Loading...
HomeMy WebLinkAboutExhibit AATTACHMENT E-7 RESOLUTION FOR ASSISTANCE 2023 UNDER THE FLORIDA INLAND NAVIGATION DISTRICT WATERWAYS ASSISTANCE PROGRAM WHEREAS, THE City of Miami is interested in carrying out the (Name ofAgency) following described project for the enjoyment of the citizenry of Miami and the State of Florida: Project Title Design and Permitting of the Mooring Fields at Miami Marine Stadium Marina —Phase 1. Total Estimated Cost $ 300,000.00 (City_ cost $150,000.00 & FIND cost $150,000.00) Brief Description of Project: The City of Miami ("The City") is seeking funding to design and permit the mooring field at Miami Marine Stadium Marina — Phase 1. AND, Florida Inland Navigation District financial assistance is required for the program mentioned above, NOW THEREFORE, be it resolved by the City of Miami (Name ofAgency) that the project described above be authorized, AND, be it further resolved that said City of Miami (Name ofAgency) make application to the Florida Inland Navigation District in the amount of eligible 50 % of the actual cost of the project in behalf of said City of Miami (Name ofAgency) AND, be it further resolved by the City of Miami (Name ofAgency) that it certifies to the following: That it will accept the terms and conditions set forth in FIND Rule 6613-2 F.A.C. and which will be a part of the Project Agreement for any assistance awarded under the attached proposal. 2. That it is in complete accord with the attached proposal and that it will carry out the Program in the manner described in the proposal and any plans and specifications attached thereto unless prior approval for any change has been received from the District.(1) Form No. 90-21(Effective date 12-17-90, Rev. 10-14-92) That it has the ability and intention to finance its share of the cost of the project and that the project will be operated and maintained at the expense of said City of Miami for public use. (Name ofAgency) 4. That it will not discriminate against any person on the basis of race, color or national origin in the use of any property or facility acquired or developed pursuant to this proposal, and shall comply with the terms and intent of the Title VI of the Civil Rights Act of 1964, P. L. 88-352 (1964) and design and construct all facilities to comply fully with statutes relating to accessibility by persons with disabilities as well as other federal, state and local laws, rules and requirements. 5. That it will maintain adequate financial records on the proposed project to substantiate claims for reimbursement. 6. That it will make available to FIND if requested, a post -audit of expenses incurred on the project prior to, or in conjunction with, request for the final 10% of the funding agreed to by FIND. This is to certify that the foregoing is a true and correct copy of a resolution duly and legally adopted by the Miami City Commission at a legal meeting (Agency Governing Board) held on this 27th_day of April 20 23. Attest Title Signature City Manager Title (2) Form No. 90-21(Effective date 12-17-90, Rev. 10-14-92) Marine Stadium Mooring Field - Design and Permitting Fees 3/23 Budget 1 Data Collection Kickoff Meeting $ 1,400 Stakeholder Meetings $ 2,000 Public Meetings $ 2,800 Hydrographic Survey $ 2,000 Marine Resource Mapping $ 1,800 Specific Purpose Survey - upland $ 1,600 2 Planning & Design Schematic Design - marine $ 14,500 Schematic Design - upland $ 4,000 Design Development - marine $ 16,400 Design Development - upland $ 12,000 Construction Documents - marine $ 27,000 Construction Documents - upland $ 18,000 3 Permitting USACE Permit Application $ 4,400 FDEP ERP Application $ 4,400 MDC DERM Permit Application $ 5,000 USACE Permit Processing $ 18,000 FDEP Permit Processing $ 15,000 DERM Permit Processing $ 18,000 FWC Permitting $ 9,800 City Permitting Support $ 8,000 Permitting Meetings $ 6,000 Utility Permitting (WASD, FPL) $ 10,000 Reim bursable/Subconsultant Hydrographic and Marine Resource Survey $ 18,000 Updated Marine Resource Survey $ 8,000 Seagrass Mitigation Plan and Processing - Contingency $ 50,000 Specific Purpose Survey - upland $ 12,000 $ 290,100 -BMLLW CU FROM NOAAI CHART 11468 FAIRWAY i1 75' /CHANNEL �;L(7) g ~ n Tfl x(7) FAIRWAY FAIRWAY zi) / 75 ) LIMITS OF G Y FAIRWAY MOORING FIELD MF28 MF27 MF26 6 MF25 MF24 RE v MF23 MF22 MF21 MF20 1 5-SM �'��' �'— .�..A��^\ ��C y�� (7) MF19 I I MF7'�`• MF17 BV col 01010 /Io © J/o o (�� ;;(6) 200 3 L�J C��!' /•�� •LO 10 11� 12 l 1 29� 30 1 31 J 32 1 331 34 J 35 • 31 37 38 x(6) 1 G / 6) -' O O '-'7 �� `.� mot'.'.•, •' MF76 13 L' 14 15 • 16 17 18*� 19 20 �MF7 MF8 MF9 Po ¢ M170 MF11 558 - / AI m '.. •�,..Lr • .N •MS F__ ___ _________ _ B)_'.1�X 25 • MF15 26 47X(6) 21 22 23 24 MF1 MF2 MF3 4 x(9) )M4 MF14 (8) (6)b I 6) 6) Vo EXIST (6) ING n (B) / CHANNELJ MIAMI MARINE I VVV .STADIUM �y J APROXIMATE LIMITS ra OF MIAMI BOAT SHOW RICKENBACKER MARINA MARINE STADIUMMARINA *pT� 1`� F \ .s,�- \1 "B" + 5-101 a1•;'+�"„�r!"��' ;��, 4 EXISTING 4 -MIAMI ROWING — CLVB - EXISTING MARINA FACILITIES y' RICK NBACKER CAUSEWAY 913 83 MOORING RELD PLAN s-mt SCALE: t'= 250' Al ENLARGED PLAN 5-t01 SCALE: 1 -100 1 1 2 Datums fo' 8723214,, Virginia'Key, FL LEGEND — . — MOORING FIELD LIMITS (6) DEPTH SOUNDING FROM NOAA j NAUTICAL CHART 11468 2 Z g MOORING M LL 1\ 1 w z o w ` LIMITS OF SWING CIRCLE Q ¢ Z 20 2 O MOORING FIELD SLIP MIX 2 LOA VESSEL DRAFT MIN SWING DIAMETER COUNT 9. 50' S.5' 160' 17 35R 60' S.5' 180' 31 65R I IOIAL 1 48 110UM I Ill P o� 2 6 3g 6 0 NOTE. - `u - s �g1. ALL ELEVATIONS PROVIDED ARE IN - u FEET WITH RESPECT TO MLLW. _ 0' 0' 0' 00' SCALE: 1"=250' 10102 too' 0' too' 00' SCALE: 1 "=100' PERMIT DRAWINGS 15 JANUARY 2018NOT ENDEI TO BE USED FOR CONSTRUCTION 5