Loading...
HomeMy WebLinkAboutR-86-0720J-86-746 RESOLUTION NO. 86 20 A RESOLUTION ACCEPTING THE COMPLETED WORK OF IR"�` N-GREENWELL, INC. AT A TOTAL COST OF $190,783.54 FOR EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I - (BID "A") IN EAST LITTLE HAVANA HIGHWAY IMPROVEMENT DISTRICT H-4487; AND AUTHORIZING A FINAL PAYMENT OF $19,584.74. WHEREAS, there exists a contract dated October 16, 1984 between the City of Miami, Florida and Irwin-Greenwell, Inc. for EAST LITTLE HAVANA HIGHWAY IMPROVEMENT PHASE I (BID "A"); and WHEREAS, the work has been satisfactorily completed and Irwin-Greenwell, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, after a duly advertised public hearing held on. September 11, 19869 to hear objections by persons interested in or affected by City Commission acceptance of the completed construction of EAST LITTLE HAVANA HIGHWAY IMPROVEMENT PHASE I (BID "A") in EAST LITTLE HIGHWAY IMPROVEMENT DISTRICT H-4487, no objections were sustained; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Irwin Greenwell, Inc. for EAST LITTLE HAVANA HIGHWAY IMPROVEMENT PHASE I (BID "A") in EAST LITTLE HAVANA HIGHWAY IMPROVEMENT DISTRICT H-4487 is hereby accepted at a total cost of $190,783.54. Section 2. The proper officials of the City of Miami are hereby authorized to pay Irwina-Greenwell, Inc. a balance of f d a nd $19,584.74 as full and final payment for all work per orme all materials furnished in connection with EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I (BID "A") in EAST LITTLE HAVANA HIGHWAY IMPROVEMENT DISTRICT H-4487. PASSED AND ADOPTED this filth day of SEPPE.MBER 1986. �'itiGw • � MAYOR V CITY CIF' MIAIMI. r ORIR7 A INTER-OFFICL A9MF«� A1" E3tUI+A TO. Honorable Mayor and Members of the City Commission FROM: Cesar H. Odio Wo DATE: SP 3 1996 FILE: B-4487A SUBJECT: EAST LITTLE HAVANA HIGHWAY IMP. PH I - (BID "A") Resolution for Final REFERENCES: Payment City Manager ENCLOSURES: (For Commission Meeting of September 11, 1986) It is recommended that a resolution be adopted accepting the completed work performed by Irwin-Greenwell, Inc. at a total cost of $190,783.54 for EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I - (BID "A") and authorizing a final payment of $19,584.74. -Irwin-Greenwell, Inc. has completed the project consisting of constructing 0.3 mile of street, including clearing and grading, construction of asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm sewers, and landscaping. The work is located on S.W. 2nd Street between 7th and 9th Avenues and on S.W. 7th Avenue between 1st and 2nd Streets. The original contract amount was $194,823.75, and the completed cost is $190,783.54. The source of funds is "East Little Havana Street Improvements" account. At the Commission meeting of July 31, 1984 Resolution No. 84- 908 passed, directing the City Clerk to publish a Notice of . Public Hearing on EAST LITTLE HAVANA HIGHWAY IMPROVEMENT PHASE I (BID "A") at the completion of the project. It is now in order for the City Commission to accept the completed work and authorize final payment, after all conditions are met. JOB NAME CONTRACTOR FINAL CONSTRUCTION FACT SHEET East Little Havana Highway Improvement - Phase I (Bid "A") - B-4487 Irwin Greenwell, Inc. JOB SCOPE Construct 0.30 mile of street including clearing and grading, asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm drainage and landscaping on S.W. 2 Street between S.W. 7-9 Avenues and S.W. 7 Avenue between S.W. 1-3 Streets. REASON FOR WORK SOURCE OF. FUNDS PROJECT HI CONTRACT TIME STARTED Eliminate deteriorated side parkways from heavy on - street parking and drainage problems. East Little Havana Street Improvements Bids Received: 6/14/84 Contract Awarded: 7/31/84 Preconstruction Meeting: 10/10/84 1/25/85 CONTRACT TIME 50 Working days plus 2 days delay from rain 37 days delay from utility relocation work SCHEDULED COMPLETION 1 DATE 6/ 3/ 85 r ACTUAL r COMPLETION ' P h DATE 6/3/85 r4Y BID AMOUNT $194,823.75 f CONTRACT li FINAL COST $190t783.54 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor. 86-72 , k' CITY OF MIAMI. r-.oniQA - INTER -OFFICE fR1RM[2RAM1OUM 7O Matey Hirai OATIE: August 22, 1986 FILE. 8-4487A City Clerk 9UbJEc.T EAST LITTLE HAVANA HIGNWAY IMPROVEMENT - PHASE I (BID "A") Request to Publish Notice REFERENCES is FROM ri",`I: JJ� . > -. .. .. for Public Hearing Donald W. Cather _ ENCLOSURES Director of Public Works Please make arrangements to publish a Notice of Public by the City Hearing for objections to Commision of the the acceptance constructionof EAST LITTLE IMPROVEMENTted - HAVANA HIGHWAYfor HAYA "A") H 4487 PHASE the Commission Meeting of September 11. 1986. Resolution No. 84-908 passed at the Commission Meeting of July 31, 1984 authorizing the City Clerk to advertise for public hearing. LE mh c. Alberto Ruder I . s: yr� T° Matty Hirai City Clerk DATE, August 22, 1986 FILE. B-4487A SUBJECT EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I REFERENCES, Request to Publish Notice FROM Af`'%�'� k "'���� for Public Hearing Donald W. Cather EVCLOSURES Director of Public Works Please make arrangements to publish a Notice of Public Hearing for objections to the acceptance by the City Commission of the completed construction of EAST LITTLE HAVANA HIGHWAY IMPROVEMENT - PHASE I (BID "A") - H-4487 for the Commission Meeting of September 11, 1986. Resolution No. 84-908 passed at the Commission Meeting of July 31, 1984 authorizing the City Clerk to advertise for public hearing. LE A mh