ADVERTISEMENT FOR BIDS
Sealed bids for construction of ALLAPATTAH HIGHWAY IMPROVEMENT PHASE II B-
4507 will be received by the City Manager and the City Commission of the City
of Miami, Florida at 11.00 a.m. on the 8th day of January, 1987, in the City
Commission Chambers, first floor of the Miami City Hall, 3500 Pan American
Drive, Dinner Key, Miami, Florida, 33133, at which time they will be publicly
opened and read.
The work will include the construction of approximately 3.0 miles of streets
in the area bor r �1 by N.W. 23rd to 28th Streets, from N.W. 18th to 27th
Avenues. Cons t uct' n will include the following: clearing and grading,
construction of phaltic pavement, concrete curbs and/or gutters, concrete
sidewalk, storm sewer facilities and landscaping. The engineer's estimate
for the project is between 51.8 million and $2.3 million. City regulations
will allow bidders to furnish a performance bond and a bid bond in accordance
with Resolutions No. 84-423 and No. 84-873.
For technical questions regarding the plans and specifications please contact
William A. Mackey, P.E., Highway Design Engineer, at (305)579-6865.
All bids shall be submitted in accordance with the Instructions to Bidders and
Specifications. Plans and specifications may be obtained from the office of
the Director, Department of Public Works, 275 N.W. 2 Street (4th Floor),
Miami, Florida, on or after December 11, 1986. There will be a $20 deposit
required for each set. Deposits will be refunded only upon return of plans
and specifications to the Department of Public Works, unmarked and in good
condition within two (2) weeks after opening of the bids.
Prospective bidders are alerted to the .provisions of Ordinance No. 10062
regarding allocation of contracts to minority vendors. The City will expect
prospective bidders to submit an Affirmative Action Plan, as defined in said
Ordinance, and as required in the Instructions to Bidders.
The City of Miami has adopted Ordinance No. 10032, which implements the "First
Source Hiring Agreement." The object of this ordinance is to provide
employment opportunities to City of Miami residents on contracts resulting in
the creation of new permanent jobs. Contractors may be eligible for wage
reimbursement under this program. For f-irther information. contact the
Department of Public Works, City of Miami, at '305)579-6856.
Proposal includes the time of performance, and specifications contain
provisions for liquidated damages for failure to complete the work on time.
The City Commission reserves the right to waive any informality in any bid,
and the City Manager may reject any or all bids, a&I readvertise (8-4507, Req.
3659).
Matty Hirai
City Clerk
go r/ 0/J
67-44
LICITACION N0. 86-87-031�, ;c
AVISO DE LICITACION
Propuestas selladas parer ALLAPATTAH K, GHWAY IMPROVEN�r�1'I' PHASE II B-4507 seran
oON recibidas por el Administrador y la Ccmisio'n de la Ciudad de Miami, Florida, a
mas tardar a las 11,00 a.m. el dia 8 de enero de 1987, en la Camara de la
Comision, pruner piso, Ayuntamiento de Miami, 3500 Pan American Drive, Dinner
Key, Miami, Florida, 33133, a cuya hora y el cuyo lugar seran publicanente
abiertas y leidas.
E1 trabajo incluira la reconstrucci6n de aproximadamente 3.0 millas de calles
en el "area situada entre las calles 23 a 28 del N.W. y las avenidas 18 a 27
del N.W. La, construcci6n incluira to siguiente: limpieza y nivelaci6n,
pavimento asfaltico, cunetas y contenes de concreto, aceras de concreto,
facilidades para drenaje y jardine ria ornamental. El estimado de ingenieria
parer este proyecto ester entre $1.8 millones y $2.3 millones. Requisitos
municipales pennitiran a los licitadores presentar bonos de cumplimiento y
licitacion de acuerdo a las resoluciones No. 84-423 y 84-873.
Para preguntas tecnicas acerca de los pianos y especificaciones Mane a
William A. Mackey, Ingeniero de Diseno de Carreteras, al (305)579-6865.
Todas las licitaciones seran sometidas de acuerdo con las Instrucciones a los
Licitadores y las Especificaciones. Los juegos de planos y especificaciones
podran obtenerse en la oficina. del Director de Ob ras Publicas, 275 N.W. 2
Street (4to Piso), Miami, Florida, a partir del 11 de diciembre de 1986. Se
requerira un deposito de $20 por calla juego. Estos dep'O
sitos son
reembolsables unicamente si los planos y las especificaciones se devuelven
sin marcas y en buen estado, dentro de un plazo de dos (2) semanas siguientes
a la apertura de las licitaciones._
Se avisa a los interesados'de las provisions de la Ordenanza No. 10062,
referente a la otorgacio'n de contratos a minorias. La Ciudad requerira a los
interesados que sometan un Plan de Acci6n Afirmativa, definido en dicha
Ordenanza, y requerido en las Instrucciones a los Licitadores.
La Ciudad de Miami ha adoptado la Ordenanza No. 10032, la cual imple►menta el
"First Source Hiring Agreement". Ester ordenanza tiene por objeto proveer
oportunidades Para empleo a residentes.de la Ciudad de Miani en contratos que
resulten en la creacic'n de nuevas plazas de trabajo. Los contratistas podran
ser elegibles parer reembolsos de gastos de salarios bajo este program. Para
mayor informaci6n dirrijase al Depto. de Obras Publicas, al (305)579-6856.
Las propuestas incluyen el tiempo de ejecuc i6n, y las especificaciones
contienen provisos parer danos liquidados incurridos por falter de completar el
proyecto a tiempo. La Comisi6n de la Ciudad se reserva el derecho a descartar
cualquier informl.idad en cualquier licitacion, y el Admintstrador de la
Ciudad puede rechazar cualquiera o todas las propuestas, y reanuncia.r (B-4507,
Req. 3659)•
Matty Hirai
Secretaria Municipal
M- 87-44
IMPORTANT ADDENDUM
CITY OF MIAMI, FLORIDA
Department of Public Works
ADDENDUM NO. 1
ISSUED
December 10, 1986
to
BIDDING AND CONTRACT DOCUMENTS FOR
ALLAPATTAH
HIGHWAY IMPROVEMENT - PHASE II
B-4507
* * * *
* * *
* * * * * * * * * * * * * * * * * * * * *
* * * * *
THE CONTRACTOR
IS HEREBY NOTIFIED AS FOLLOWS:
CHANGE 1
OF 2:
Sealed
bids
for construction of Allapattah
Highway
Improvement
- Phase II B-4507 will be received by
the City
Manager
and the
City Commission, in the City Commission
Chambers
at Miami
City
Hail, at 11:25 a.m., instead of at 11:00
a.m., on
the 8th
day' of
January, 1987.
THIS ADDENDUM IS AN ESSENTIAL PART OF THE BIDDING AND CONTRACT
DOCUMENTS AND SHALL BE MADE A PART THEREOF.
Donald W. Cather
Director
87-44