Loading...
HomeMy WebLinkAboutR-84-1018A RESOLUTION ORDERING DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-449b AND DESIGNATING THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS SHALL BE MADE FOR A PORTION OF THE COST THEREOF AS DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I, H-4498. WHEREAS, the overall condition of certain street rights of way in the downtown area has deteriorated; and _ WHEREAS, the deteriorated streets have sidewalks, curbs, gutters and pavement that are in poor and/or out of grade condition; and WHEREAS, the proposed improvements will include new asphaltic pavement, concrete curbs and/or gutters, concrete 3 sidewalk, storm drainage facilities and landscaping where feasible; and WHEREAS, DOWNTOWN] HIGHWAY IMPROVEMENT - PHASE I, H-4490 is included in the City of Miami's Capital Improvement; Program; NOW, THEREFORE, BE I.T RESOLVED BY THE COMMISSION OF THE. CITY CF MIAMI, FLORIDA: Section 1. A local improvement described as DOWNTOWN ` HIGHWAY IMPROVEMENT - PHASE I, H-4498, shall be made under Section 56 of the Charter of the City of Miami, as amended, t located in the area bordered by North 4 Street, South 2 Street, my is ` Biscayne Boulevard and West 1 Avenue. Section 2. This improvewent shall include clearing and grading, construction of asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm drainage facilities and landscaping where feasible. Section 3. This improvement shall be designated in all proceedings and assessments as DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498, and the property against which special assessments shall be made for a portion of the cost thereof, hereunder shall be designated as DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I, cm WOKU� 10MIA G OF } SEP 13 low F - • — a H-4498, with the following property descriptions by lot and block number constituting all of the pieces of property affected by the said improvements: PLAT BOOK SUBDIVISION AND PAGE BLOCK LOT COLLEGE SQUARE 90-67 - Tract 1 CHARTER ONE 87-26 - Tract A FIRST PRESBYTERIAN CHURCH 1-43 - - A.L. KNOWLTON'S MAP OF MIAMI B-41 77N 16-24 A.L. KNOWLTON'S MAP OF MIAMI B-41 78N 11-20 A.L. KNOWLTON'S MAP OF MIAMI B-41 8ON 10-18 A.L. KNOWLTON'S MAP OF MIAMI B-41 83N 2-20 A.L. KNOWLTON'S MAP OF MIAMI B-41 85N 1-20 A.L. KNOWLTON'S MAP OF MIAMI B-41 86N 1-9916-24 A.L. KNOWLTON'S MAP OF MIAMI B-41 97N 1-8,16-22 A.L. KNOWLTON'S MAP OF MIAMI B-41 98N 1-20 A.L. KNOWLTON'S MAP OF MIAMI B-41 99N 1-20 A.L. KNOWLTON'S MAP OF MIAMI B-41 10ON 3-23 A.L. KNOWLTON'S MAP OF MIAMI B-41 102N 1 A.L. KNOWLTON'S MAP OF MIAMI B-41 103N 6-10 A.L. KNOWLTON'S MAP OF MIAMI B-41 104N 1-10 A.L. KNOWLTON'S MAP OF MIAMI B-41 105N 1-10 A.L. KNOWLTON'S MAP OF MIAMI B-41 106N 1-7 A.L. KNOWLTON'S MAP OF MIAMI B-41 115N 6,8,y,11 RESUB OF LO'T 9 BLOCK 97N 3-121 - 6 PLAT OF BLOCK 127N AND 25-75 - - PORTION OF BLOCK 120N PROUTS B-65 - 6,.7 E.G. SEWELL'S RESUB OF LOTS 3-8 - 1 6,9,16 AND 17 BLOCK 106N WADDELL'S SUB OF LOTS 1-7 - b 23 AND 24 BLOCK 97N PASSED AND ADOPTED this 13th day of 5e121iember 1984. { MMurict A. Ferre MAURICE A. FERRE MAYOR ATTEST: If G. 0!I I E City Clerk APPROVED AS TO FORK ARID PREPARED AND APPROVED BY: CORRECT ' L C 11-`-" DBPUTY CITY ATTORNEY CITY ATTORNEY 2 - 4 4E r *o Howard V , Gary City Manager CITY OIL MIAMI, FLO"IDA INTER -OFFICE MEMORANDUM owtc, August 21, 1984 "Lot suuaCT DOWNTOWN HIGHWAY IMPROVEMENT PHASE I, H-4498, Resolution Ordering Raf[RENCas! D n t e (For Commission Meeting of Director of Public Works ENc�osuRc: September 13, 1984 ) The Department of Public Works recommends adoption of a resolution Ordering DOWNTOWN HIGHWAY IMPROVEMENT - PHASE I, H-4498 in DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT - PHASE I, H-4498. In a continuing effort to serve the residents of the City of Miami, a local improvement described as DOWNTOWN HIGHWAY IMPROVEMENT - PHASE 1, H-4496, is being proposed as an assessable improvement under section 56 of the Charter of the City of Miami. This district is located in the area bordered by North 4 Street, South 2 Street, Biscayne Boulevard and West 1 Avenue. The condition of certain street rights of way in the downtown area has deteriorated. The existing sidewalk, curb, gutters and pavement are in poor and/or out of grade condition. All of these problems will be corrected on the streets included in DOWNTOWN HIGHWAY IMPROVEMENT - PHASE I, H-4498. The proposed construction will include clearing and grading, asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm drainage facilities and landscaping where feasible. DOWNTOWN HIGHWAY IMPROVEMENT - PHASE I, is included in the City of Miami's 1983-89 Capital Improvement Program. The construction of this improvement will be funded by Highway and Storm Sewer General Obligation Bond Funds and local option gas tax funds. The estimated total cost of this project is ;1,235,000. This improvement shall be designated in all proceedings and assessments as DOWNTOWN HIGHWAY IMPROVEMENT - PHASE I, H-4498 and the property against Which special assessments shall be made for a portion of the cost thereof, shall be designated as DOWNTOWN HIGHWAY IMPROVEMENT - PHASE I, H-4498. Csctdt esolution attached cc: Kanual Alvarez -}_