HomeMy WebLinkAboutR-85-1042NIMMIM11
RESOLUTION 140.
A RESOLUTION ACCEPTING THE COMPLETED WORK
OF MIRI CONSTRUCTION, INC. AT A TOTAL
COST OF $7650940.45 FOR WESTERN DRAINAGE
E-54 BID "A" AND AUTHORIZING A FINAL
PAYMENT OF $3,829.70
WHEREAS, there exists a contract dated October 21, 1984
between the City of Miami and Miri Construction, Inc.; and
WHEREAS, the work, has been satisfactorily completed,
and Miri Construction, Inc. has furnished the required
documents certifying that all bills for labor and materials
have been paid in full in connection with the aforesaid
contract; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and
final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by Miri
Construction, Inc. for WESTERN DRAINAGE E-54 BID "A" at a
total cost of $765,940.45 is hereby approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $3,829.70 to Miri Construction,
Inc. as full and final payment for all work performed and
all materials furnished in connection with WESTERN DRAINAGE
E-54 BID "A".
P ED ANX ADOPTED this loth day of OCTOBER , 1985.
AT E 14AURICE A. FERRE
( M A Y 0 R
-11 At 1111\1" ! 4124 I. JJL VL%
PREPARED AND APPROVED BY:
CHIEF DEP
APPRReD
v w[1 [[• VVVV
CITY ATTORNEY
ATTORNEY
M AND CORRECTNESS:
CITY COMMISSION
MEETING OF
OCT 1�"�
0�„19$10 4
RESOLUTION No.
iREMARKS.
2
a
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
13
TO Honorable Mayor Ferre and DATE- 0CT 4 19� FILE: B`5493-A
Members of the City Commission
SUBJECT WESTERN DRAINAGE
PROJECT E-54 (BID A)
Resolution for Final
Payment
p
FROM Sergio Per REFERENCES -
City Manager (For Commission Meeting
ENCLOSURES. of October 10, 1985)
The Department of Public Works recommends
adoption of a resolution accepting the complete
work and authorizing a final payment of
$3,829.70 to Miri Construction, Inc. for
WESTERN DRAINAGE E-54 BID "A".
Miri Construction, Inc. has completed the project consisting of
constructing 38 drainage structures in an area bounded by N.W. 9
Street to the south City limits between W. 35 Avenue and the west
City limits, with four locations in Bay Heights. The original
contract amount was for $770,663.00, and the completed amount is
$7659940.45. It was completed on time. The source of funds is
"Local Drainage Projects" account.
It is now in order for the City Commission to accept the completed
work and authorize final payment, after all conditions are met.
A�MP : az
esklution attached
cc: Alberto Ruder
s�-1042
a
0 0
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MANAGER
JOB NAME
Western Drainage Project E-54 (Bid "A") - B-5493
CONTRACTOR
Miri Construction, Inc.
JOB SCOPE
Construct 38 drainage structures in an area bounded by
the south and west Cite limits, N.W. 9 Street and West
35 Avenue.with four locations in Bay Heights.
REASON
FOR WORK
Construct drainage structures at locations of greatest
need.
SOURCE
OF FUNDS
Local Drainage Projects
PROJECT
Bids Received: 7/24/84
HISTORY
Contract Awarded: 7/31/84
Preconstruction Meeting: 9/19/84
CONTRACT
TIME
STARTED
12/21/84
i
j CONTRACT
90 Working days plus 5 days delay from rain
TIME
20 days delay for design changes due to
poor soil conditions
25 days delay for extra drainage location-s
in Bay Heights
10 days delay to relocate utility conflicts
60 day delay
SCHEDULED
—
i COMPLETION
DATE
7/25/85
ACTUAL
COMPLETION
DATE
7/25/85
BID AMOUNT
$ 770,663.00
CONTRACT
FINAL COST
$ 765,940.45
CURRENT
ITEM FOR
Resolution to accept complete work and authorize final
CONSIDERATION
payment to the contractor.