RESOLUTION NO. 84-800.
A RESOLUTION ACCEPTING THE
COMPLETED WORE: OF GOLDEN EAGLE
ENGINEERING CONTRACTORS, INC. AT A
TOTAL COST OF $860,033.23 FOR
CENTRAL DRAINAGE PROJECT E-53; AND
AUTHORIZING A FINAL, PAYMENT OF
$4,300.16
WHEREAS, there exists a contract dated April 18,
1983 between the City of Miami, Florida and Golden Eagle
Engineering Contractors Inc. for Central Drainage Project E-
53; and
WHEREAS, the work has been satisfactorily
completed and Golden Eagle Engineering Contractors, Inc. has
furnished the required documents certifying that all bills
for labor and material have been paid in full in connection
with the aforesaid project; and
WHEREAS, the City Manager and the Department of
Public Works recommend that the completed work be accepted
and final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by Golden
Eagle Engineering Contractors, Inc. for Central Drainage
Project E-53 at a total cost of $860,033.23 is hereby
approved.
Section 2. The proper officials of the City of
Miami are hereby authorized to pay $4,300.16 to Golden Eagle
Engineering Contractors, Inc, as full and final payment for
all work performed and all materials furnished in connection
with CENTRAL DRAINAGE PROJECT E-53•
%rAS T %'VXM- ISSION
of
JUL aO 1934
ntti;kkKs
PASSED AND ADOPTED this 30th day of Julv_____,
1984.
Maurice A. Ferre
Y 0 R
ATTEST:
F-RKX—A,p�—HC. ONGITY CLERK
PREPARED AND APPROVED BY:
R F. C L A R K
DEPUTY CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
L-e &44
'JOSE R. GARCIA-PEDROSA
CITY ATTORNEY
B4-800 ,
40
CITY OF MIAMI, FLORIDA
31 INTER -OFFICE MEMORANDUM
TO. Howard V. Gary DATE: June 28, 1984 ,.E.. B-5488
City Manager
SUBJECT: CENTRAL DRAINAGE PROJECT E-53
Resolution for Final Payment
FROM: Donald W. Cather, Director REFERENCES:
Department of Public Works (For Commission fleeting of
ENCLOSURES: July 30, 1984) °
The Department of Public ilorks recommends
the adoption of the resolution accepting
the completed work of Golden Eagle
Engineering Contractors; Inc. at a total
cost of $860,033.23 for Central Drainage
Project E-53; and authorizing a final
payment of $4,300.16.
Golden Eagle Engineering Contractors, Inc. has completed the
Central Drainage Project E-53 project which consisted of the
construction of French drains, box culverts and covered
ditch drainage at 42 locations throughout the City. The
original contract amount was for $863,947.00 and the
completed amount is $860,033.23. The work was completed on
time.
It is now in order for the Commission to accept the
completed work and authorize final payment, after all
conditions are met.
Resolution attached
cc: M. Alvarez
l
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME Central Drainage Project E-53 - B-5488
CONTRACTOR Golden Eagle Engineering Contractors, Inc.
JOB SCOPE Construct French Drains, Box culverts, covered ditches,
at 42 locations through out the city.
REASON Construct drainage structures at locations of greatest
FOR WORK need
SOURCE
OF FUNDS Local Drainage Projects
PROJECT Bids Received: 3/29/83
HISTORY Contract Awarded: 4/6/83
Preconstruction Meeting: 4/27/83
CONTRACT
TIME
STARTED 7/8/83
CONTRACT 120 Working days plus 12 days delay from rain
TIME and 84 days delay from design changes
due to soil condi'Z-ions and extra
work
SCHEDULED
COMPLETION
DATE 5/16/84
ACTUAL
COMPLETION
DATE 5/16/84
BID AMOUNT $ 863,947.00
CONTRACT
FINAL COST $ 860,033.23
CURRENT
ITEM FOR Resolution to accept completed work and authorize
CONSIDERATION final payment to the contractor.