Loading...
HomeMy WebLinkAboutR-85-0493J-85-428 0 RESOLUTION 140. 5$ 7493 A RESOLUTION ACCEPTING THE COMPLETED WORK OF GREEN'S POOL SERVICE AT A TOTAL COST OF $21,811.78 FOR EDISON POOL -UNDER DECK PRESSURE PIPING REPLACEMENT; AND AUTHORIZING A FINAL PAYMENT OF $4,531.'Td WHEREAS, there exists a contract dated December 14, 1984 between the City of Miami and Green's Pool Service; and WHEREAS, the work, has been satisfactorily completed, and Green's Pool Service has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and Lhe Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Green's Pool Service for EDISON POOL - UNDER DECK PRESSURE PIPING REPLACEMENT at a total cost of $21,811.78 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $4,531.78 to Green's Pool Service as full and final payment for all work performed and all materials furnished in connection with EDISON POOL - UNDER DECK PRESSURE PIPING REPLACEMENT. CITY COMMISSION MEETING OF MAY 9 190 RESOLUTION No. I(MARKS. PASSED AND ADOPTED this 9th day of May , 1985. Maurice A. Ferre M A Y 0 R ATTEST: RALPff G. ONGIE, CITY CLWK PREPARED AND APPROVED BY: ROBERT F. CLARK DEPUTY CITY ATTORNEY APPROW6D ORM AND CORRECTNESS: L V V i A 'i . .• v CITY ATTORN 85-483 r CITY OIL MIAMI. PL.ORICA LNTER-OFFICE MEMORANDUM TO. Sergio Pereira City Manager FROM Donald W. Cather Director of Public Works DATE: April 18, 1985 04U. B-2878 SUBJECT: EDISON POOL - UNDER DECK PRESSURE PIPING REPLACEMENT Resolution for Final Payment REFERENCES: ENCLOSURES: (For Commission Meeting of May 9. 1985) The Department of Public Works recommends adoption of a resolution accepting the complete work and authorizing a final payment of $4,531.78 to Green's Pool Service for EDISON POOL - UNDER DECK PRESSURE PIPING REPLACEMENT. Green's Pool Service has completed the project consisting of removing and replacing existing 3" steel water supply piping with 4" PVC pipe with all necessary support brackets and fittings. The pool is located at 525 N. W. 62 Street. The original contract amount was for $24,700.009 and the completed amount is $21,811.78. It was completed on time. The source of funds is "Swimming Pool Renovations" account. It is now in order for the City Commission to accept the completed work and authorize final payment, after all - conditions are met. EMP:mw Resolution attached cc: Alberto Ruder 55-493 tr� JOB NAME CONTRACTOR JOB SCOPE REASON FOR WORK SOURCE OF FUNDS PROJECT HISTORY CONTRACT TIME STARTED CONTRACT TIME FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER Edison Pool - Under Deck Pressure Piping Replacement - 1984 B-2878 Green's Pool Service, Inc. Remove and replace existing 3" steel water supply piping with 4" PVC pipe with all necessary support brackets and fittings. The pool is located at 525 N. W. 62 Street. Badly deteriorated and leaking pipes Swimming Pool Renovations Bids Received: 6/19/84 Contract Awarded: 7/30/84 Preconstruction Meeting: 9/27/84 2/4/85 25 Working days plus 13 days delay in receiving wall fittings SCHEDULED COMPLETION DATE 3/28/85 ACTUAL COMPLETION DATE 3/28/85 BID AMOUNT $24,700.00 CONTRACT FINAL COST $21,811.78 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the Contractor. 85-493