Loading...
HomeMy WebLinkAboutR-86-08997 J-86-932 10/28/86 RESOLUTION NO. 86-899 A RESOLUTION ACCEPTING THE COMPLETED WORK OF FRANK J. MORAN AT A TOTAL COST OF $274,029.80 FOR CURTI` PAFK `�FOPTSFIELD LIGHTING; AU7HORIZING At; I1dCRF.ASE IN NOVEMBER 12, 1985 CONTRACT WITH FRANK J. MORAN FOR SAID WOFf; JN THE NET AMOUNT OF $4,939.80 AND AUTHORIZING A FINAL, PAYMENT OF $6,941.15 WHEREAS, there exists a contract dated November 120 1985 between the City of Miami., Florida and Frank J. Moran for CURTIS PARK SPORTSFIELD LIGHTING; and WHEREAS, the work has been satisfactorily completed, and Frank J. Moran has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, unforeseen conditions encountered during construction caused an increase in construction cost that will require a final increase in the contract amount of $4,939.80; and WHEREAS, sufficient funds for the increased cost are available from funds already allocated to the project; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend the increase of $4,939.80 to cover the increase in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The amount of the November 12, 1985 contract with Frank J. Moran for CURTIS PARK SPORTSFIELD LIGHTING is hereby increased in the net amount of $4,939.80 with monies therefor to be provided from funds already allocated to the project. Section 2. The completed work performed by Frank J. Moran for CURTIS PARK SPORTSFIELD LIGHTING is hereby accepted at a total cost of $274,029.80. CM COO ISS10N MEETING OF NOV 13 190 86-899 Esau lON No. _ ... Section 3. The proper officials of the City of Miami are hereby authorized to pay Frank J. Moran a balance of $6,941.15 as full and final payment for all work performed and all. materials furnished in connection with the aforesaid contract. PASSED AND ADOPTED this13 day of November 1986. ATTES ATTY HIRAI CITY CLERK PREPARED AND APPROVED BY: 'o,"'4a X, 4ve BOB T -F. CLARK CHIEF DEPUTY CITY ATTORNEY APPR E AS TO FORM AND CORRECTNESS: ./i LVvllf ^• uvv. CITY ATTORNEY W 40 CITY or INTER.orricF mFmo"A N[3lJm 33 - TO. Honorable Mayor and DRUM Nov 51986 nLE: B-2.S-g ^ Members of the City Commission SUBJECT: CURTIS PARK SPORTSFIELD LIGHTING - Resolution for Increase in Contract and PROM REFERENCE!: Final Acceptance Cosar H. Odlo City Manager ENCLOSURES: RECOMMEXPATION It is retspactfully recommended that the City Commission adopt the attached resolution accepting the completed work performed by Frank J. Moran at a total cost of $274,029.80 for CURTIS PARK SPORTSFIELD LIGHTING; authorizing an increase in the contract in the amount of $4,939.80 and authorizing a final payment of $6,941.15. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met for the Curtis Park Sportsfield Lighting project. Frank J. Moran has completed the project consisting of replacing the tennis court and baseball field lighting with new concrete poles and new light fixtures, installation of three security lights, reworking the existing electric vault including installation of a motor control center, change -out of the existing 2400 volt service by Florida Power and Light, and installing a new 480 volt service, which then required a refeeding and change -out of transformers to religh1V the softball and football field lights, and the installation of a computer control center located in the community building which will allow turning any of the lighting systems on from a central control center. The park is located at 1901 N.W. 24 Avenue. The total payment to the contractor will be greater than the original contract amount by $14,329.00 because of the extra cost caused by unforeseen conditions encountered during construction. An increase in contract of $9,990 was authorized by Resolution 86-547 dated 7/10/86. Funds to cover the additional overrun of $4,939.80 are available from monies already allocated to the project. This was a lump sum contract in the amount of $259,100.00, but because of the $14,329.00 in increases, the final construction cost for the project is $274,029.80. Attachments: Proposed Resolution s • s • FINAL CONSTRUCTION FACT SHEET JOB NAME Curtis Park Sportsfield Lighting - B-2858 CONTRACTOR Frank J. Moran JOB SCOPE Replace tennis court and baseball field lighting with new concrete poles and fixtures, install three (3) security lights, modify electric vault including installation of motor- control center, rewire softball and football field lights, and install computer controller for all lighting systems in park. REASON Improve lighting. FOR R WORK SOURCE Curtis Park Improvements OF FUNDS PROJECT Bids Received: 9/24/85 HISTORY Contract Awarded: 10/10/85 Preconstruction Meeting: 2/4/86 CONTRACT TIME STARTED 2/14/86 CONTRACT TIME 60 Working days plus 89 days due to unforeseen underground conditions, extra work, and delivery of materials for extra work. SCHEDULED COMPLFTION DATE 9/15/86 ACTUAL COMPLETION DATE 9/ 15/86 BID AMOUNT $2690090.00 (Includes $9,990.00 increase in contract authorized by Comm. Reso 86-547 dated 7/ 10/86 ) j CONTRACT !! FINAL COST $274,029.80 1 CURRENT ! ITEM FOR Resolution to accept completed work, increase contract CONSIDERATION $4,939.80, and authorize final payment to the contractor. { M _1 .