Loading...
HomeMy WebLinkAboutR-85-1202J-85-1183 01 RESOLUTION NO. K-1202 A RESOLUTION ORDERING CITY WIDE HIGHWAY IMPROVEMENT - PHASE III H-4516 AND DESIGNATING THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS SHALL BE MADE FOR A PORTION OF THE COST THEREOF AS CITY WIDE HIGHWAY IMPROVEMENT DISTRICT - PHASE III H-4516. WHEREAS, the overall condition of N.W. 2.6 Street between N.W. 12 and 14 Avenues has deteriorated; and WHEREAS, the property owners adjacent to N.W. 26 Street between N.W. 12 and 14 Avenues have petitioned the Department of Public Works to rebuild said street; and WHEREAS, the deteriorated street has parkways in poor condition due to extensive on -street parking, pavement that is narrow, in poor condition and/or out of grade, and drainage problems exist; and WHEREAS, the proposed improvements will include new asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm drainage facilities and landscaping; and WHEREAS, CITY WIDE HIGHWAY IMPROVEMENT - PHASE III H-4516 is included in the City of Miami's Capital Improvement Program; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. A local improvement described as CITY WIDE HIGHWAY IMPROVEMENT - PHASE III H-4516 shall be made under Section 56 of the Charter of the City of Miami, as amended, located at N.W. 26 Street from M.W. 12 Avenue to N.W. 14 Avenue. Section 2. This improvement shall include clearing and grading, construction of asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm drainage facilities and landscaped areas. CITY COMMISSION MEETING OF DEC 119 1985 RESOLUTION No. REMARKS. 01 1 i i Section 3. The improvement shall be designated in all proceedings and assessments as CITY WIDE HIGHWAY IMPROVEMENT - PHASE III H-4516 and the property against which special assessments shall be made for a portion of the cost thereof, hereunder shall be designated as CITY WIDE HIGHWAY IMPROVEMENT DISTRICT - PHASE III H-4516 with the following property descriptions by lot and block number constituting all of the 1)ieces of property affected by said improvements: PLAT BOOK SUBDIVISION AND PAGE BLOCK LOT WEST END PARK AMENDED 6-142 11 5-14 WEST END PARK AMENDED 6-142 12 1,1R-26 WEST END PARK AMENDED 6-142 25 5-15 WEST END PARK AMENDED 6-142 26 1, 19-28 PASSED A14D ADOPTED this lgth day of nPCPmhPr , 1985. ATTEST: % 1�bz. MATTY HIRA CITY CLERK PREPARED AND APPROVED BY: CHIEF DEPUTY CITY ATTORNEY i 'XAVIER L. U,,K APPROVED AS TO FORM AND CORRECTNESS: 2� 6. CITY ATTORNEY - 2 - 8�-1202 W CI'I`Y OF MIAMI. FLOIQIbA INTER -OFFICE MEMORANDUM I 20 to: Honorable Mayor and Members DATE: DEC 12 1985 01I1.I<: of the City Commission SU&JECr. CITY WIDE PHASE III Resolution HIGHWAY IMPROVEMENT H-4516 Ordering i FROM: REFERENCES: i Cesar H. Odio (For Commission Meeting � ENCLOSURES: 9 City Manager of December 19, 1985) t It is recommended that a resolution be adopted ordering CITY WIDE HIGHWAY IMPROVEMENT -PHASE III H-4516 in the CITY WIDE HIGHWAY IMPROVEMENT DISTRICT -PHASE III H-4516. In a continuing effort to serve the residents of the City of Miami, a local improvement described as CITY WIDE HIGHWAY IMPROVEMENT - PHASE III H-4516, is being proposed as an assessable improvement under Section 56 of the Charter of the City of Miami. This district is located at N.W. 26 Street from N.W. 12 Avenue to N.W. 14 Avenue. The property owners adjacent to this portion of N.W. 26 Street have petitioned the Department of Public Works to rebuild 26 Street. a The condition of N.W. 26 Street has deteriorated. The pavement is in poor condition and/or out of grade; side parkways are in poor t condition; and drainage problems exist. All of these problems will be corrected on that portion of N.W. 26 Street within CITY WIDE HIGHWAY IMPROVEMENT - PHASE III. The proposed construction will r include asphaltic pavement, concrete sidewalk, concrete curbs and/or gutters, storm drainage and landscaping. CITY WIDE HIGHWAY IMPROVEMENT - PHASE III is included in the City of Miami's 1985-91 Capital Improvement Program. The construction of this improvement will be funded by Highway General Obligation Bond Funds. The estimated total cost of this project is $210,000. r Page 1 of 2 8� _1202 Honorable Mayor and Members of the Commission This improvement shall be designated in all proceedings and assessments as CITY WIDE HIGHWAY IMPROVEMENT - PHASE III H-4516 and the property against which special assessments shall be made for a portion of the cost thereof shall be designated as CITY WIDE f HIGHWAY IMPROVEMENT DISTRICT - PHASE III H-4516. DWC:DCB:gc V Resolution, Project Map and Petition attached cc: Albert Ruder r� I i 1 } II!I y 8�i202