Loading...
HomeMy WebLinkAboutR-86-0669J'-86-752 RESOLUTION NO. A RESOLUTION ACCEPTING THE COMPLETED WORK OF MIRI CONSTRUCTION, INC. AT A TOTAL COST OF $107,877.12 FOR SILVER BLUFF STORM SEWER PROJECT - BID "C"; AND AUTHORIZING A FINAL PAYMENT OF $100380.46. WHEREAS, there exists a contract dated October 1, 1985 between the City of Miami and Miri Construction, Inc.; and WHEREAS, the work has been satisfactorily completed by Miri Construction, Inc. and they have furnished the required k documents certifying that all bills for labor and materials. '^s have been paid in full in connection with the aforesaid contract; and U WHEREAS, the City Manager and the Department of Public h Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE. CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Miri Construction, Inc. for SILVER BLUFF STORM SEWER PROJECT - BID } "C" at a total cost of $107,877.12 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $10,380.46 to Miri Construction, Inc. as full and final payment for all work performed and all materials furnished in connection with SILVER BLUFF STORM SEWER PROJECT - BID "C". CUT 3145C MG IN SEP PASSED AND ADOPTED this 11 day of SEPTEMmR 1986. CITY OF MIdAMI, FW1110fA INTIER-OFFICE MEMOnPeNOUM TO; Honorable Mayor and Members °"TR: SEP 3 1986 B-5512C of the City Commission FROM: Cesar N. Odio WM SUBJECT: SILVER BLUFF STORM SEWER REFERENCES: PROJECT (BID "C") Resolution for Final Payment City Manager ENCLOSURES: (For Commission Meeting of September 11, 1986) It is recommended that a resolution be adopted accepting the completed work and authorizing a final payment of $10,380.46 to Miri Construction, Inc. for SILVER BLUFF STORM SEWER PROJECT - BID "C" Miri Construction, Inc. has completed the Silver Bluff Storm Sewer Project - Bid "C". The work consisted of constructing 370 feet of three-foot wide covered ditch, 820 feet of french drain, and six manholes, together with all necessary appurtenances in an area bounded by S.W. 23rd Terrace and 26th Street between S.W. 22nd and 27th Avenues. The work was completed on time. It is now in. order for the City Commission to accept the completed work and authorize final payment, after all conditions are met.; DWC: mh F Res ution attached x cc: Alberto Ruder FINAL CONSTRUCTION F4CT SNI[T .�.....� �.—� .,,,......q.. ..ems OB NANB Silver Bluff Storm Sever Project (Did "C") • 0-SS12 CONTRACTOR Miri Construction, Inc. JOB SCOPE Construct 3709 of 3" wide covered ditch 8201 of French drain and 6 manholes together with all necessary appurtenances in area bounded by S.N. 23 Terrace to S.Y. 25 Street between S.N. 22-27 Avenues. REASON Eliminate drainage problems. FOR WORK SOURCE Silver Bluff Storm Sewers OF.. F Fes= PROJECT Bids Received: 7/16/85 HIS Contract Awarded: T/18/85 Preconstruction Meeting: 4/MV85 CONTRACT TIME STARTED 3/3/86 CONTRACT TIME 50 Working days plus i days delay from rain. SCHEDULED COMPLETION DATE 5/ 15/86 ACTUAL COMPLETION DATE 5/9/86 BID AMOUNT $112,531.75 CONTRACT FINAL COST $107,877.12 CURRENT ITEM FOR Resolution to accept completed rant and authwile CONSIDERATION final payment to the contractor. �' S J> ,: f�� . 7}3 .!E "� i s 4 �r .s. • ' e�.. .'.A �4 ... i �`. �..