RESOLUTION 140. 5$ 7493
A RESOLUTION ACCEPTING THE COMPLETED WORK
OF GREEN'S POOL SERVICE AT A TOTAL COST
OF $21,811.78 FOR EDISON POOL -UNDER DECK
PRESSURE PIPING REPLACEMENT; AND
AUTHORIZING A FINAL PAYMENT OF $4,531.'Td
WHEREAS, there exists a contract dated December 14,
1984 between the City of Miami and Green's Pool Service; and
WHEREAS, the work, has been satisfactorily completed,
and Green's Pool Service has furnished the required
documents certifying that all bills for labor and materials
have been paid in full in connection with the aforesaid
contract; and
WHEREAS, the City Manager and Lhe Department of Public
Works recommend that the completed work be accepted and
final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by Green's
Pool Service for EDISON POOL - UNDER DECK PRESSURE PIPING
REPLACEMENT at a total cost of $21,811.78 is hereby
approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $4,531.78 to Green's Pool
Service as full and final payment for all work performed and
all materials furnished in connection with EDISON POOL -
UNDER DECK PRESSURE PIPING REPLACEMENT.
CITY COMMISSION
MEETING OF
MAY 9 190
RESOLUTION No.
I(MARKS.
PASSED AND ADOPTED this 9th day of May ,
1985.
Maurice A. Ferre
M A Y 0 R
ATTEST:
RALPff G. ONGIE, CITY CLWK
PREPARED AND APPROVED BY:
ROBERT F. CLARK
DEPUTY CITY ATTORNEY
APPROW6D ORM AND CORRECTNESS:
L V V i A 'i . .• v
CITY ATTORN
85-483
r
CITY OIL MIAMI. PL.ORICA
LNTER-OFFICE MEMORANDUM
TO. Sergio Pereira
City Manager
FROM Donald W. Cather
Director of Public Works
DATE: April 18, 1985 04U. B-2878
SUBJECT: EDISON POOL - UNDER DECK
PRESSURE PIPING REPLACEMENT
Resolution for Final
Payment
REFERENCES:
ENCLOSURES: (For Commission Meeting
of May 9. 1985)
The Department of Public Works recommends
adoption of a resolution accepting the complete
work and authorizing a final payment of
$4,531.78 to Green's Pool Service for EDISON
POOL - UNDER DECK PRESSURE PIPING REPLACEMENT.
Green's Pool Service has completed the project consisting of
removing and replacing existing 3" steel water supply piping
with 4" PVC pipe with all necessary support brackets and
fittings. The pool is located at 525 N. W. 62 Street. The
original contract amount was for $24,700.009 and the
completed amount is $21,811.78. It was completed on time.
The source of funds is "Swimming Pool Renovations" account.
It is now in order for the City Commission to accept the
completed work and authorize final payment, after all
- conditions are met.
EMP:mw
Resolution attached
cc: Alberto Ruder
55-493
tr�
JOB NAME
CONTRACTOR
JOB SCOPE
REASON
FOR WORK
SOURCE
OF FUNDS
PROJECT
HISTORY
CONTRACT
TIME
STARTED
CONTRACT
TIME
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
Edison Pool - Under Deck Pressure Piping Replacement -
1984 B-2878
Green's Pool Service, Inc.
Remove and replace existing 3" steel water supply
piping with 4" PVC pipe with all necessary support
brackets and fittings. The pool is located at
525 N. W. 62 Street.
Badly deteriorated and leaking pipes
Swimming Pool Renovations
Bids Received: 6/19/84
Contract Awarded: 7/30/84
Preconstruction Meeting: 9/27/84
2/4/85
25 Working days plus 13 days delay in receiving wall
fittings
SCHEDULED
COMPLETION
DATE 3/28/85
ACTUAL
COMPLETION
DATE 3/28/85
BID AMOUNT $24,700.00
CONTRACT
FINAL COST $21,811.78
CURRENT
ITEM FOR Resolution to accept completed work and authorize
CONSIDERATION final payment to the Contractor.
85-493