Loading...
HomeMy WebLinkAboutR-84-0801J-=84-655 RESOLUTION NO. 84 '8Q1 A RESOLUTION ACCEPTING THE COMPLETED WORK OF RUSSELL, INC. AT A TOTAL COST OF t- 6-1 , 7 38 • 95 FOR CITY-WIDE: PAVING PROJECT - S.W. 27TH AVENUE & N. W. NORTH RIVER DRIVE AND AUTHORIZING A FINAL PAYMENT OF $9,519.13 WHEREAS, there exists a contract dated November 1, 1984 between the City of Miami, Florida and Russell, Inc. for City -Wide Paving Project - S. W. 27th Avenue and N.W. North River Drive; and WHEREAS, the work has been satisfactorily completed and Russell Inc. has furnished the required documents certifying that all bills for labor and material have been paid in full in connection with the aforesaid project; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Russell, Inc. for City Wide Paving Project - S.W. 27th Avenue and N.W. North River Drive at a total cost of $67,738.96 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $9,519.13 to Russell, Inc. as full and final payment for all work performed and all materials furnished in connection with CITY WIDE PAVING PROJECT - S.W. 27TH AVENUE AND N.W. NORTH RIVER DRIVE. CITY COMMISSION 1 MFETINC nF liE[tih/,Iv�.� 6- PASSED AND ADOPTED this _30th day of July _ 9 1984. ATTEST: �71 P GNGIE ITY CLERK PREPARED AND APPROVED BY: 1MBERT F. CLARK DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: 00 GARCIA-PEDROSA CITY ATTORNEY Maurice A. Ferre H A Y 0 R 0 4b RK_ TO. Howard V. Gary City Manager CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM FROM: Donald W. Cather, Director Department of Public Works DATE: June 28, 1984 riLF, B--)414cg9 SU13JECT: CITY-WIDE PAVING PROJECT - S.W. 27TH AVENUE & N.W. NORTH RIVER DRIVE - Resolution for Final REFERENCED ( ym en t ENCLOSURES. (For Commission Meeting of July 30, 1984) The Department of Public Works recommends the adoption of the resolution accepting the completed work of Russell, Inc, at a total cost of $67,738.96 for City -Wide Paving Project - S.W. 27th Avenue & N.W. North River Drive and authorizing a final payment of $9,519.13 Russell, Inc. has completed City -Wide Paving Project - S.W. 27th Avenue & N.W. North River Drive which consisted of rebuilding approximately 500 lineal feet of roadway at both locations, i.e. S.W. 27th Avenue south of Dixie Highway and N.W. North River Drive west of 17th Avenue. The work included clearing and grading, asphaltic pavement, incidental curb and gutter, incidental sidewalk, storm sewer drainage and sod. The original contract amount was for $57,839.00 but was increased by $9,900 to a total of $67,739.00 by Resolution No. 84-602 dated May 24, 1984. The cost of the completed work is $67,738.96. The work was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. L :mh esolution attached 1 cc: M. Alvarez t J- FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME City Wide Paving Project - SW 27 Avenue and NW North River Drive - B-4489 CONTRACTOR Russell, Inc. JOB SCOPE Rebuild approximately 500 l.f. of SW 27 Avenue between Andros Avenue and S.W. 28 Street and approximately 500 l.f. of N.W. North River Drive between N.W. 17-19 Avenues. The work will include clearing and grading, asphaltic pavement, curb and gutter, sidewalk, storm sewers and grass. REASON FOR WORK Eliminate drainage problems and out of grade street. SOURCE OF FUNDS City Wide Paving Improvements PRO�ECT Bids Received: 8/29/83 HISTORY Contract Awarded: 10/25/83 Preconstruction Meeting: 11/30/83 CONTRACT TIME STARTED CONTRACT TIME SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE BID AMOUNT 3/20/84 45 Working days 5/21/84 5/14/84 $ 67,739.00 (Includes $9,900.00 increase in contract amount authorized by Commission Reso. 84-602 dated 5/24/84) CONTRACT FINAL COST $ 67,738.96 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor. 1011'�Ikey 84-801,