCESS IMPROVEMENTS - PACKAGE "D" - Resolution for Final Payment REFERENCES: (For Commission Meeting ENCLOSURES: of April 5, 1984) The Department of Public Works recommends the adoption of the resolution accepting the completed work and authorizing a final payment of $3,509.39 to Southern Construction International. Corp. for UPARR - HANDICAPPED ACCESS IMPROVEMENTS - PACKAGE "D". Southern Construction International Corp. has completed the project consisting of improvements to Grapeland Heights Park, located at 1550 Tq. 11. 37 Avenue; Roberto Clemente Park, located at N. W. 34 Street and 1. Avenue; Set%jell Park, located at N. 11. 1_7 Avenue and N. W. N. River Drive; and Al.l.apattah- Comstock Park, located at Iti . 11. 1.7 Avenue and 28 Street. The work consisted of demolition, earth work, grading and sod, concrete and masonry work, asphalt paving and patching, and the installation of plumbing fixtures and accessories. The original contract amount was $37,074.00, and the completed amount is $35,093.92. It was completed on time. The source of funds is "Park Rehabilitation For Those With Special Needs" account. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. EL:hc Resolution attached cc: Manuel Alvarez 84-33 f FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME UPARR-Handicapped Access Improvements - Package "D" B-2847 CONTRACTOR Southern Construction International Corp. JOB SCOPE Demolition, grading and sodding, concrete, asphalt paving, and the installation of plumbing fixtures located at Grapeland Heights, Roberto Clemente, Sewell, and Allpattah - Comstock Parks REASON Allow for better access of park facilities by the FOR WORK handicapped. SOURCE OF FUNDS Park Rehabilitation For Those With Special Needs PROJECT Bids Received: 6/24/83 HISTORY Contract Awarded: 7/18/83 Preconstruction Meeting: 8/10/83 CONTRACT TIME STARTED 9/9/83 CONTRACT 60 Calendar days plus 9 days delay in locating water TIME services and redesign of paved areas SCHEDULED COMPLETION DATE 11/16/83 ACTUAL COMPLETION DATE 11/16/83 BID AMOUNT $ 37,074.00 CONTRACT FINAL COST $ 35,093.92 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor. 84—'o391V