A RESOLUTION ACCEPTING THE COMPLETED WORK
OF WESTERN WATERPROOFING CO. OF AMERICA
AT A TOTAL COST OF $199320.00 FOR FIRE
RESCUE TRAINING CENTER - TRAINING POOL
REPAIR - B-2773-A; AND AUTHORIZING A
FINAL PAYMENT OF $19932.00.
WHEREAS, there exists a contract dated May 2, 1985
between the City of Miami and Western Waterproofing Co. of
America, and
WHEREAS, the work, has been satisfactorily completed,
and Western Waterproofing Co. of America has furnished the
required documents certifying that all bills for labor and
materials have been paid in full in connection with the
aforesaid contract; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and
nti
final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
zY
Section 1. Tne completed work performed by Western
Waterproofing Co. of America for FIRE RESCUE TRAINING
CENTER - TRAINING POOL REPAIR, for a total cost of
%
$19,320.00, is hereby approved.
�t
Section 2. The proper officials of the City of Miami
RS
are hereby authorized to pay $1,932.00 to Western
Waterproofing Co. of America as full and final payment for
F
.S+
«`
rr
all work performed and all materials furnished in connection
i
with FIRE RESCUE TRAINING CENTER - TRAINING POOL REPAIR.
4 I CITY COMMI ISS ON
MEETING OF
DECp19 1985
[RESOLUTION (Vof
ARI{S.
t
I
CITY OF MIAMI, FLORIDA
INTItR-OFFICE MEMORANDUM
110
14
TO. Honorable Mayor and DATE. DEC 12 1985 FILE: B-2773-
E M embers of the City
Commission SUBJECT.FIRE RESCUE TRAINING CENTER -
TRAINING. POOL REPAIR
Resolution for Final
FROM: REFERENCES: Payment
Cesar H. Odio
City Manager ENCLOSURES: (For Commission Meeting
of December 19j 1985)
rr
It is recommended that a resolution be
adopted accepting the completed work
and authorizing a final payment of
$1,932.00 to Western Waterproofing Co.
of America for FIRE RESCUE TRAINING
CENTER - TRAINING POOL REPAIR - B-
2773-A.
Western Waterproofing Co. of America has completed
the project consisting of drilling holes in the
existing concrete cove, located where the vertical
walls meet the pool floor, and applying pressure
grout to seal the joint between the vertical wall and
the floor slab. In addition, the entire pool
surface, walls and floor, were cleaned and a
waterproofing membrane was applied. The original
amount was $19,685.00 and the completed amount is
$199320.00. It was completed on time. The source of
funds is The Fire College Training and Closed Circuit
Television Account.
It is now in order for the City Commission to accept
the completed work and authorize final payment, after
all conditions are met.