Loading...
HomeMy WebLinkAboutR-84-0800J-�G-h52 RESOLUTION NO. 84-800. A RESOLUTION ACCEPTING THE COMPLETED WORE: OF GOLDEN EAGLE ENGINEERING CONTRACTORS, INC. AT A TOTAL COST OF $860,033.23 FOR CENTRAL DRAINAGE PROJECT E-53; AND AUTHORIZING A FINAL, PAYMENT OF $4,300.16 WHEREAS, there exists a contract dated April 18, 1983 between the City of Miami, Florida and Golden Eagle Engineering Contractors Inc. for Central Drainage Project E- 53; and WHEREAS, the work has been satisfactorily completed and Golden Eagle Engineering Contractors, Inc. has furnished the required documents certifying that all bills for labor and material have been paid in full in connection with the aforesaid project; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Golden Eagle Engineering Contractors, Inc. for Central Drainage Project E-53 at a total cost of $860,033.23 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $4,300.16 to Golden Eagle Engineering Contractors, Inc, as full and final payment for all work performed and all materials furnished in connection with CENTRAL DRAINAGE PROJECT E-53• %rAS T %'VXM- ISSION of JUL aO 1934 ntti;kkKs PASSED AND ADOPTED this 30th day of Julv_____, 1984. Maurice A. Ferre Y 0 R ATTEST: F-RKX—A,p�—HC. ONGITY CLERK PREPARED AND APPROVED BY: R F. C L A R K DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: L-e &44 'JOSE R. GARCIA-PEDROSA CITY ATTORNEY B4-800 , 40 CITY OF MIAMI, FLORIDA 31 INTER -OFFICE MEMORANDUM TO. Howard V. Gary DATE: June 28, 1984 ,.E.. B-5488 City Manager SUBJECT: CENTRAL DRAINAGE PROJECT E-53 Resolution for Final Payment FROM: Donald W. Cather, Director REFERENCES: Department of Public Works (For Commission fleeting of ENCLOSURES: July 30, 1984) ° The Department of Public ilorks recommends the adoption of the resolution accepting the completed work of Golden Eagle Engineering Contractors; Inc. at a total cost of $860,033.23 for Central Drainage Project E-53; and authorizing a final payment of $4,300.16. Golden Eagle Engineering Contractors, Inc. has completed the Central Drainage Project E-53 project which consisted of the construction of French drains, box culverts and covered ditch drainage at 42 locations throughout the City. The original contract amount was for $863,947.00 and the completed amount is $860,033.23. The work was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. Resolution attached cc: M. Alvarez l FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Central Drainage Project E-53 - B-5488 CONTRACTOR Golden Eagle Engineering Contractors, Inc. JOB SCOPE Construct French Drains, Box culverts, covered ditches, at 42 locations through out the city. REASON Construct drainage structures at locations of greatest FOR WORK need SOURCE OF FUNDS Local Drainage Projects PROJECT Bids Received: 3/29/83 HISTORY Contract Awarded: 4/6/83 Preconstruction Meeting: 4/27/83 CONTRACT TIME STARTED 7/8/83 CONTRACT 120 Working days plus 12 days delay from rain TIME and 84 days delay from design changes due to soil condi'Z-ions and extra work SCHEDULED COMPLETION DATE 5/16/84 ACTUAL COMPLETION DATE 5/16/84 BID AMOUNT $ 863,947.00 CONTRACT FINAL COST $ 860,033.23 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor.