RESOLUTION NO.
A RESOLUTION APPROVING A TEMPORARY EASEMENT FOR
METROPOLITAN DADE COUNTY TO CONSTRUCT A PORT BOULEVARD
DETOUR ROAD THROUGH A PORTION OF THE FEC TRACT TO BE
CONSTRUCTED IN TIME FOR THE APRIL 8, 1987 OPENING OF
BAYSIDE SPECIALTY CENTER AND TO BE VACATED IN SUFFICIENT
TIME AS TO NOT CONFLICT WITH THE 1988 MIAMI GRAND PRIX.
WHEREAS, the Port of Miami, an agency of Metropolitan Dade County,
- will construct a new Port Boulevard Bridge to better serve the County's
multi —million dollar shipping and tourism industries; and
WHEREAS, in order to build the proposed bridge it is necessary
that a temporary detour road be constructed at Port expense through
undeveloped future park land commonly referred to as the FEC tract; and
WHEREAS, the City of Miami Departments of Public Works, Off —Street
Parking, and Development have conceptually reviewed the proposed detour
road; and
WHEREAS, it is of benefit to the citizens of Miami to expedite the
construction of this detour road so that is does not conflict with the
April 8th, 1987 opening of the Bayside Specialty Center; and
WHEREAS, the detour road will be vacated in sufficient time as to
not conflict with the 1988 Miami Grand Prix;
---�Q CF
MAR 13 1981
.k
OAK&
�w
0;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. Approval of a temporary easement for Metropolitan Dade
County to construct a Port Boulevard detour roadlthrough a portion of
undeveloped future park land, commonly referred to as the "FEC tract", is
hereby granted, said road to be constructed in time for the April 8th, 1987
opening of the Bayside Specialty Center and to be vacated in time for the
1988 Miami Grand Prix to be conducted.
PASSED AND ADOPTED this 1� day of March , 19 87.
XAVIER L. SUAREZ, MAYOR
ATTE
MAff HIRAI, CITY CLERK
PREPARED AND APPROVED BY: APPROV AS TO FORM AND CORRECTNESS:
ROBERT F. CLARK VJCIAIA. DOUGHERTY, CITY ATTORNEY
CHIEF DEPUTY CITY ATTORNEY
l/ The herein approval is conditioned upon the City being
presented with a map (or an exact identical copy thereof)
which has been shown previously to a member of the City
Commission who was seeking satisfactory assurance that
area traffic would not be impeded by construction of the
Port Boulevard Project.
TO: Honorable Mayor and Members of
the City Co fission
FROM: Cesar Odio v
City Manager
City of Miami
DATE: March 3, 1987
SUBJECT: PORT BOULEVARD
During the February 26, 1987 City Commission meeting, City Staff was
instructed to review the Port Boulevard situation to determine if the amount
of land to be acquired by Dade County is equivalent to the land included in
the City of Miami appraisal. The City of Miami Public Works Department has
reviewed this issue and determined that the parcels are equivalent and the
amount to be acquired by the Port is correct.
In addition, the granting of a temporary easement for the construction of a
detour road was also discussed during the February 26, 1987 City Commission
meeting. The purpose of the detour road is to allow Port Boulevard traffic
to utilize a portion of the FEC tract during construction of the Port
Boulevard project. With the construction of the detour road, traffic
leaving/entering the Port would detour to the north and exit/enter the FEC
tract at Northeast Eighth Street and Biscayne Boulevard where a traffic
signal is in place. This alternative would allow the construction of the
intersection at Biscayne Boulevard and Northeast Fifth and Sixth Streets to
be completed approximately two months earlier than scheduled, and would allow
Bayside garage traffic to utilize the old Port Boulevard right-of-way
exclusively (see Attachment 1).
In order to allow the detour to be completed before the Bayside opening
(April 8, 1987), work must begin immediately. Therefore, this item has been
placed on the March 13, 1987 City Commission agenda for retroactive approval.
The proposed alignment has been conceptually reviewed by the City of Miami
Public Works Department, Department of Development, Department of Off -Street
Parking and Miami Motorsporta. The Port of Miami will fund the cost of
construction and has agreed to vacate the detour in sufficient time to allow
set-up of the 1988 Grand Prix race.
Attachment: 1
cc: John Gilchrist
Don Cather
Aurelio Perez-Lugones
12
E
I"'
-L.L 0 M IRA OUR. AMU:F'
T
. . . . . . . . . .
Ah
7
4t
Bayside Garage- I All.
ngress/Egress
t
AA
A
Port Boulevard -
Detour
-T.1
87-281
yam, 1
1�. Ar.
* r
Port Boulevard -
Detour
�i•' .'aAly
f
� 1
§t''.LmWMm[3:mjw
itl
',,,�'� ; fir•' .��'
dig
t•I eI a ��/ . =+L"rfr--�—�-•-• s • ' �r -- , —
d Ba side Garage-
�;,. �• t Ingress/Egress
all 'yW4
n�' •w�1�� it ttr
��.. ti _ �Y-L _ r.� --
two, 41
•
87 -282