ADVERTISEMENT FOR BIDS
Sealed bids for construction of FIAGAMI SANITARY SEWER IMPROVEMENT SR-5511-
C (centerline sewer) will be received by the City Manager and the City
Commission of the City of Miami, Florida at 11:00 a.m. on the 12th day of
March, 1987, in the City Commission Chambers, first floor of the Miami City
Hall, 3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, at which
time they will be publicly opened and read.
The work will consist of construction of approximately 31,000 linear feet of
8" to 16" vitrified clay, and cast or ductile iron pipe sewer, pipe at a
maximum cut of 16 feet; 18,200 linear feet of 6" and 8" extra heavy cast iron
pipe lateral; 110 manholes from 4 to 16 foot cut; sidewalk and pavement
replacement in construction area. The engineer's total estimated construction
cost for the project is between $2,500,000 and $3,000,000. City regulations
will allow bidders to furnish a performance bond and a bid bond in accordance
with Resolution No. 86-983.
For technical questions regarding the plans and specifications please contact
James J. Kay, P.E., Sewer Design Engineer, at (305)579-6865.
All bids shall be submitted in accordance with the Instructions to Bidders and
Specifications.- Plans and specifications may be obtained from the office of
the Director, Department of Public Works, 275 N.W. 2 Street (4th Floor),
Miami, Florida, on or after February 12, 1987. There will be a $20 deposit
required for each set. Deposits will be refunded only upon return of plans
and specifications to the Department of Public Works, unmarked and in good
condition within two (2) weeks after opening of the bids.
Prospective bidders are alerted to the provisions of Ordinance No. 10062
regarding allocation of contracts to minority vendors. The City will expect
prospective bidders to submit an Affirmative Action Plan, as defined in said
Ordinance, and as required in the Instruction to Bidders.
The City of Miami has adopted Ordinance No. 10032, which implements the "First
Source Hiring Agreement." The object of this ordinance is to provide
employment opportunities to City of Miami residents on contracts resulting in
the creation of new permanent jobs. Contractors may be eligible for wage
reimbursement under this program. For further information contact the
Department of Public Works, City of Miami, at (305)579-6856.
Proposal includes the time of performance, and specifications contain
provisions for liquidated damages for failure to complete the work on time.
The City Commission reserves the right to waive any informality in any bid,
and the City Manager may reject any or all bids, and readvertise (8-5511, Req.
3664).
Matty Hirai
City Clerk
43
y3 _r
FLAGAMI SADIITARY SEVER !NPROVIIMEN.'
LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES
FLAGAMI SANITARY SEWER IMPROVEMENT SR-5511 C (centerline sewer)
ORDERED BY RESOLUTION NO. 86-191 ADOPTED MARCH 18, 1966
ESTIMATED CONSTRUCTION COST OFIMPROVEMENT.......... ...........$2,440,GO0.ju
ESTIMATED INCIDENTAL EXPENSES:
Surveys; Inspection and Supervision
of work; Preparation of Plans;
Specifications and Estimates, etc.. $341,600.00
Printing; Publishing of notices
and proceedings; Preparation of
Bonds; Legal services; Abstracts;
etc., and other necessary and
proper expenses .................... $ 499400.00
TOTAL ESTIMATED INCIDENTAL EXPENSES ................ $ 3919000.00
TOTAL ESTIMATED CONSTRUCTION COST AND INCIDENTAL EXPENSES..... $2t61,000.00
DISTRIBUTION:
Estimated
cost
to
be
paid by City of Miami ...............
$1,679,0ii0.G0
Estimated
cost
of
all
items to be assessed ...............
$1,152.000.00
Estimated
cost
of
575
Average Lats.......................
�p 36o,000.00
Estimated
cost
of
56,000
L. ft. of Frontage ..............
$ 784.000.,�U
Estimated
assessment
per front foot: ........................
$ 14.00
Estimated assessment per average centerline lateral......... i 640.00
'/-3- 2
8 254?,
I
ACT SH - '
JOB `:AYE:
` .,I I .. l • i L
r'LAsAMI SANITARY SGrlER Iv••MNTl?aO —
000173
JOB SCOPE:
- Construction of new 8-inch thru 16-inch
sanitary sewers in an area presently
served by septic tanks. This protect
—
:iill be: Bounded on the East by the
F.E.C. Railroad on the West by the Jest
City Lia4.6 on the South by S.W. 8 Street
and on the North by the Tamiami Canal. —
JOB SCOPE:
- Estimated Construction Cost: $29440,000
Estimated Total Cost: $2,831,000
s
REASON :OR WORK:-
This project consists of the construction
®
of 5.0 miles of sanitary sewers and 3.2
;.files of service laterals in an area of �
approximately 575 prcrerties. This will =_
be an assessable pro,eat.
SIZE OF AREA:
- Approximate Acres: 14 Acres
Approximate Population: 4,200 Persons =
SOURCE ^F FUNDS:
- General Obligation Bonds - Sanitary
Sewers
PRn-JECT HIST^RY:
- This project is funded by the 1980
$45,000,000 Bond Issue.