HomeMy WebLinkAboutItem #26 - First Reading OrdinanceA14
J-83-836
2/1/84
ORDINANCE NO.
AN ORDINANCE AMENDING SECTION 5 OF ORDINANCE
NO. 6145, ADOPTED MATZCIJ 1.9, 19511, AS AMENDED,
WHICH ESTAST,TS1iFD FER" FOR, PMULDT14G, PLUMB-
INGr ETXCTPjCAT,, ?IFC_H7\NT(7AT- (TNCTJ1DTZ7G POILER
AND T. F"JR VT 0 R T.'rH3 T' r C T I () N -1 , J-P r P N 1 T AND
CERTIFFTCATE ?-IY ADDTN('? A NET-1 TIPViFCTION
(24) TO SAID ST-_-,CTJ0N T3FFTR.J!7 ROVIDTNG
F-TI THE ADJ'1I"U;TT'ATTVF OPFRA-
NEW FEES TO COV �. i �
TION COST INVOLVPI) IN THE OF A
PERMIT FOR BUILDING CONSTRUCTION' UNDER A
PHASED DESIGN AND CONSTRUCTION METHOD (FAST
TRACK) CONTAINING A REPEALER PROVISION, A
SEVERABILITY CLAUSE, AND PROVIDING FOR AN
EFFECTIVE DATE,
WHEREAS, the City tlanager recommends that fees be collected
from applicants to cover the cost of processing phased design and
multistage construction permit applications for building
projects; Inc A�`
WJiH)R EEAS, it is essential that fees,' bt/'e tablished as
provided herein;
N011r THEREFORE, BE ORDAIN iE COMMIS N OF THE CITY
OF MIAMI, FLORIDA:
5) ORDAIN
it
f
Section 1. S on 5 Ordinance No. 6145, adopted
i March 19, 1958, as any I d e 6,r /wh i ch provides fees for building,
p, I u,-, Bing, e I e c t r i c a a n cd mechanical (including boiler and
elevator) it-pections, permit and certificate fees is hereby
further amien ed fn the following particulars:l
"Sec: i �-rn 1 5 Fee Schedule:
i3d
BUILDING PEPr'JT FEES:
J (24) Phased Design and Construction Fees
(FAST TFACK)
Fee is to be p1jAF,,rior to Pre-
liminary Review mcetirq. :his fee
I
'6-0'ords and/or figures stricken thr,---,ch s!!_%11 he del. ted.
Un4'r-r scared -.:orris and/or figures shall be a'I'Ied. A s t v i isk s
in,4icate 07,',2Urd and ?nehanced material. Rc!7a I '- I n 9 'r, rcv i k,,),: a r e
!��w in of fret and rcT-:!in unchant,:ed.
0