HomeMy WebLinkAboutR-85-0770RESOLUTION NO,e""%'
A RESOLUTION ORDERING COCONUT GROVE HIGHWAY
K
IMPROVEMENT -PHASE to H=4511 AND DESIGNATING
THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS
SHALL BE MADE POP A PORTION OF THE COST
:T
THEREOF AS COCONUT GROVE HIGHWAY IMPROVEMENT
_
DISTRICT=PHASE I, H-451l*
-a
WHEREAS, the overall condition of certain street ri of
k
McDo
way in the area bordered by Florida Avenue, Day Aveneted'
Street (S. W- 32 Avenue) and Plata Street has dete hd
WHEREAS, the deteriorated streets have p ay poor;
condition due to extehSive on -street parki" ave tha
narrow, in poor condition and/or out o ade; ewa fists
only at scattered sites, and drainage p ems exist and
?,
';
WHEREAS, the proposed imp en will elude new
asphaltic pavement, concrete curbs /or ers, concrete
fi
sidewalk, storm drainage fac eaping; and
WHEREAS, COCONUT GR HIG IMPROVE NT-PHASE I, H-4511,
is included in the Ci of t 's tal Improvement Program;
�i
NOW, THEREFO BE T RESO BY THE COMMISSION OF THE CITY
OF MIAMI, FLORID
Sectio 1. local im vement described as COCONUT GROVE
,r
HIGHWAY RO EMENT- H-4511, shall be made under Section
56 of f the City of Miami, as amended, located in
area rdered Florida Avenue, Day Avenue, McDonald Street
A"
S. W. 2 A nd Plaza Street.,
ectio 2. This improvement shall include clearing and
ing, nstruction of asphaltic pavement, concrete curbs
and utters, concrete sidewalk, storm drainage facilities and
�scaped areas,
;
,`may ((## '*jjON
Ty
JUL 8 00
4$ 4101144 4
Section 3& This improvesfsent shall be designated if! all
C C NUT GROVE HIGHiJAY IMPROVEMENT=
1..�"
proceedinga and assesatMents as 0 0
PHASE I; H-4511 and the property
against which special
Y:
asae88ttehts shall be made for a portion of the cost thereof)
hereunder shall be designated as
COCONUT GROVE HIGHWAY
IMPROVEMENT DISTRICT -PHASE I, H-45i1 with
the following property
descriptions by lot and block number
constituting all of the
pieces of property affected by the said
improvemehtss
PLAT BOOK
SUBDIVISION AND PAGE
BLOCK T
J.T. PROW HOMESTEAD B-W6
1 A 2-15
;
2 , 9-1
3 6, 11
8 0
9
1 A, 2-15
> a1
18
13 0
14 1 -16
1
1
1 8
20 ,B,2, 5-12,15
2 1-9
1-10
1-8
PERRY FROW RE -SUB 27-
- 1, 2, 5, 6
G. E. MERRICK -11
-- 1-8
PALMHURST 2
-- 194-213
RAINBOW PLAZA 8
-- Tract A.
PASSED A ADOPT t is
18th day of
,< <
Jul : 1
}
r,
Maurice A. Ferre
MAURICE A. FERRE
.
M A Y 0 R
TTESi
_,
ALPH ONGIE
I .LERR
APPROV AS TO FORM AND
RED AND APPROVED BY: CORR NESS�
RO' ERT F: CLARK _ 1atlCIA DO GHERTY
DEPUTY CITY ATTORNEY CITY ATTORNEY
x
j
s
10
city t5ft WAW. PL:614115A
1NfiE44PR#fig hiEMOi3AWD41M 1
. Honorably Mayor and '•1etbers , ' _
0 , GAi.=
`he i` t":5ittidsi0h j
Si F31E:'. GROVE H1 Jtl+itjt�t
i tl8.14ENT- PH:: 58 t H-4J 1 1
2 �
"
Resolution Otadetling
ct(5M 4E-ERENCES
Sergio :�e eir irbr Co:ission ieeting
>ity ;Manage ENCLOSURES of ,July 18, 1385)
4.
The Department of PubIic Works recommends
adoption of a resolution ordering COCONUT
GROVE HIGHWAY1.MPROJEM NT PHASE I; H-4511 in
COCONUT GROVE' HIGHWAY I'MPROVEIMENT
PHASE I, H-45 1 1.
a
in a continuing effort to serve the residents of the City ofMiami,
a local improvement described as COCONUT GROVE HIGHWAY IMPROVEMENT-
,
PHASE I, H-4511, is being proposed as an assessable improvement
4F
under Section 56 of the Charter of the City of Miami. This
district is located in the area; bordered by Florida Avenue, Day
Avenue, McDonald Street (S. W. 32 avenue) and Plaza Street.
The condition of certain street rights of way in the Coconut Grove
area has deteriorated. The pavement is narrow, in poor condition
and/or out of grade; side parkways are in t poor condition;
¢-
sidewalk exists only at scattered sites, and drainage problems
s
exist.
All of these problems will be corrected on the streets included in
fi
COCONUT GROVE HIGHWAY IMPROVEMENT -PHASE I, H-451.1. The proposed
construction will include asphaltic pavement, concrete sidewalK,
`
concrete curbs and/or gutters, storm drainage and landscaping.
COCONUT GROVE HIGHWAY IMPROVEMENT -PHASE I is included in the City'
of Miami's 1984-90 Capital Improvement Program, The construction
{$
p,
of this improvement will be funded by Highway and :Storm Sewer
9
General Obligation Bond Funds* The estimated total cost of this
;A
project is $1.6 million,
E
Page 1 of 2
,Me 4,
y;
Hohbf4abi6- Mayne and Mi amberg
of
the City C6mmissiofi
lh�o :iil txOV..ttent shall
T e
be designated
�
in all proceediftgs and
s
-
asseseMehts as COCONUT (IRO'18 HIGHWAY IMPROVRMI VT-PHASR H-45 i j
Arid the propeNt against
Which special
aise6Sments shall be male
f`or aprsrtion oP the post
thereof`, shall be designated as r CCOrttl '
uROVE 'IIHWAY 'IMPROV8MENT
DIST 'CT -PI ASG
, H-4-1 1.
DWC:pC8,.rj
Resolution and Project Map
attached
".
:
cc: Alberto Ruder
f
t
QFJ1,.
�zt ;
Page 2 of 2
ti
a
ti
Honorable Ma%6r and Me�ibel�s of a
the CityCo�l�i�.ssioCf
x
Tnis irtprottement shall be designated in all proceedings and "
`= assess;�ents a$
COCONUT GROVE HtGH►dAY iM�'ROV�ME:iT�PHASE I f
Itnents shall be teade
and the property against Which special assess
for a portion of the cost triet�eof y mall be designated as !:OCGPiti`
45t7 J; 41QI4HWAY IMPROVE MEIV DS�'itl�'�-DHA88
Resolution and Project Map attached
} cc: Alberto Ruder:
r
} Page 2 of 2low
N
-
a --
�s
fy.
^
� 4
BIRD
AVE �
a
aft Of DAY � AVE
t
WIAWM r i RAIIIIIIIIAM LAN
E OIVAL MARK Av s
"6 OAR AVE.
AR
DITLOF (naRY� i4b
a, h �IAYI
.. ..__.,
RYR
- -. __-- FROM '� AV _ -
FLORIDA AVE.~
S E E
1 FLORIDA NAVE .
t GRAND
M N MAS AVE.
MOMA! AVE.
'r wILLIAM
t
'. NARLE AVE.'A
ji
+.
.�
s
a a fRAN41,IN .
J Avg.
""Call AVE.
LEGEND
oeness Streets • to be
Improved
ILL
COCONUT GRAVE HIGHWAY IMPRQVE�`�ENT PHASE I
-
UYt
t
t _