HomeMy WebLinkAboutR-84-1140RESOLUTION NO. 84 -11140
A RESOLUTION CONFIRMING ORDERING RESOLUTION
NO. 84-1018 AND AUTHORIZING THE CITY CLERK TO
ADVERTISE FOR SEALED BIDS FOR THE
CONSTRUCTION OF DOWNTOWN HIGHWAY IMPROVEMENT -
PHASE I IN DOWNTOWN HIGHWAY IMPROVEMENT
DISTRICT -PHASE I H-4498.
WHEREAS, at the City Commission Meeting of September 13, 19849
Resolution No. 84-1018 was passed which ordered a highway
improvement identified as DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in
DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I H-4498; and
WHEREAS, pursuant to due public notice, a public hearing was
held before the City Commission on October lot 1984, as to any
objections to the confirmation of Resolution No. 84-1018, which
resolution ordered DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in DOWNTOWN
HIGHWAY IMPROVEMENT DISTRICT -PHASE I, H-4498; and
WHEREAS, no objections to the confirmation of said highway
improvement were sustained by the Commission, it is therefore in
order for the Commission to confirm said ordering resolution and
authorize the City Clerk to advertise for sealed bids for the
construction of said improvement;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1 . Resolution No. 84-1018 dated September 13 , 19841
hick ordered DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in DOWNTOWN
IGHWAY IMPROVEMENT DISTRICT -PHASE I H-44980 is hereby confirmed.
Section 2. The City Clerk is hereby authorized to advertise
for sealed bids for the construction of DOWNTOWN HIGHWAY
IMPROVEMENT -PHASE I in DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE
I, H-4498.
PASSED AND ADOPTED this loth day of October ,
1984.
ATTEST:
d
RAG.ONGIE
CITY CL
ERK
PREPARED AND APPROVED BY:
- — DEPUTY CITY ATTORNEY
Maurice A. Ferre
MAURICE A. FERRE
M A Y 0 R
APPROVED AS TO FORM AND
CORRECTNE
LUC A. DOU RTY
CITY ATTORNEY
o: Howard V. Gary
City Manager
CITY OF MIAMI, FLORIOA
INTER -OFFICE MEMORANDUM
DATE: September 18, 1984
FILE:
SUBJECT: DOWNTOWN HIGHWAY IMPROVEMENT -
PHASE I, H-4498 - Resolution
Confirming Ordering Resolution
PROM: REFERENCES:
Donal Cather ENCLOSURES: ( For Commission Meeting of
Director of Public Works October 11, 1984)
The Department of Public Works recommends
the adoption of a resolution confirming
Ordering Resolution No. 84-10 18 and
authorizing the City Clerk to advertise
for sealed bids for the construction of
DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in
DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -
PHASE I, H-4498.
DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498, was ordered by the City
Commission on September 13, 1984. It is now in order to confirm the
ordering resolution and to authorize advertising for bids.
A bK will be held by the City Commission on October 11,
1984. At that time the Commission will hear objections to the
confirmation of Ordering Resolution No. 84-1018.
This improvement is being proposed as an assessable improvement under
Section 56 of the Charter of the City of Miami. This district is
located in the area bordered by North 4 Street, South 2 Street,
Biscayne Boulevard and West 1 Avenue.
The condition of certain street rights of way in the downtown area
has deteriorated. The existing sidewalk, curbs, gutters and pavement
are in poor and/or out of grade condition. All of these problems
will be corrected on the streets included in DOWNTOWN HIGHWAY
IMPROVEMENT -PHASE I, H-4498. The proposed construction will include
clearing and grading, asphaltic pavement, concrete curbs and/or
gutters, concrete sidewalk, storm drainage facilities and landscaping
where feasible.
Page 1 of 2
Howard V. Gary
September 18, 1984
1
DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I is included in the City of
Miami's 1983-89 Capital Improvement Program. The construction of
this improvement will be funded by Highway and Storm Sewer General
Obligation Bond Funds and Local Option Gas Tax Funds. The estimated
total cost of this project is $1 , 235,000 .
This improvement shall be designated in all proceedings and
assessments as DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498, and the
property against which special assessments shall be made for a
portion of the cost thereof, shall be designated as DOWNTOWN HIGHWAY
IMPROVEMENT DISTRICT -PHASE I, H-4498.
DCB:rj
Resolution attached
cc: Manny Alvarez
Page 2 of 2
CITY MANAGER'S ESTIMATE OF COST
76B
LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES
DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498
ORDERED BY RESOLUTION NO. 84-1018 ADOPTED SEPTEMBER 13, 1984
ESTIMATED CONSTRUCTION COST OF IMPROVEMENT . . . . . . . . . . $1,044,000
ESTIMATED INCIDENTAL EXPENSES:
Surveys; Inspection and Supervision
of work; Preparation of Plans;
Specifications and Estimates, etc. . .$146,000
Printing; Publishing of notices
and proceedings; Preparation of
Bonds; Legal services; Abstracts;
etc., and other necessary and
proper expenses . . . . . . . . . . .$ 21,000
Total estimated incidental expense . . . . . . . . . $ 167,000
ESTIMATED INDIRECT COST . . . . . . . . . . . . . . . . . . . $ 24,000
TOTAL ESTIMATED COST OF IMPROVEMENT . . . . . . . . . . . . . . $19235000
DISTRIBUTION:
Estimated
cost to be
paid
by
City
of Miami. . . . . . . .
$1050000
Estimated
cost of all
items to
be
assessed. . . . . . . .
$
1859000
Estimated
assessments
per
front
foot:
S.E.
3 Avenue (Flagler
Street-S.E.
2 Street) . . . .
$
3.00
AllOther
Streets
. .
. .
. .
. . . . . . . . . . . .
$
19.00
Estimated
assessment
per
L.
Ft.
of curb and gutter . . .
$
3.00
Estimated
assessment
per
L.
Ft.
of concrete sidewalk.
$
5.00
Estimated
assessment
per
s.y.
of
8-inch limerock base
$
4.50
Estimated
assessment
per
s.y.
of
1-inch asphaltic
concrete
overlay . .
. .
. .
. .
. . . . . . . . . . . .
$
0.90
Estimated
assessment
per
s.y.
of
1 1/2-inch asphaltic
concrete
surface. .
. .
. .
. .
. . . . . . . . . . . .
$
1.20
WITNESS my signature at Miami, Florida, this �- day of
A.D., 1984.
CITY, RAMMI
f