HomeMy WebLinkAboutR-87-0003U
J-87-11
12/18/86
RESOLUTION NO.
A RESOLUTION ORDERING DOWNTOWN
HIGHWAY IMPROVEMENT -PHASE II H-4521
AND DESIGNATING THE PROPERTY
AGAINST WHICH SPECIAL ASSESSMENTS
SHALL BE MADE FOR A PORTION OF THE
COST THEREOF AS DOWNTOWN HIGHWAY
IMPROVEMENT DISTRICT -PHASE II H-
4521 .
WHEREAS, the overall condition of certa
way in the downtown area has deteriorated; and
WHEREAS, the deteriorated street ave
gutters and pavement that are in r an
condition; and
WHEREAS, the proposed improv is
asphaltic pavement, concret
sidewalk, storm drainae fac ies and
feasible; and
curbs,
ut of grade
gutters, c
landscaping
WHEREAS, DO OWN HIGH Y 1�°ROVEMENT - PHASE Ii H-4521 is
included in the C1 of Miam' Capital Improvement Program.
NOtAMI_djjjW&A:
FOR RESOLVED BY THE COMMISSION OF THE
CITY OF
ect'9"r 1. local improvement described as DOWNTOWN
V
PR -PHASE II H-4521, shall be made under Section
C ter of the City of Miami, as amended, located in
rdered by North 1 Street, South 1 Street, West 2
Avenue d Biscayne Boulevard.
_Section 2. This improvement shall include clearing and
grading, construction of asphaltic pavement, concrete curbs
and/or gutters, concrete sidewalk, storm drainage facilities and
landscaping where feasible.
-_
R d db R880129
escin e Uy - -
CITY CQMMISSION j
MEETING OF
JAN $ 198i
RESOLUTION No. 9 7 - 3
Section 3. This improvement shall be designated in all
proceedings and assessments as DOWNTOWN HIGHWAY IMPROVEMENT -PHASE
II H-4521 and the property against which special assessments
shall be made for a portion of the cost thereof, hereunder shall
be designated as DOWNTOWN HIGHWAY IMPROVEMENT DISTRICT -PHASE II
H-4521 with the following property descriptions by lot and block
number constituting all of the pieces of property affec<L"
said improvements:
PLAT BOOK
SUBDIVISION AND PAGE Rr,nrx �
SMITH
PROUTS
E.G. SEWELL'S RESUB. OF
LOTS 8,9,16 & 17 BLOCK 106N
FLORIDA EAST COAST RAILWAY
COMPANY RE -SUB
A. L. KNOWLTON'S MAP
OF MIAMI
of /
of
if
isc%
n
„
u
„
„
„
LE BLOND AND ORR
om
- 2 -
104N
105N
106N
115N
115A
116N
117N
118N
119N
121N
122N
123N
124N
125N
126N
1
9,10,11,12
15
11-17
11-20
11-20
18-24
1-8
3
1-10
1-10
3-10
1
11-20
11-20
13-24
1-12
1-10
1-10
1,4-8
Rescindedhy R-88-0_ 29 _
97-3
SUBDIVISION
MOSELEY
it
I-95 EXPRESSWAY
PLAT OF BLOCK 127N AND
PORTION OF BLOCK 120N
CHARTER ONE
PASSED AND ADOPTED this
1987.
AT
TTY HIR I
CITY CLERK
foll
PLAT BOOK
AND PAGE BLOCK
91-2 1
it -
83-21 -
25-75
- 3 -
LOT
1
Tract A
87-3
Rescinded by R-88-0129 -- -
's
4
CITY OF MIAMI, FLORIDA
INTER -OFFICE
MEMORANDUM
TO. Honorable Mayor
and
DATE DEC 3 11986 FILE;
B-4521
--� Members of the
City
Commission
SUBJECT Resolution Ordering a
Highway Improvement
Downtown Highway Improvement
-
t
Phase II H-4521
FROM!
�1
REFERENCES
Cesar H. Odio
n�
It!II jI
City Manager
1� !
ENCLOSURES.
RECOMMENDATION:
It is respectfully recommended
attached resolution ordering
II H-4521, in Downtown Highwa
4521•
BACKGROUND:
y
that the City Commission adopt the
Downtown Highway Improvement -Phase
Improvement District -Phase II H-
The Department of Public Works, after studying the area and
considering the wishes of its residents, and in a continuing
effort to serve all residents of the City of Miami, is proposing
an assessable improvement under Section 56 of the Charter of the
City of Miami described as Downtown Highway Improvement -Phase II
H-4521. This district is located in the area bordered by North 1
Street, South 1 Street, Biscayne Boulevard and West 2 Avenue.
The condition of certain street rights of way in the Downtown
area has deteriorated. The sidewalks, curbs, gutters, and
pavement are in poor and/or out of grade condition. These
problems will be corrected on the streets included in Downtown
Highway Improvement -Phase II. The proposed construction will
include asphaltic pavement, concrete sidewalk, concrete curbs
and/or gutters, storm drainage facilities and landscaping where
feasible.
Downtown Highway Improvement -Phase
Miami's 1986-92 Capital Improvement
this improvement will be funded
General Obligation Bond Funds. The
project is $2,000,000.
Attachments: Proposed Resolution
Project Map
II is included in the City of
Program. The construction of
by Highway and Storm Sewer
estimated total cost of this
87-3
'
sr. J. roger eovu[vAM
e.,r a sr. M.�cc_ e• I ar \ ry ( c / � t
ow
�-- —� r--" l
a
1 sr
125111 e9115111 am on onw
.1 1� ,, ,�, ,., �s �i...—_. yr.-,_I c� Hann• : �• sr. ?�
I� ; i� is :{ it j ----•� %! i .
wumonau�� u�t�rnnan�wnun�n�� u�unnu�uarn��tuumiimtl'i� U i t�� ,� �, { I }
jj r---� I • JII ; 11
LEGEND
1121115 STREETS TO HE
IMPROVED
DOWNTOWN HIGHWAY IMPROVEMENT —PHASE II
B-4521
97-3