Loading...
HomeMy WebLinkAboutR-84-1012J-84-830 A 11 RESOLUTION NO. —94awl"Z A RESOLUTION ACCEPTING THq COMPLETED WORK OF MET CONSTRUCTION, INC. AT A TOTAL COST OF $97,649.00 FOR CITY OF MIAMI/UNIVERSITY OF MIAMI JAMES L KNIGHT INTERNATIONAL CENTER - ENTRANCE CANOPY; ASSESSING $9,500-00 AS LIQUIDATED DAMAGES FOR 19 DAYS OVERRUN OF CONTRACT TIME; AND AUTHORIZING A FINAL PAYMENT OF $264.90. WHEREAS, there exists a contract dated January 209 1983 between the City of Miami and MET Construction, Inc.; and WHEREAS, the work, consisting of furnishing and installing a structural steel frame and canopy assembly, for the entrance to the Inter -national Center located at 400 S.E. 2nd Avenue, has been satisfactorily completed, and MET Construction, Inc. has furnished the required documents certifyina that all bills for labor, and roaterials have been paid in full in connect inn with thf- afvres,- o -- - 4 i 0 c r act ; and WHEREAS, I iquidated dartiages, for, cater run (-.,f contract time of 19 days should be deducted from the final Qaymert due the contractor; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by MET Construction, Inc. for CITY OF MIAMI/UNIVERSITY OF MIAMI JAMES L. KNIGHT INTERNATIONAL CENTER - ENTRANCE CANOPY at a total cost of $97,649.00 is hereby approved. Section 2. That liquidated damages in the amount of $9,500.00 for 19 days overrun of contract time shall be deducted from the balance due the contractor. 'A 11 Section 3. The proper officials of the City of Miami are hereby authorized to Day to MET Construction, Inc., after all adjustments are made, a balance of $264.90 as full and final payment for all work performed and all m4terials furnished in connection with CITY OF MIAMI/UNIVERSITY OF MIAMI JAMES L. KNIGHT INTERNATIONAL CENTER - ENTRANCE CANOPY. PASSED AND ADOPTED this day of_SgqtqMbet_q 19e4. ATTEST: -A N- G- E, -CITY CL.S PREPARED AND APPROVED BY: C38ERT F. CLARK DEPUTY CITY ATTORNEY APP AND CORI Maurice A. Ferre M A Y 0 R CiTY OF MIAMI. FL0I11I0A 52 lNTt/l-OFFIGr MEMORANDUM rO 'toward V. Gary DAYS: August 23 19e4 City Manager g + F,,,�Q-3149-Y sus�ccr CITY OF MIAMI /UNIVERSITY OF MIAMI JAMES L. KNIGHT INTERNATIONAL CENTER - o«: Donald W. Cather ENTRANCE CANOPY - Resolution Director of Pubi it Works R`FCRCNccs Assessing Liquidated Damagles ,r & Authorizing Final'Payment EIVCIOSUREs: (For Commission Meeting of i 1 The Department of Public Works recommends the adoption of a resolution accepting the completed work performed by MET Construction, Inc., at a total cost of $97, 649 00 ; a ssess i na a9, -J00. 00 as liquidated damages for overrun of contract time; and authorizing a final payment of $264.90. for CITY OC MIAMI/UNIVERSITY OF MIAMI JAMES L. KNIGH7 INTERNATIONAL CENTER - ENTRANCE CANOPY. MET Construction, Inc. has completed the project cons i st i na of furnishing and installing a structural steel. frame and canonv assembly, for the entrance to the International Center located at 406 S. E. 2nd Avenue. The contractor experienced considerable oroblems concerning the welding of the structural stool frame and many welds had to be redone. In addition, his canopy subcontractor was not able to complete the canopy in a timely manner. Both of these items have caused an overrun to the contract time of 19 calendar days at $500 per calendar day. This was a unit price contract in the amount of $177,649.00 less $9,500.00 as liquidated damages for 19 days overrun of contract. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. Iaz ��v lution attached cc: Manuel Alvarez 41b5� 6 P �c�l� 444 FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB AME City of Miami/University of Miami James L. Knight International Center - Entrance Canopy - B-3148-Y CONTRACTOR MET Construction, Inc. JOB SCOPE Furnish and install a structural steel frame and canopy assembly and lighting for the entrance to the International Center located at 400 S. E. 2 Avenue. REASON Provide protection from the elements to patrons of the FOR WORK Center. SOURCE City of Miami, James L. Knight International Center OF FUNDS and Parking Garage PROJECT Bids Received: 1/11/83 HISTORY Contract Awarded: 1/13/83 Preconstruction Meeting: 2/24/83 CONTRACT TIME STARTED 2/24/83 CONTRACT TIME 90 Calendar days plus 2 days delay from rain SCHEDULED COMPLETION DATE 5/26/83 y ACTUAL COKPLETION DATE 6/14/83 (An overrun of the contract time by 19 Calendar days at $500.00/day • $9,500.00) sID AMOUNT $ 102,474.00 CONTRACT !'IM COST $ 97,649.00 (Less $9,500 liquidated damages) CURRENT ITZK aOR Resolution to accept completed work, assess $9,500 CONSIDERATION liquidated damages, authorize final payment to the contractor.