STORMWATER INFRASTRUCTURE
EMERGENCY OPERATIONS AND
MAINTENANCE
APRIL 2023
13860-Submittal-Juvenal Santana-PowerPoint Presentation
CITYWIDE FLOODING
APRIL 10- 12, 2023
Submitted into the public
record for item(s) NA.1 ,
on 4/13/2023 . City Clerk
From April 10 to April 12, 2023, the City of Miami experienced extremely heavy rainfall, which resulted in localized
flooding in several areas of the city. NOAA records indicate between 3 to 5 inches of rainfall in a 48-hour period in
the Miami area, and up to 7.5 inches in the last 72 hours.
f.&I.+nn • a •I•
SW-r21+.
Fine
ami Beach
t.ii rrli
Miami -Dade County. Esri. HERE, Garmin. USGS, NGA, EP
Displaying April 11, 2023 1-Day Observed Precipitation
Valid on. April 11, 2023 12 00 UTC
What is UTC time? Map Help
Flood Watch Continues
In Effect until Thursday evening
► Switch Basemap
Reset View
POWERED STD
esri
Inches
6.0
5.0
4.0
3.0
2.5
2.0
1.5
1.0
75
.50
.25
.10
.01
Coral Sprin
Fort Lauderdale
Hollywood
Hialeah
Miar�ri
Kendall
Homestead
Weather Forecast Office
Miami/South Florida
Issued Apr 13, 2023 3:21 AM EDT
Hazards
weathensoulsouthflodda
CITY MAINTAINED ROADWAYS
• NE 23 St, east of NE 4 Ave
• NE 18 St, east of NE 4 Ave
• 10NE64St
• Overtown area (in the vicinity of NW 13 St and NW 3 Ave)
• SW 48 Ct, south of Flagler St
• 2010 NW Miami Ct
• 1200 SW 18 Ave
• 3500 N. Bayhomes Dr
• NW 8 Ave and NW 25 St
• 3422 Franklin Ave
• Matilda St and Grand Ave
• 3100 Lucaya St
• SW3StandSW56Ave
• 2755 SW 33 Ct
• NW 32 St and NW 21 Ave
• NW62AveandNW5St
NE 23 St, east of NE 4 Ave
(ISeeChange 4/10/2023)
Submitted into the public record
for item(s) NA.1 , on
4/13/2023 . City Clerk
10 NE 64 Street
(RPW Operations 4/12/2023)
APRIL 2023 FLOODING "HOTSPOTS"
FDOT MAINTAINED ROADWAYS
• Biscayne Blvd
r�}r
Alri
Rl
Submitted into the public
record for item(s) NA.1 ,
on 4/13/2023 . City Clerk
• Significant flooding occurred on Biscayne Blvd between NE 10 and 15 St
Biscayne Blvd is a State controlled road, managed by the Florida Department
of Transportation (FDOT)
• This area of Biscayne Blvd is currently under construction as part of the 1-395
improvements and recurrent flooding issues have been referred to FDOT's
Construction and Maintenance offices to provide corrective measures
• FDOT has outfall partially blocked in order to reduce illicit discharge. On
going pipe lining and planned back -flow valve installation to reactivate 66"
outfall
• FDOT project includes a future pump station
• Portable pump deployed to N. Bayshore Dr and NE 13 St to alleviate
flooding on side street and provide alternate route
• City coordinating to close streets in the area to prevent cars and pedestrian
from getting stranded on Biscayne Blvd
• NW 12 Avenue, at NW 14 St and NW 28 St
• NW 36 Street, from 2 Ave to 4 Ave, from 7 Ave to 10 Ave, and at 22 Ave
• Flooding was reported to FDOT and will follow up
COUNTY MAINTAINED ROADWAYS
• NW 22 Ave, NW 28Stto36St
• N Miami Ave, NE 32 St to NE 34 St
• SW 2 Ave, south of SW 7 St
• Flooding was reported to Miami -Dade County and will follow up
a ` able Pump
ayshore Dr and NE 13 St
LOCATIONS OF PORTABLE PUMPS
Deployed pumps
1. NE54StNE7Ave
Morningside Park
2. NE 23 St by the Bay
3. MBV SE 10 St Brickell Plaza
4. N Bayhomes Dr
5. N Bayshore Dr and NE 13 St
6. N Bayshore Dr and NE 18 St
7. NW 32 St and NW 21 Ave
mew
NE 23 St
Submitted into the public
record for item(s) NA.1
on 4/13/2023 . City Clerk
MBV SE 10 St Brickell Plaza
N Bayshore Dr an
4-1
Submitted into the public
record for item(s) NA.1 ,
on 4/13/2023 . City Clerk
MAINTENANCE AND EMERGENCY
EQUIPMENT INVENTORY
Equipment Inventory
• 1 8-inch trailer pump 3,650 GPM
• 4 6-inch trailer pump 3,000 GPM
• 3 6-inch trailer pump (Fire — Rescue) 3,000 GPM
• 7 4-inch trailer pump 1,250 GPM
• 6 3-inch portable pump 330 GPM
• 10 Vactor trucks (Operations and Contractors)
kiln Ave, Miami,
ILLEGAL DISCHARGE TO PUBLIC RIGHT OF WAY
• Illegal discharge to public right of way
• Mary Brickell Area
• 1051/1042 NW 4 St
• 555 NE 15 St
• Reported to Code Compliance for Enforcement
!HI
I P: 111111 ,
••
1051/1042 NW 4 St
• Amending the City Code
Propose Legislation requiring
the Recertification of
Commercial Stormwater
Systems.
Apr 11, 2023 3.26 57
1042 Northwest 41h
Miami -Dade Co
Florka
Submitted into the
record for item(s)
on 4/13/2023 .
At • i
2 •,,' ..
ieer
!IC
" •
• WS,
a.. • . _ ..
t
public
NA.1 ,
City Clerk
Mary Brickell Area (SW 1 Ave & SW 9 St)
Reported in 2022 - Corrective actions underway
- APAPbk
555 NE 15 Street
Apr 12 2023 14 12A3 15
51
141,31111-Dade County
ADDITIONAL ACTIONS
it Submitted into the public
record for item(s) NA.1
I/ on 4/13/2023 . City Clerk
• The Department provides Weekly Stormwater Systems Cleaning Reports, per Resolution 22-0239.
• 2 vacuum (vactor) trucks and 4 additional portable pumps were delivered in late 2022.
• Staff/Contractors continue to inspect major pump stations prior to storm events and may be assigned
to physically be present during a storm event to ensure operations.
• Supervisory Control And Data Acquisition (SCADA) systems in order to remotely monitor and control
major pumps will be procured, and additional funding has been requested for next fiscal year. All pump
stations have been evaluated for necessary retrofits.
• RPW has requested the basins that are connected to major pump stations be swept on a regular basis
by the Solid Waste Department's Street sweepers. Pump station basin maps and additional canopy and
debris heavy locations have been provided for their use. Solid Waste Department will have a street
sweeping contract by June 2023.
• Additional contractor has been added to Inlet cleaning contract to expand capacity and availability.
Contract is being amended to add cleaning of covered ditches.
• 36 new localized drainage improvements projects and minor drainage repairs have been completed by
RPW Citywide Storm Sewer contractor from 2022 to 2023, with a construction cost of approximately
$5M. Design for 12 additional new localized drainage improvement projects is complete pending
additional funding for construction ($3.5M) and 20 additional locations are under design.
• Additional Citywide Storm Sewer contractor is being added to expand capacity for localized drainage
improvements.
• In the event of severe flooding of roadways, RPW will coordinate with Miami Fire and Police to close
streets to avoid damage to emergency equipment and allow for more efficient emergency operations
when needed.
STO R M WATE R SYSTEMS
MAINTENANCE
Maintenance performed from June 2022 to April 8, 2023
•
Submitted into the public
record for item(s) NA.1 ,
on 4/13/2023 . City Clerk
31,583 drainage structures and 216,768 linear feet of pipe have been cleaned
from June 2022 to April 8, 2023.
Contracted inlet and pipe cleaning annual budget $1,177,000 FY 2023.
2,217 311 service requests were completed from June 2022 to April 8, 2023.
• As of April 12, there are approximately 100 open 311 service requests for inlet
cleanings.
CARTEGRAPH - ASSET MANAGEMENT
Submitted into the public
record for item(s) NA.1 ,
on 4/13/2023 . City Clerk
• The assets are recorded in Cartegraph with
the location, type and respective details for
each.
RPW reconcile
Stormwater M
collected in Car
detailed and ac
include details
structures such
grate types.
d
the data provided in the
aster Plan with the assets
tegraph to provide a more
curate database. These
for our City's stormwater
as inverts, structure size,
Inlet cleaning and inspections are managed
in Cartegraph to keep track of maintenance
frequency.
( Requests
Bald liome Work
Ace Resources Reports Scenario
® J r.nle/ 9 ID
Er Create + Reports. 11
Deo Storm Drain Cleaning- oomol_ 30 +1
Snkkd Wearer Pickup Requrrcd {fad
All Tusks
• Last week only
Mowing/landseaping
Trees
Assigned Lobor
Submitted into the public
record for item(s) NA 1
on 4/13/2023 . ity
AVE LAYER
Search by address
Actual Star_. Actual Stop Date
Dlleatere •
CeimMurdt AtspS-Contritrutors Warn rD deCoun FOE 0= StrreiMap,Microsoft, E
Entry r.7tS'
323 194302 Cps Storm Brain Cleaning_ 4/1242023 8__ 3621 sw i8th t8 rtace
4r 12/2023 194349 opt Storm Dram Cleaning 411212023 11 ., 1600 sw 32 eve
4/12/2023 194327
Task ID: 194327
` Department: RPW-Ops Storm Drains
Activity' Ops Storm Drain Cleaning - RPW
Priority: None
Actual Start:
Address Number:
Approx. Address: 2285 Tequesta lane
Ops Storm Drain Cleaning.. 4/12/2023 10,.. 2286 Togliatti hill
District:
Asset: SW Inlet IN-6713
Status: Completed
Actual Stop: 4/12/2023
Street:
311 SR Number:
FEMA: No Maint. Grid:
Notes: Removed Sludge from 1 Type D Drain,Jetted line 30 Feet West To 1 Type D Drain
Structure
Inlet D: 1.00 inlet F3:
Inlet P5: Inlet P6:
Inlet VG: Basket:
Manhole: WeirBaffle Box:
Drainage Well: Debris Removal: 1
Pipe Jetting
French Drain {ftj: Solid Pipe (ftl: 30.00
Vacuum: Yes
Inspected: Yes
Action Taken
Jet in the Line: Yes
Mosquito Spray: Yes
SW Intel I61-4546
SW Inlet IN-27706
SW Mkt II1•6713
In
HERE, I
Completed
Campretea
Completed
09:23:04 A141
4112/2023, 09:25:17 AM
theard
Maine
Antonio Maceo
Belie Meade
&ricked Ave
FI agam i / West End #1
FI agam i / West End 02
FI agami / West End #3
FI agam i / West End #4
Lawre rice
Mary BrickeII Village
Orange Bawl
Overtown
Riverview
San Marco Island
EXISTING PUMP STATIONS AND
PROPOSED PUMP STATIONS PROJECTS
L. LABEL PROPOSED FLAW STATOONS PROJECTS
1 futr ruse FFaod Irrq ulrtgrits Ptra6e I
2 JErawales Flood Iinl tovenlent Phi 1
3 East Lithe Havana Flood 1lrprowenyrts
4 Fast F1agwri Flood LmprcNxer its
5 stor.ee t South FloNlimpro+er'r1eaa
5 Su1Ah-WestWyrencwd flood panel era.
7 56ayshore Lane'Falryiew 5lfeet Pump sYati,Ii
k.y
NWTM ST
£Xl 1WNG PLiMP S7At}aks
Approximate Address
SIDS NW 7Street, N.Sasni, FL33126
7747 N E 8 Avenue, Nell am i, FL. 33138
Median at Brtckell Avenue and SE 12Street.
6311SW 6Street, Miami, FL33144
6321SW2Street, hfiami, FL33144
S01.TamiamiCanal Road, Miami, FL33144
625O Tamiami Canal Road, Miami, FL 33144
342SW 7Avenue , NGami, FL33130
5wa1e of SW 1 Avenue, South of SW 8 Street
177SNW 75treet, 14Tiami, FL33125
1315 NW SAve nue, Miami, FL33136
L301 NW 6Street, h5ami, FL3312S
1383 South Venetian Way, ?Aami, FL 33135
neeo-
FIagarni'f
hwnT`x* a
u
•
Weill End #3 Antonio Maceo''
Flagami 1 West End 44 Z
agarm
West West End #1
End #2 I�
xs
yM 1iTn ST 1#1-4PENC
sw�mn
lJ k} O
4C
ISPOITH er
k4r + J T,WE s.
ANC .s
sx _T.1 rT
sines n
00.2
IST
Ir1,1^'n ST ws ern
FAMIUM PT
(lr11.PT
s ®G ST
w MTN ST
FE watsf.T ST
.Belle Y1eade
lr .. Sac 1r Xt11111111
jRST !?,T
1
t vertn4fn
�5 1BiT
Cann!-ar: EPA
San Marco
island
Submitted into the public record
for item(s) NA.1 , on
4/13/2023 . City Clerk
Proposed Pump Station Project,
Existing Pump Staban
Pump Station Boundaries
Antonia Mares
Bele Meade
1 1 &iridmall
'y
Flaganr
Lawi
Mary Motel VIlage
Not! 14th St
Orange - Bowl
Overtown
River Veil
San Marco Island
Westend
1 !_ 3.1'I_lCI
STORMWATER MASTER PLAN PROJECTS
Submitted into the public
record for item(s) NA.1 ,
on 4/13/2023 . City Clerk
• The 24 priority neighborhood projects include 13 new stormwater pump stations,
6 of which are in the recommended project list with Miami Forever Bonds (MFB)
and/or grants funding:
• Melrose Flood Improvements Phase I (D1) ($11M)
• Edgewater Flood Improvements Phase I (D2) ($17.1M)
• East Little Havana Flood Improvements (D3) ($37.1M)
• East Flagami Flood Improvements (D4) ($30M)
• Shorecrest South Flood Improvements (D5) ($16.1M)
• South-West Wynwood Flood Improvements (D5) ($31.7M)
• Other major Flood Improvements projects in the recommended project list with
MFB and/or grants funding:
• Allapattah Flood Improvements (D1) ($31.4M)
• Brickell Bay Drive Seawall and Flood Improvements (D2) ($27.3M)
• 8 Street Flood Improvements (D3) ($9.8M)
• Jose Marti Park Seawall, Shoreline, and Flood Improvements (D3) ($18.8M)
• Auburndale Flood Improvements (D4) ($20.9M)
• Clemente Park Flood Improvements (D5) ($14.7M)
• Seawall Repair or Replacement (D1, D2, D5) ($8.1M)
• Pump Station Retrofits (D1, D3) ($2.6M)
• Backflow Valves (D1, D2, D3, D5) ($1.3M)
OCI PROJECTS WITH
DRAINAGE IMPROVEMENTS
Submitted into the public
record for item(s) NA.1 ,
on 4/13/2023 . City Clerk
10 DESIGN PROJECTS WITH MAJOR DRAINAGE IMPROVEMENTS
• NW 7 St Rd from NW N. River Dr to NW 9 Ct (D1)
• NW 30 St from 12 Ave to NW 17 Ave; NW 13 Ave from 30 St to NW 33 St;
NW 15 Ave from NW 30 St to NW 31 St (D1)
• S. Bayshore Lane/ Fairview Street Pump Station, Phase 2 (D2)
• N. Bay Homes Drive Drainage Improvements, Phase 1B (D2)
• West Grove Roadway Improvements (Day Ave, Percival Ave, Oak Ave, Frow
Ave and Florida Ave from Brooker St to SW 37 Ave) (D2)
• Kinloch Roadway Neighborhood Improvements (D4)
• Belle Meade Circle Cul-De-Sac Improvements (D5)
• Drainage Improvements at NE 10 Avenue South of NE 79 Street (D5)
• Shorecrest Drainage Improvements (D5)
• Buena Vista Local Drainage and Road Improvements (NW 49 St and NW 50
St between N Miami Ave and NE 2 Ave) (D5)