Loading...
HomeMy WebLinkAboutR-86-0006TF L9 ..y 86-24 RESOLUTION NO. 196"6 A RESOLUTION ACCEPTING THE COMPLETED WORK OF 14URTON ROOFING CORP. AT A TOTAL COST OF $20,833.50 FOR COCONUT GROVE EXHIBITION CENTER - MEZZANINE ROOF REPLACEMENT; AND AUTHORIZING A FINAL PAYMENT OF $3,307.35 WHEREAS, there exists a contract dated April 4, 1985 between the City of Miami and Murton Roofing Corporation; and WHEREAS, the work has been satisfactorily completed, and Murton Roofing Corporation has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Murton Roofing Corporation, for COCONUT GROVE EXHIBITION CENTER - MEZZANINE ROOF REPLACEMENT, at a total cost of $20,833.50, is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $3,307.35 to Murton Roofing Corporation as full and final payment for all work performed and all materials furnished in connection with COCONUT GROVE EXHIBITION CENTER MEZZANINE ROOF REPLACEMENT. C177f CODBUSSION MEETING OF JAN1988 AM -- A 6$. lJ PASSED AND ADOPTED this 9th day of JANUARY , 1980- ATTEST: A,TYH I RA-Il .4 �-I T Y G L L R K PREPARED AND APPROVED BY: ROBERT F. -LLA CHIEF DEPUTY CITY ATTORNEY APPROVES TU FORM AND CORRECTNESS: L V V I n n• v v v v CITY ATTORNEY - 2 - . L. SIT M A Y0 R A a i CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM Honorable Mayor and DATE! JAN ` x 1986 KYLE. B-2887 TO. Members of the City Commission COCONUT GROVE EXHIBITION SUBJECT CENTER MEZZANINE - ROOF A REPLACEMENT Resolution for Final 1 Payment FROM: REFERENCES: Cesar H. Odio City Manager ENCLOSURES: (For Commission Meeting of January 9, 1986) It is recommended that a resolution be adopted accepting the completed work and authorizing a final payment of $3,307.35 to Murton Roofing Corporation for COCONUT GROVE EXHIBITION CENTER MEZZANINE ROOF REPLACEMENT. Murton Roofing Corporation has completed the project that consisted of removing and reroofing approximately 7000 square feet of flat roof over the mezzanine, including: insulation, four -ply roofing, drip strips, cant, flashing, and drains. The work is located on the easterly side of the exhibition center at 3360 Pan American Drive at Dinner Key. The original contract amount was for $22,850.00, and the completed amount is $20,833.50. The source of funds is "Coconut Grove Exhibition Center - Additional Work" account. acce the It is now iorkorder and for authorize zethe e t fi nal Commis payment sion � aftert al 1 completed w conditions are met. tEL:az ution attached cc: Alberto Ruder 4 4 FINAL CONSTRUCTION FACT SHEET JOB NAME Coconut Grove Exhibition Center Mezzanine - Roof Replacement - B-2887 CONTRACTOR Murton Roofing Corp. (Not) -Minority) JOB SCOPE Remove and reroof 7000 sq. ft. of the flat roof over the mezzanine including insulation, four ply roofing, drip strips, cant, flashing and drains, located at 3360 Pan American Drive, Dinner Key. REASON Leaking roof. FOR WORK SOURCE Coconut Grove Exhibition Center - Additional Work OF FUNDS PROJECT Bids Received: 1/22/85 HISTORY Contract Awarded: 2/14/85 Preconstruction Meeting: 4/11/85 CONTRACT TIME STARTED 4/30/85 CONTRACT TIME 15 Working days SCHEDULED COMPLETION DATE 5/20/85 ACTUAL COMPLETION DATE 5/3/85 BID AMOUNT $22,850.00 CONTRACT FINAL COST $20,833.50 CURRENT ITEM FOR Resolution to accept completed work, and authorize CONSIDERATION final payment to the contractor.