Loading...
HomeMy WebLinkAboutR-85-0379r�cf;Pz. k&:_ J-85r-367 4 00 RESOLUTION N0. 85 -3 9, A RESOLUTION ACCEPTING THE COMPLETED WORK OF FRANK J. MUHAN, INC. AT A TOTAL COST OF $425,599 FOR ORANGE BOWL - FIELD LIGHTING IMPROVEMENT; AUTHORIZING AN INCREASE IN THE APRIL 30, 1984 CONTRACT WITH FRANK J. MORAN, INC. FUR SAID WORK IN THE NET AMOUNT OF $9,998; AND AUTHORIZING A FINAL PAYMENT OF $12,0'16.01; FURTHER ACCEPTING THE $6,000 DONATION OF THE ORANGE BOWL COMMITTEE TJ DEFRAY A PORTION OF THE EXTRA COST OF SPECIAL LIGHTING FEATURES REQUESTED BY THEM. WHEREAS, there exists a contract dated April 30, 1984 between the City of Miami and Frank J. Moran, Inc. for Orange Bowl - Field Lighting Improvements; and WHEREAS, the work has been satisfactorily completed and Frank J. Moran Inc, has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the repair of deteriorated structural members of all 8 light towers uncovered by the work, correction of code violations discovered in existing electrical wiring that was not being replaced as part of the project, and special lighting features requested by the Orange Bowl Committee caused an overrun in the contract amount of $24,998; and WHEREAS, Resolution #84-889 passed 7 -30-84 authorizing an increase of $15,000 in the contract amount will reduce the final overrun of the contract amount $9,998; and CITY COMMISSION MEETING OF APR 11 465 Wit ,Yo. 85"3'79. 4 p PASSED AND ADOPTED this filth day of April I 1985. MAURICE A. FERRE ATTEST: �f Cam` CRfLPH. UNGIE� CITY CLERIy:% PREPARED AND APPROVED BY: R013ERT . CLARK DEPUTY CITY ATTORNEY APPRO A TO FORM AND CORRECTNESS: LUCIA A. D GHERTY CITY ATTORNEY 3 - I 85-3"79, ya F�o WHEREAS, sufficient funds for the increased cost are available from Tourist Development Funds already allocated fi to the project; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend the increase of $9,998 to cover the increase in contract; and WHEREAS, the Orange Bowl Committee has donated a sum of $6,000 to the City of Miami to partially defray the cost of the special lighting features installed; NOW, THEREFORE, BE IT KESULVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The amount of the April 30, 1984 contract with Frank J. Moran, Inc. for Orange Bowl - Field Lighting Improvement is hereby increased in the net amount of $9,998 with monies therefore hereby allocated from Tourist Development Authority Funds. Section 2. The completed work performed by Frank J. Moran, Inc. for Orange Bowl Field Lighting Improvement is hereby accepted at a total cost of $425,599• Section J. The proper officials of the City of Miami are hereby authorized to pay to Frank J. Moran, Inc. a balance of $12,076.01 as full and final payment for all work performed and all materials furnished in connection with the aforesaid contract. Section 4. The donation of $6,000 from the orange Bowl Committee is hereby accepted. - 2 - 85-379. 1=F:' CITY OP MIAMI. FLORIDA' INTEfi-OFFICE MEMORANDUM Randolph B. Rosencrantz TO City Manager FROM' Donald W. Cather Director of Public Works BATE: March 27, 1985 ME:�, 13-2875 ORANGE BOWL - FIELD LIGHTING SUBJECT: RESOLUTION FOR INCREASE IN CONTRACT, FINAL PAYMENT AND ACCEPTING DONATION OF THE REFERENCE&ORANGE BOWL COMMITTEE - (For Commission Meeting ENCLOSURES: of April 11, 1 9 85 ) The Department of Public Works recommends the adoption of a resolution accepting the completed work of Frank J. Moran, Inc. at a total cost of $425,599; authorizing an increase in the contract amount of $9,998 and authorizing a final payment of $12,076.01; further accepting the $6,000 donation of 4.-he Orange Bowl Committee to defray a portion of the extra cost of special lighting features requested by them. Frank J. Moran, Inc. has completed she project consiscing of replacement of all of the remaining incandescent light fixtures with metal halide, fast restart fixtures, the relocation of all of the existing ma6al halide fixtures, the installation of a central control system for the lights, and the reworking of 144 existing light fixtures, all pertaining to the playing field lighting of the Orange Bowl Stadium. The specified work uncovered deteriorated structural members on all eight light towers that had to be repaired, code violations in the electrical wiring not being replaced as part of the project that had to be corrected and special lighting control features that allows for the lighting of the center of the field only as requested by the Orange Bowl Committee caused an overrun in the contract amount for the project of $24,998. Fifteen thousand dollars of the overrun has already been funded by Resolution #84-889 passed 7-30-84. It will be necessary to increase the contract amount by an additional $9,998 to cover the total overrun of the contract amount. Funds for the increase are available from Tourist Development Funds already allocated to the project. SS-379. Randolph B. Rosencrantz City Manager 1) 2 _ March 27, 1985 The Orange Bowl Committee has donated $6,000 to the City of Miami to defray a portion of the additional cost caused by the special lighting fixtures they requested. The recommended resolution will accept the completed work of the contractor, authorize the requested increase in contract, authorize final payment to the contractor and accept the donation from the Orange Bowl Committee. 1 LEL:mw Resolution attached cc: Alberto Ruder 85--3791 FINAL CONSTRUCTION FACT _SHEET FOR THE CITY MANAGER JOB NAME Orange Bowl - Field Lighting Improvement B-2875 CONTRACTOR Frank J. Moran, Inc. JOB SCOPE The project includes furnishing and installing 208 new instant restart metal halide fixtures along with reworking 144 existing metal halide fixtures, for a total of 352, removal of 300 existing incandescent fixtures relocating 64 existing metal halide fixtures, along with providing and installing a central control system for the field lighting. REASON FOR WORK Upgrade lighting system to state of the art SOURCE OF FUNDS Tourist Development Funds PROJECT Bids Received: 4/19/84 HISTORY Contract Awarded: 4/26/84 Preconstruction Meeting: 5/29/84 CONTRACT TIME STARTED 6/19/84 CONTRACT TIME 50 Working Days SCHEDULED COMPLETION DATE 8/28/84 ACTUAL COMPLETION DATE 11/16/84 BID AMOUNT $ 415,601.00 (Includes a $15,000.00 increase in contract authorized by Commission Reso. 84-889 dated 7/31/84) CONTRACT FINAL COST $ 425,599.00 CURRENT Resolution to accept the completed work, authorize ITEM FOR an increase in contract of $9,998, authorize final CONSIDERATION payment to the contractor and accept $6,000 from the Orange Bowl Committee to defray part of the overrun of contract. 85•-379.