Loading...
HomeMy WebLinkAboutR-85-0211RESOLUTION NO.85--211 A RESOLUTION AUTHORIZING THE REDUCTION OF TIME WHICH SHALL INTERVENE BETWEEN THE DATE OF PUBLICATION OF THE NOTICE INVITING BIDS FOR THE FOR THE BAYFRONT PARK REDEVELOPMENT PROJECT-BAYWALK FILL PHASE I AND THE FINAL DATE FOR SUBMITTING BIDS FROM 15 TO 8 CALENDAR DAYS. WHEREAS, in order to construct the Bayside Specialty Center and the Bayfront Park Redevelopment Project a certain portion of Biscayne Bay must be filled; and WHEREAS, the U.S. Army Corps of Engineers is to construct the Bayfront Walkway and Facilities Project including this fill as part of the Bayfront Park Redevelopment Project; and WHEREAS, a portion of this fill area, herein designated as Phase I, within the proposed Bayside Center Limited Partnership leasehold for the Bayside Specialty Center, must be filled prior to commencement of the U.S. Army Corps of Engineers Project; and WHEREAS, in order to meet the City's contractual obligations to the Bayside Center Limited Partnership, work on the Phase I Fill Area must be completed on an expedited schedule; and WHEREAS, this necessitates a reduction in the time which shall intervene between the publication of the Notice Inviting Bids and the final date for submitting bids, in accordance with the City Code, Section 18.52.1, from 15 to 8 calendar days; and WHEREAS, all other requirements of the City Code Section 18.52.1 Competitive Sealed Bidding, will be met in this project; WHEREAS, the City Manager has made a written finding that a valid emergency now exists for a reduction in the time which shall intervene between the date of publication of the Notice Inviting Bids and the final date for submitting bids; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Page 1 of 2 Section 1. The findings set forth in the preamble to this Resolution are hereby adopted as if fully set forth in this Section. Section 2. The reduction of the time which shall intervene between the date of publication of the Notice Inviting Bids for the Bayfront Park Redevelopment Project-Baywalk Fill Phase I, and the final date for submitting bids, from 15 to 8 calendar days is hereby authorized by a two-thirds vote of the members of the City Commission. Section 3. The City Manager is hereby authorized to instruct the Department of Public Works to assist in the completion of Bid Documents including Plans and Specifications, carry out Bidding as set forth in the City Code Section 18-52.1 and as provided for herein, and submit to the City Manager for consideration by the City Commission at their earliest possible meeting, a recommendation to award the construction contract for the Bayfront Park Redevelopment Project-Baywalk Fill Phase to the lowest responsible and responsive bidder. PASSED AND ADOPTED this 28th day of February , 1985. Maurice A. Ferre Maurice A. Ferre, MayoF TTEST: la p ng e,City r PREPARED AND APPROVED BY: -Robert ark, Chief Deputy City Attorney APPRWED Aj X FORM AND CORRECTNESS: ucia A. liougn1krty, city Attorney t A 0""W, .W' CITY OF MIAMI, FLORIOA INTER -OFFICE MEMORANDUM TO Randolph B. Rosencrantz City Manager n ist FRo Asst. to a City Manager Special Projects Task Force DATE February 27, 1985 PLE SUBJECT Authorization of Emergency Purchasing Procedures, Bayfront Park Redevelopment Project- REFERENCES aywalk Fill Phase I ENCLOSURES It is recommended that the attached resool- on reducing the time between t-ie -date off` publication o the Notice Inviting Bids for the Bayfront ark Redevelopment ro ect �ay�walk Fill Phase I, and the final daEe__`or submitting bids, be approved. In order to develop the Bayside Specialty Center and the north half of the Bayfront Park Redevelopment Project an area of the bay, south of the Miamarina, is to be filled as part of the U.S. Corps of Army Engineers (C.O.E.) Bayfront Walkway and Facilities Project. A portion of this fill area, referred to as Phase I, which lies within the Bayside Center Limited Partnership leasehold must be filled prior to commencement of work by the C.O.E. In order to carry out this work and meet the schedule to which the City is obligated through our agreement with Bayside Center Limited Partnership, the project must be undertaken on an accelerated schedule. This resolution reduces the number of days during which the project is out to bid, from the required 15 to 8 calendar days. The advertisements Inviting Bids will be published in two newspapers of general circulation and all the other procedures outlined in the City Code Section 18.52.1 Competitive Sealed Bidding will be followed. To authorize this change in procedures, valid emergency related to this project resolution requires a two-thirds vote in of the City Commission. JEGI�S/mim cc: Law Department the City Manager finds that a now exists. Passage of this the affirmative by the members 85-211