Loading...
HomeMy WebLinkAboutR-84-1140RESOLUTION NO. 84 -11140 A RESOLUTION CONFIRMING ORDERING RESOLUTION NO. 84-1018 AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR SEALED BIDS FOR THE CONSTRUCTION OF DOWNTOWN HIGHWAY IMPROVEMENT - PHASE I IN DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I H-4498. WHEREAS, at the City Commission Meeting of September 13, 19849 Resolution No. 84-1018 was passed which ordered a highway improvement identified as DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I H-4498; and WHEREAS, pursuant to due public notice, a public hearing was held before the City Commission on October lot 1984, as to any objections to the confirmation of Resolution No. 84-1018, which resolution ordered DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I, H-4498; and WHEREAS, no objections to the confirmation of said highway improvement were sustained by the Commission, it is therefore in order for the Commission to confirm said ordering resolution and authorize the City Clerk to advertise for sealed bids for the construction of said improvement; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1 . Resolution No. 84-1018 dated September 13 , 19841 hick ordered DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in DOWNTOWN IGHWAY IMPROVEMENT DISTRICT -PHASE I H-44980 is hereby confirmed. Section 2. The City Clerk is hereby authorized to advertise for sealed bids for the construction of DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I, H-4498. PASSED AND ADOPTED this loth day of October , 1984. ATTEST: d RAG.ONGIE CITY CL ERK PREPARED AND APPROVED BY: - — DEPUTY CITY ATTORNEY Maurice A. Ferre MAURICE A. FERRE M A Y 0 R APPROVED AS TO FORM AND CORRECTNE LUC A. DOU RTY CITY ATTORNEY o: Howard V. Gary City Manager CITY OF MIAMI, FLORIOA INTER -OFFICE MEMORANDUM DATE: September 18, 1984 FILE: SUBJECT: DOWNTOWN HIGHWAY IMPROVEMENT - PHASE I, H-4498 - Resolution Confirming Ordering Resolution PROM: REFERENCES: Donal Cather ENCLOSURES: ( For Commission Meeting of Director of Public Works October 11, 1984) The Department of Public Works recommends the adoption of a resolution confirming Ordering Resolution No. 84-10 18 and authorizing the City Clerk to advertise for sealed bids for the construction of DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I in DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT - PHASE I, H-4498. DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498, was ordered by the City Commission on September 13, 1984. It is now in order to confirm the ordering resolution and to authorize advertising for bids. A bK will be held by the City Commission on October 11, 1984. At that time the Commission will hear objections to the confirmation of Ordering Resolution No. 84-1018. This improvement is being proposed as an assessable improvement under Section 56 of the Charter of the City of Miami. This district is located in the area bordered by North 4 Street, South 2 Street, Biscayne Boulevard and West 1 Avenue. The condition of certain street rights of way in the downtown area has deteriorated. The existing sidewalk, curbs, gutters and pavement are in poor and/or out of grade condition. All of these problems will be corrected on the streets included in DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498. The proposed construction will include clearing and grading, asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm drainage facilities and landscaping where feasible. Page 1 of 2 Howard V. Gary September 18, 1984 1 DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I is included in the City of Miami's 1983-89 Capital Improvement Program. The construction of this improvement will be funded by Highway and Storm Sewer General Obligation Bond Funds and Local Option Gas Tax Funds. The estimated total cost of this project is $1 , 235,000 . This improvement shall be designated in all proceedings and assessments as DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498, and the property against which special assessments shall be made for a portion of the cost thereof, shall be designated as DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE I, H-4498. DCB:rj Resolution attached cc: Manny Alvarez Page 2 of 2 CITY MANAGER'S ESTIMATE OF COST 76B LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES DOWNTOWN HIGHWAY IMPROVEMENT -PHASE I, H-4498 ORDERED BY RESOLUTION NO. 84-1018 ADOPTED SEPTEMBER 13, 1984 ESTIMATED CONSTRUCTION COST OF IMPROVEMENT . . . . . . . . . . $1,044,000 ESTIMATED INCIDENTAL EXPENSES: Surveys; Inspection and Supervision of work; Preparation of Plans; Specifications and Estimates, etc. . .$146,000 Printing; Publishing of notices and proceedings; Preparation of Bonds; Legal services; Abstracts; etc., and other necessary and proper expenses . . . . . . . . . . .$ 21,000 Total estimated incidental expense . . . . . . . . . $ 167,000 ESTIMATED INDIRECT COST . . . . . . . . . . . . . . . . . . . $ 24,000 TOTAL ESTIMATED COST OF IMPROVEMENT . . . . . . . . . . . . . . $19235000 DISTRIBUTION: Estimated cost to be paid by City of Miami. . . . . . . . $1050000 Estimated cost of all items to be assessed. . . . . . . . $ 1859000 Estimated assessments per front foot: S.E. 3 Avenue (Flagler Street-S.E. 2 Street) . . . . $ 3.00 AllOther Streets . . . . . . . . . . . . . . . . . . $ 19.00 Estimated assessment per L. Ft. of curb and gutter . . . $ 3.00 Estimated assessment per L. Ft. of concrete sidewalk. $ 5.00 Estimated assessment per s.y. of 8-inch limerock base $ 4.50 Estimated assessment per s.y. of 1-inch asphaltic concrete overlay . . . . . . . . . . . . . . . . . . . . $ 0.90 Estimated assessment per s.y. of 1 1/2-inch asphaltic concrete surface. . . . . . . . . . . . . . . . . . . . $ 1.20 WITNESS my signature at Miami, Florida, this �- day of A.D., 1984. CITY, RAMMI f