CITY OF MIAM1. FLORIDA
INTER -OFFICE MEMORANDUM
TO; Howard V. Gary DATE:
City Manager
SUBJECT:
FROM: Vincent E. Grimm, Jr. REFERENCES:
Consultant
ENCLOSURES:
May 3, 1984 riLE:
World Trade Center Tower
The World Trade Center tower is under construction. Concrete for
the mezzanine and first office floor of the tower has been
poured. Columns, shearwalls and formwork for the second office
floor are also underway, and construction of the tower is now
beginning to accelerate. The construction schedule indicates
that the tourer will be substam. in,).1. r completed by December of
1985, and ;hr_;t ten /ht �,orl. rill_ be coihpleted and the building
occupied b,'; J 1a'.1010;3r(l j;. n. photoCzraph taken last week
whichh shct
At the
�>7�c-;,��ri
.; ,: ���� ,
�.�_�_:).,
ci.oc��,a�:,�__n �:_�"1011 reollired
by IUD under the
amended
submitted. to
Washington and
Jacksoizv1'1.l7.
);a„
!ron1'. :.pcct to
receive formal
notify crh
*_o,h
cce f 1,
rah,
)3 �socumentation and an approval which
will ent.ble
ti:.�,
y
to
drr-�w fund.-i from the UDAG
grant.
There arr 3('.Vera1 prtalelis with the parties involved in the
project that coi.zld have an effect on ILi-le City. As an example,
Dade Savings raised questions as to ;whether or not the garage was
constructed according to the building code. This matter was
reviewed by the Board of Rules and Appeals and it was their
determination that the building; was built in conformance with the
code. Dade, however, has filed a lawsuit in the circuit court to
overturn the Board's decision. The purpose of the suit frankly
escapes me. It is not known whether Dade's purpose is to harass
the City's Turnkey contractor on ttie garage or to obtain lower
insurance rates on the tower. Dade has refused to its
reasons to me as to why they are continuing this action.
Another problem is a lawsuit brought by ir;ipi Center A;3r ociates
against Dad( aVi27E' brthi Ih could iiuve an oil since
the stilt regUe ut . �h:3t Dade L o ehhj0lh"1 Q I`oIn c3nsu ru�L-n g the
tower until the questions of t1le suit ai-e re olved. Ii1 addition,
the suit rt que; t: drrn ge: i:i excess of 1i ;pillion, ?t iS the
City Attorneys opinion that the injunctive reques is w"iLllou-t
merit. At the present time the suit has not received a court
date and its effect on the City or on the grant would be
speculative.
0
Howard V. Gary
Page 2
Related to the construction is Dade's temporary lease of garage
space on the ground level and 9th and 10th floors required for
use by their contractor during the construction of the tower.
Negotiations are underway, however, there are differences as yet
unresolved.
Due to the delay in getting the tower construction underway,
there is a formal requirement for a time extension on the
Development Order. This matter is scheduled for presentation to
the City Commission in May.
Also under construction in the garage is the MetroMover Station
(a.k.a. the Downtown People Mover). Coordination between all
the parties involved has been worked out. The City Attorney is
j working on a lease vith Dade County on the MetroMover space
within the bu:i.ldinC,,.
Although there j- � t.n IMoC tjj.e part th,v 1_ the
garage cur t,,,Jn t�.�,.r�1. tlii i�,� � tlz� �h� _ ;�ti7 ha��� �,o be
COmpletC'C'1 by}1�. C1�:�'i' �llt:? 'i`iC�r, tlla Ll�:�tt(-:1' h;i.;' 110li been
resolved I�(.'C'.a11.1=E: �7:i t�l).( ] �j)'� i,� (: t ,'� eiI wa ini Ccnter ii;�^C)ciat@s
and Dads- �'}z�� 1),31.aiioe o.. the :funds
On the�,i r(=LicllfC1.
t: t
Although i,lris report hid,};=1_i;l:ts :-'om(3 of the major problems that
still need resolution, actual construction on the tower and the
MetroMover Station appear to be going reasonably smooth.
s
0
'rV 1-4.
al
I 22:fl
------ 1fJ4
�� � k " ,� �� � ' �� � .fir � � , � � � � '�
�, KK.
vla
...... ...... ----
kv,
i AM
lw�
IN
taut
•
Ll
.g�l -- 5/-9L-/ -
i
i
CAM
0
0
9
VZOTbUll trp!4
0
0
sot. —I
I;
j
f,41i 6
_g "'T
Kin, n
�s
Nu,
it Hf ml
Y Pg"
in
A
iL
L
OF