HomeMy WebLinkAboutR-85-1197J-85-1178
t-
RESOLUTION NO. 8"'-1197
A RESOLUTION ACCEPTING THE COMPLETED
OF DOUGLAS N. HIGGINS, INC. AT A TOTAL
COST OF t4�I9?(iC.7)4 FOR WEST FLAGLER
STREET STORM SEWER MODIFICATIONS - B-
5504; AND AUTHORIZING A FINAL PAYMENT OF
$70,797 •03•
WHEREAS, there exists a contract dated September 139
1985 between the City of Miami and Douglas N. Higgins, Inc•,
and
WHEREAS, the work, has been satisfactorily completed,
and Douglas N. Higgins, Inc. has furnished the required
documents certifying that all bills for labor and materials
have been paid in full in connection with the aforesaid
contract; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and
final payment made to the contractor;
'i
E(
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by Douglas N.
Higgins, Inc. for WEST FLAGLER STREET STORM SEWER
MODIFICATIONS, at a total cost of $431,302.74, is hereby
approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $70,797.03 to Douglas N.
Higgins, Inc. as full and final payment for all work
performed and all materials furnished in connection with
WEST FLAGLER STREET STORM SEWER MODIFICATIONS.
C117 COI'uMSION
MEETING OF
D E C Q19 1985
RESOLUTION No. y+�
REMARKS.
Y
1
agy Of flor�Pmhpr i
PASSED AND ADOPTED this 1�__
1985 •
XAVIER L. SUAREZ► MAYOR
ATTEST!
AYHIF�—�CI CLERK
PREPARED AND APPROVED BY:
�l �
0 ERT F. AR CHIEF
DEPUTY CITY ATTORNEY
APPROVED AS^TO FORM AND CORRECTNESS:
LUCIA A�DG�
CITY ATTORNEY
- 2 -
85y-1197
I
I
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
12
TO. Honorable Mayor and DATE: DEC 12 1985 RILE: B-5504
Members of the City
Commission SUBJECT WEST FLAGLER STREET STORM
SEWER MODIFICATIONS
Resolution for Final
FROM Cesar H. Odio REFERENCES payment
City Manager ENCLOSURES. (For Commission Meeting
of December 19, 1985)
It is recommended that a resolution be
adopted accepting the completed work
and authorizing a final payment of
$70,797.03 to Douglas N. Higgins for
WEST FLAGLER STREET STORM SEWER
MODIFICATIONS - B-5504.
Douglas N. Higgins, Inc. has completed the project
consisting of constructing storm sewer pipes and
manholes in West Flagler Street between West 43 - 72
Avenues, in conjunction with Dade County's rebuilding
of Flagler Street. Included is 3300 feet of 2011 -
6011 storm sewer pipe, 815 feet of 24" x 35" - 38" x
57" aluminum arch pipe, and 19 manholes. These pipes
were installed for future connections north and south
of West Flagler Street. The original amount was
$444,620.00 and the completed amount is $431,302.74.
It was completed on time. The source of funds is
Flagler Storm Sewer Modifications.
It is now in order for the City Commission to accept
the completed work and authorize final payment, after
all conditions are met.
DWC:LEL:mw
-> Resolution attached
cc: Aberto Ruder
85W-1197