HomeMy WebLinkAboutR-85-1042NIMMIM11 RESOLUTION 140. A RESOLUTION ACCEPTING THE COMPLETED WORK OF MIRI CONSTRUCTION, INC. AT A TOTAL COST OF $7650940.45 FOR WESTERN DRAINAGE E-54 BID "A" AND AUTHORIZING A FINAL PAYMENT OF $3,829.70 WHEREAS, there exists a contract dated October 21, 1984 between the City of Miami and Miri Construction, Inc.; and WHEREAS, the work, has been satisfactorily completed, and Miri Construction, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Miri Construction, Inc. for WESTERN DRAINAGE E-54 BID "A" at a total cost of $765,940.45 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $3,829.70 to Miri Construction, Inc. as full and final payment for all work performed and all materials furnished in connection with WESTERN DRAINAGE E-54 BID "A". P ED ANX ADOPTED this loth day of OCTOBER , 1985. AT E 14AURICE A. FERRE ( M A Y 0 R -11 At 1111\1" ! 4124 I. JJL VL% PREPARED AND APPROVED BY: CHIEF DEP APPRReD v w[1 [[• VVVV CITY ATTORNEY ATTORNEY M AND CORRECTNESS: CITY COMMISSION MEETING OF OCT 1�"� 0�„19$10 4 RESOLUTION No. iREMARKS. 2 a CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM 13 TO Honorable Mayor Ferre and DATE- 0CT 4 19� FILE: B`5493-A Members of the City Commission SUBJECT WESTERN DRAINAGE PROJECT E-54 (BID A) Resolution for Final Payment p FROM Sergio Per REFERENCES - City Manager (For Commission Meeting ENCLOSURES. of October 10, 1985) The Department of Public Works recommends adoption of a resolution accepting the complete work and authorizing a final payment of $3,829.70 to Miri Construction, Inc. for WESTERN DRAINAGE E-54 BID "A". Miri Construction, Inc. has completed the project consisting of constructing 38 drainage structures in an area bounded by N.W. 9 Street to the south City limits between W. 35 Avenue and the west City limits, with four locations in Bay Heights. The original contract amount was for $770,663.00, and the completed amount is $7659940.45. It was completed on time. The source of funds is "Local Drainage Projects" account. It is now in order for the City Commission to accept the completed work and authorize final payment, after all conditions are met. A�MP : az esklution attached cc: Alberto Ruder s�-1042 a 0 0 FINAL CONSTRUCTION FACT SHEET FOR THE CITY MANAGER JOB NAME Western Drainage Project E-54 (Bid "A") - B-5493 CONTRACTOR Miri Construction, Inc. JOB SCOPE Construct 38 drainage structures in an area bounded by the south and west Cite limits, N.W. 9 Street and West 35 Avenue.with four locations in Bay Heights. REASON FOR WORK Construct drainage structures at locations of greatest need. SOURCE OF FUNDS Local Drainage Projects PROJECT Bids Received: 7/24/84 HISTORY Contract Awarded: 7/31/84 Preconstruction Meeting: 9/19/84 CONTRACT TIME STARTED 12/21/84 i j CONTRACT 90 Working days plus 5 days delay from rain TIME 20 days delay for design changes due to poor soil conditions 25 days delay for extra drainage location-s in Bay Heights 10 days delay to relocate utility conflicts 60 day delay SCHEDULED — i COMPLETION DATE 7/25/85 ACTUAL COMPLETION DATE 7/25/85 BID AMOUNT $ 770,663.00 CONTRACT FINAL COST $ 765,940.45 CURRENT ITEM FOR Resolution to accept complete work and authorize final CONSIDERATION payment to the contractor. S" -1042 0