Loading...
HomeMy WebLinkAboutSubmittal-Juvenal Santana-PowerPoint PresentationSubmitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk STORMWATER INFRASTRUCTURE EMERGENCY OPERATIONS AND MAINTENANCE APRIL 2023 13860-Submittal-Juvenal Santana-PowerPoint Presentation CITYWIDE FLOODING APRIL 10- 12, 2023 Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk From April 10 to April 12, 2023, the City of Miami experienced extremely heavy rainfall, which resulted in localized flooding in several areas of the city. NOAA records indicate between 3 to 5 inches of rainfall in a 48-hour period in the Miami area, and up to 7.5 inches in the last 72 hours. f.&I.+nn • a •I• SW-r21+. Fine ami Beach t.ii rrli Miami -Dade County. Esri. HERE, Garmin. USGS, NGA, EP Displaying April 11, 2023 1-Day Observed Precipitation Valid on. April 11, 2023 12 00 UTC What is UTC time? Map Help Flood Watch Continues In Effect until Thursday evening ► Switch Basemap Reset View POWERED STD esri Inches 6.0 5.0 4.0 3.0 2.5 2.0 1.5 1.0 75 .50 .25 .10 .01 Coral Sprin Fort Lauderdale Hollywood Hialeah Miar�ri Kendall Homestead Weather Forecast Office Miami/South Florida Issued Apr 13, 2023 3:21 AM EDT Hazards weathensoulsouthflodda CITY MAINTAINED ROADWAYS • NE 23 St, east of NE 4 Ave • NE 18 St, east of NE 4 Ave • 10NE64St • Overtown area (in the vicinity of NW 13 St and NW 3 Ave) • SW 48 Ct, south of Flagler St • 2010 NW Miami Ct • 1200 SW 18 Ave • 3500 N. Bayhomes Dr • NW 8 Ave and NW 25 St • 3422 Franklin Ave • Matilda St and Grand Ave • 3100 Lucaya St • SW3StandSW56Ave • 2755 SW 33 Ct • NW 32 St and NW 21 Ave • NW62AveandNW5St NE 23 St, east of NE 4 Ave (ISeeChange 4/10/2023) Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk 10 NE 64 Street (RPW Operations 4/12/2023) APRIL 2023 FLOODING "HOTSPOTS" FDOT MAINTAINED ROADWAYS • Biscayne Blvd r�}r Alri Rl Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk • Significant flooding occurred on Biscayne Blvd between NE 10 and 15 St Biscayne Blvd is a State controlled road, managed by the Florida Department of Transportation (FDOT) • This area of Biscayne Blvd is currently under construction as part of the 1-395 improvements and recurrent flooding issues have been referred to FDOT's Construction and Maintenance offices to provide corrective measures • FDOT has outfall partially blocked in order to reduce illicit discharge. On going pipe lining and planned back -flow valve installation to reactivate 66" outfall • FDOT project includes a future pump station • Portable pump deployed to N. Bayshore Dr and NE 13 St to alleviate flooding on side street and provide alternate route • City coordinating to close streets in the area to prevent cars and pedestrian from getting stranded on Biscayne Blvd • NW 12 Avenue, at NW 14 St and NW 28 St • NW 36 Street, from 2 Ave to 4 Ave, from 7 Ave to 10 Ave, and at 22 Ave • Flooding was reported to FDOT and will follow up COUNTY MAINTAINED ROADWAYS • NW 22 Ave, NW 28Stto36St • N Miami Ave, NE 32 St to NE 34 St • SW 2 Ave, south of SW 7 St • Flooding was reported to Miami -Dade County and will follow up a ` able Pump ayshore Dr and NE 13 St LOCATIONS OF PORTABLE PUMPS Deployed pumps 1. NE54StNE7Ave Morningside Park 2. NE 23 St by the Bay 3. MBV SE 10 St Brickell Plaza 4. N Bayhomes Dr 5. N Bayshore Dr and NE 13 St 6. N Bayshore Dr and NE 18 St 7. NW 32 St and NW 21 Ave mew NE 23 St Submitted into the public record for item(s) NA.1 on 4/13/2023 . City Clerk MBV SE 10 St Brickell Plaza N Bayshore Dr an 4-1 Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk MAINTENANCE AND EMERGENCY EQUIPMENT INVENTORY Equipment Inventory • 1 8-inch trailer pump 3,650 GPM • 4 6-inch trailer pump 3,000 GPM • 3 6-inch trailer pump (Fire — Rescue) 3,000 GPM • 7 4-inch trailer pump 1,250 GPM • 6 3-inch portable pump 330 GPM • 10 Vactor trucks (Operations and Contractors) kiln Ave, Miami, ILLEGAL DISCHARGE TO PUBLIC RIGHT OF WAY • Illegal discharge to public right of way • Mary Brickell Area • 1051/1042 NW 4 St • 555 NE 15 St • Reported to Code Compliance for Enforcement !HI I P: 111111 , •• 1051/1042 NW 4 St • Amending the City Code Propose Legislation requiring the Recertification of Commercial Stormwater Systems. Apr 11, 2023 3.26 57 1042 Northwest 41h Miami -Dade Co Florka Submitted into the record for item(s) on 4/13/2023 . At • i 2 •,,' .. ieer !IC " • • WS, a.. • . _ .. t public NA.1 , City Clerk Mary Brickell Area (SW 1 Ave & SW 9 St) Reported in 2022 - Corrective actions underway - APAPbk 555 NE 15 Street Apr 12 2023 14 12A3 15 51 141,31111-Dade County ADDITIONAL ACTIONS it Submitted into the public record for item(s) NA.1 I/ on 4/13/2023 . City Clerk • The Department provides Weekly Stormwater Systems Cleaning Reports, per Resolution 22-0239. • 2 vacuum (vactor) trucks and 4 additional portable pumps were delivered in late 2022. • Staff/Contractors continue to inspect major pump stations prior to storm events and may be assigned to physically be present during a storm event to ensure operations. • Supervisory Control And Data Acquisition (SCADA) systems in order to remotely monitor and control major pumps will be procured, and additional funding has been requested for next fiscal year. All pump stations have been evaluated for necessary retrofits. • RPW has requested the basins that are connected to major pump stations be swept on a regular basis by the Solid Waste Department's Street sweepers. Pump station basin maps and additional canopy and debris heavy locations have been provided for their use. Solid Waste Department will have a street sweeping contract by June 2023. • Additional contractor has been added to Inlet cleaning contract to expand capacity and availability. Contract is being amended to add cleaning of covered ditches. • 36 new localized drainage improvements projects and minor drainage repairs have been completed by RPW Citywide Storm Sewer contractor from 2022 to 2023, with a construction cost of approximately $5M. Design for 12 additional new localized drainage improvement projects is complete pending additional funding for construction ($3.5M) and 20 additional locations are under design. • Additional Citywide Storm Sewer contractor is being added to expand capacity for localized drainage improvements. • In the event of severe flooding of roadways, RPW will coordinate with Miami Fire and Police to close streets to avoid damage to emergency equipment and allow for more efficient emergency operations when needed. STO R M WATE R SYSTEMS MAINTENANCE Maintenance performed from June 2022 to April 8, 2023 • Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk 31,583 drainage structures and 216,768 linear feet of pipe have been cleaned from June 2022 to April 8, 2023. Contracted inlet and pipe cleaning annual budget $1,177,000 FY 2023. 2,217 311 service requests were completed from June 2022 to April 8, 2023. • As of April 12, there are approximately 100 open 311 service requests for inlet cleanings. CARTEGRAPH - ASSET MANAGEMENT Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk • The assets are recorded in Cartegraph with the location, type and respective details for each. RPW reconcile Stormwater M collected in Car detailed and ac include details structures such grate types. d the data provided in the aster Plan with the assets tegraph to provide a more curate database. These for our City's stormwater as inverts, structure size, Inlet cleaning and inspections are managed in Cartegraph to keep track of maintenance frequency. ( Requests Bald liome Work Ace Resources Reports Scenario ® J r.nle/ 9 ID Er Create + Reports. 11 Deo Storm Drain Cleaning- oomol_ 30 +1 Snkkd Wearer Pickup Requrrcd {fad All Tusks • Last week only Mowing/landseaping Trees Assigned Lobor Submitted into the public record for item(s) NA 1 on 4/13/2023 . ity AVE LAYER Search by address Actual Star_. Actual Stop Date Dlleatere • CeimMurdt AtspS-Contritrutors Warn rD deCoun FOE 0= StrreiMap,Microsoft, E Entry r.7tS' 323 194302 Cps Storm Brain Cleaning_ 4/1242023 8__ 3621 sw i8th t8 rtace 4r 12/2023 194349 opt Storm Dram Cleaning 411212023 11 ., 1600 sw 32 eve 4/12/2023 194327 Task ID: 194327 ` Department: RPW-Ops Storm Drains Activity' Ops Storm Drain Cleaning - RPW Priority: None Actual Start: Address Number: Approx. Address: 2285 Tequesta lane Ops Storm Drain Cleaning.. 4/12/2023 10,.. 2286 Togliatti hill District: Asset: SW Inlet IN-6713 Status: Completed Actual Stop: 4/12/2023 Street: 311 SR Number: FEMA: No Maint. Grid: Notes: Removed Sludge from 1 Type D Drain,Jetted line 30 Feet West To 1 Type D Drain Structure Inlet D: 1.00 inlet F3: Inlet P5: Inlet P6: Inlet VG: Basket: Manhole: WeirBaffle Box: Drainage Well: Debris Removal: 1 Pipe Jetting French Drain {ftj: Solid Pipe (ftl: 30.00 Vacuum: Yes Inspected: Yes Action Taken Jet in the Line: Yes Mosquito Spray: Yes SW Intel I61-4546 SW Inlet IN-27706 SW Mkt II1•6713 In HERE, I Completed Campretea Completed 09:23:04 A141 4112/2023, 09:25:17 AM theard Maine Antonio Maceo Belie Meade &ricked Ave FI agam i / West End #1 FI agam i / West End 02 FI agami / West End #3 FI agam i / West End #4 Lawre rice Mary BrickeII Village Orange Bawl Overtown Riverview San Marco Island EXISTING PUMP STATIONS AND PROPOSED PUMP STATIONS PROJECTS L. LABEL PROPOSED FLAW STATOONS PROJECTS 1 futr ruse FFaod Irrq ulrtgrits Ptra6e I 2 JErawales Flood Iinl tovenlent Phi 1 3 East Lithe Havana Flood 1lrprowenyrts 4 Fast F1agwri Flood LmprcNxer its 5 stor.ee t South FloNlimpro+er'r1eaa 5 Su1Ah-WestWyrencwd flood panel era. 7 56ayshore Lane'Falryiew 5lfeet Pump sYati,Ii k.y NWTM ST £Xl 1WNG PLiMP S7At}aks Approximate Address SIDS NW 7Street, N.Sasni, FL33126 7747 N E 8 Avenue, Nell am i, FL. 33138 Median at Brtckell Avenue and SE 12Street. 6311SW 6Street, Miami, FL33144 6321SW2Street, hfiami, FL33144 S01.TamiamiCanal Road, Miami, FL33144 625O Tamiami Canal Road, Miami, FL 33144 342SW 7Avenue , NGami, FL33130 5wa1e of SW 1 Avenue, South of SW 8 Street 177SNW 75treet, 14Tiami, FL33125 1315 NW SAve nue, Miami, FL33136 L301 NW 6Street, h5ami, FL3312S 1383 South Venetian Way, ?Aami, FL 33135 neeo- FIagarni'f hwnT`x* a u • Weill End #3 Antonio Maceo'' Flagami 1 West End 44 Z agarm West West End #1 End #2 I� xs yM 1iTn ST 1#1-4PENC sw�mn lJ k} O 4C ISPOITH er k4r + J T,WE s. ANC .s sx _T.1 rT sines n 00.2 IST Ir1,1^'n ST ws ern FAMIUM PT (lr11.PT s ®G ST w MTN ST FE watsf.T ST .Belle Y1eade lr .. Sac 1r Xt11111111 jRST !?,T 1 t vertn4fn �5 1BiT Cann!-ar: EPA San Marco island Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk Proposed Pump Station Project, Existing Pump Staban Pump Station Boundaries Antonia Mares Bele Meade 1 1 &iridmall 'y Flaganr Lawi Mary Motel VIlage Not! 14th St Orange - Bowl Overtown River Veil San Marco Island Westend 1 !_ 3.1'I_lCI STORMWATER MASTER PLAN PROJECTS Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk • The 24 priority neighborhood projects include 13 new stormwater pump stations, 6 of which are in the recommended project list with Miami Forever Bonds (MFB) and/or grants funding: • Melrose Flood Improvements Phase I (D1) ($11M) • Edgewater Flood Improvements Phase I (D2) ($17.1M) • East Little Havana Flood Improvements (D3) ($37.1M) • East Flagami Flood Improvements (D4) ($30M) • Shorecrest South Flood Improvements (D5) ($16.1M) • South-West Wynwood Flood Improvements (D5) ($31.7M) • Other major Flood Improvements projects in the recommended project list with MFB and/or grants funding: • Allapattah Flood Improvements (D1) ($31.4M) • Brickell Bay Drive Seawall and Flood Improvements (D2) ($27.3M) • 8 Street Flood Improvements (D3) ($9.8M) • Jose Marti Park Seawall, Shoreline, and Flood Improvements (D3) ($18.8M) • Auburndale Flood Improvements (D4) ($20.9M) • Clemente Park Flood Improvements (D5) ($14.7M) • Seawall Repair or Replacement (D1, D2, D5) ($8.1M) • Pump Station Retrofits (D1, D3) ($2.6M) • Backflow Valves (D1, D2, D3, D5) ($1.3M) OCI PROJECTS WITH DRAINAGE IMPROVEMENTS Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk 10 DESIGN PROJECTS WITH MAJOR DRAINAGE IMPROVEMENTS • NW 7 St Rd from NW N. River Dr to NW 9 Ct (D1) • NW 30 St from 12 Ave to NW 17 Ave; NW 13 Ave from 30 St to NW 33 St; NW 15 Ave from NW 30 St to NW 31 St (D1) • S. Bayshore Lane/ Fairview Street Pump Station, Phase 2 (D2) • N. Bay Homes Drive Drainage Improvements, Phase 1B (D2) • West Grove Roadway Improvements (Day Ave, Percival Ave, Oak Ave, Frow Ave and Florida Ave from Brooker St to SW 37 Ave) (D2) • Kinloch Roadway Neighborhood Improvements (D4) • Belle Meade Circle Cul-De-Sac Improvements (D5) • Drainage Improvements at NE 10 Avenue South of NE 79 Street (D5) • Shorecrest Drainage Improvements (D5) • Buena Vista Local Drainage and Road Improvements (NW 49 St and NW 50 St between N Miami Ave and NE 2 Ave) (D5) Submitted into the public record for item(s) NA.1 , on 4/13/2023 . City Clerk THANK YOU