Loading...
HomeMy WebLinkAboutItem #22 - Discussion Item4 "fiFT AMr '� r ' s 1 t� rX r f L1 �� el" or. MIAMI# F'LORIOA Av (0' - INTSR-OPPICE MEMORANDUM � To: Manny Alvarez Special Assistant to the City Manager oAt�, May 22, 1984 -t SUSJECT: Personal Appearance Mr. John Goodknight, District Engineer, Florida Department REFERENCES: of Transportation FROM: Dotiald`W. Cater ENCLOSURESI Director of Public Works Mr. John Goodknight, District Engineer, District 6, Florida Department of Transportation has been requested to appear on the June 14 agenda to give a status report on the bifurcated ramp leading into DuPont Plaza. Please reserve a spot during the personal appearances for Mr. Goodknight and advise me of the time so that I may notify his office. DWC:rj cc: Walter Pierce, Acting Asst. City Manager Mr. John Goodknight, Florida Dept. of Transportation 4 Y iA f49. � di � 1 Vlt 61 k fs w ..+rw 7 tri`th� -event that the developer is successful in aequlelhg a ownership of at least three of the four block s in ad�ao+snt Oupoht Plaza* then the Applicant shall consider the provision of an upper level pedestrian connection' from this project to the Applicant's future development in DuPont Plaza. Condition 9t K- the land located west and south q. The Applicant will reserve 3 ` leva of the eastern right -of -way of Biscayne B oC i aterd government and will dedicate that land to the apprp g agency if the land is required for construction of a Miami River crossing or, in the event hatthat landsuch theconstruction will dedicate t City of Miami not proceed, for a public purpose. 84-627.1 near-1['P nr lamb_ msnn " S " ---- -- ON s In reply to your letter dated June 9 regarding the Miami Center Phase II DuPont Plaza Project, the Miami Center Joint Venture has not approved the proposed design of the bifurcation system and t-of-way prior to the f inal design being will not dedicate r Igh and being approved. The present submitted to the Joint Venture design is not acceptable. Insofar as a performance bond or letter of credit in the amount of $971,800 for surface improvements, it is my understanding that it is not'necessary to provide those funds prior to the issuance of a building permit or a Certificate of occupancy (Condition 15B). The front -ending of funds for the bifurcated ramps is specified in Conditions 18 and 17 as amended - it is based upon arranging loans or bond purchases from appropriate governmental agencies using the increasedvalorem I tax andeMiamisCenter tIle in funding Financial Center, Miami the improvements. S)'eq eenrely y urs, a� Theodore B. Gould Managing Joint Venturer TBG: fm cc: Charles Zwick 84-62'7. w1r7T /n!t AT ftiilft- Mif79% lf1R Aftl.wa ftv�.. k .r 1 t; - s . c. June 7, 1984<_ Mr. Theodore Gould 3e= Miami Center Joint Venture 300 Miami Center 'h 100 Chopin Plaza ! Miami, Florida 33131 Re Miami Center II DuPont Plaza Project Dear Mr. Gould: You are hereby notifiedtctDevelopment Miami Center II DuPont Plaza Proj e Order(Resolu- tions 81-840, September 24, 1981; 82-71, June 24, 1982; and 84-527, May 10, 1984) must now be met by Miami Center Joint Venture. Prompt action on your part is necessary to avoid a delay in the Florida Department of Transportation design process. Therefore, compliance with the following obligations is required !': within thirty (30) days from the date of this letter: 1. Dedication to the State of Florida of the necessary rights -of -way now owned by Miami Center Joint Venture and required by the State of Florida for transporta- tion improvements, specifically the bifurcated ramps (I-95 Downtown Distributor Extension) including the dedication along the North right-of-wayinef S.E. 4th Street (Biscayne Boulevard Way), pursuant Condition 1:a of the Development Order. 2. The provision of funds, a performance bond or a letter of credit in the amount of $971,800 (the equivalent of $813,200 in 1980 dollars) for construc- tion of surface street improvements in DuPont Plaza, less a credit of $52,000, pursuant to Condition 15a of the Development Order. 84-627.1 OFFICE OF THE CITY MANAGER 3500 Pan American Drive/Miami, Florida 33233-0708/(305) 579-6040 +e 1, 1984 e. , _ Page Too. ¢ h Front• -end funds in the amount of $13.96 milli6i i (the equivalent of $11.68 million in 18o doper for construction of the bifurcated ramps (1-95 Downtown Distributor Extension) pursuant to Condition 18 of the Development Order. You are further notified that you remain obligated to p:-rform all other conditions and requirements set forth in the Development Order. Since r 1 , H wa y City Manage HVG/GMM/bjr Certified Mail #P417 108 169 Return Receipt Requested 84-627. / Mr. Theodore Could Miami Center Limited 300 Miami Center 100 Chopin Plaza Miami, Florida 33131 Re: Miami Dear Mr. Gould: Partnership At our meeting of November 21 1983, we agreed that you would be obligated to satisfy certain conditions .in the Miami Center I (Ball Point) Development Order (Resolution 79-396, May 24, 1979, as amended) prior to the issuance of a final Certificate of Occupancy. These obligations as yet unsatisfied, are as follows: 1. A covenant to provide the amount of $250,000 (in 1983 dollars) or whatever the amount of the lowest responsible bid, whichever is less, for an overhead bridge from Bayfront Park to the DPM station -on Biscayne Boulevard, between SW 1st and 2nd Streets to .be utilized at the time the overhead bridge is found to be - necessary by the City of Miami or Metropolitan Dade County, failing which, a lien will be placed on the Miami Center II property in DuPont Plaza. (Condition 9). 2. A covenant that an overhead pedestrian connection will be provided over Biscayne Boulevard connecting Miami Center I with Miami Center II. (Condition 6). 3. A performance bond in the amount of $9711000 (April, 1984 dollars) ($813,200 in 1980 dollars) for local street improvements in DuPont Plaza provided, however, that an portional credit, as determined by the appropriate pro Department of Public Works, will be deducted for permanent local street improvements completed by the developer which are shown on Table 3.17 page 799 Exhibit "B" to Resolution 81-840 "Development of Regional Impact Assessment for Miami Center, Phase II and Southeast Bank Financial Center" prepared by South Florida Regional Planning Council December 1980. It is understood that the maximum credit for any single sheet improvement is shown in the column headed "Miami Center I" of Table 3.17 and that the credit, if any, is offset against a base of $813,200 (in 1980 dollars). (Condition 8 as it pertains to Condition 15a of the Miami Center II Development Order). Page 1 of 2 84--627. I j ' OFFICE OF THE CITY MANAGER 3500 Pan American Drive/Miami, Florida 33133/(305)579.WO t t <� Mrs. Theodore Oould Note that the Department of Public Works, by memorandum of October 28y 1983:has credited the developer with`$OOd bf r improvements pertaining to this obligation. You are also reminder' that you must comply with the various notices of building deficiencies from the Building and Zoning Division, Fire, Rescue and Inspection Services Department. Since e y I Howard V. ry City Manage Certified Nail #P 417-297-840 Return Receipt Requested Page 2 of 2 84-627.1