HomeMy WebLinkAboutR-87-0241J-87-211 2/23/87 A 4* RESOLUTION NO.87-241 A RESOLUTION ACCEPTING THE COMPLETED WORK OF GARCIA ALLEN CONSTRUCTION CO., INC. AT A TOTAL COST OF $824,982.65 FOR MANOR STORM SEWER PROJECT BIDS "B" & "C" AND AUTHORIZING A FINAL PAYMENT OF $46,918.30. WHEREAS, there exists a contract dated May 3, 1985, between the City of Miami, Florida and Garcia Allen Construction Co., Inc. for MANOR STORM SEWER PROJECT BIDS "B" & "C"; and WHEREAS, the work has been satisfactorily completed, and Garcia Allen Construction Co., Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Garcia Allen Construction Co., Inc. for MANOR STORM SEWER PROJECT - BIDS "B" & "C" is hereby accepted at a total cost of $824,982.65. Section 2. The proper officials of the City of Miami are hereby authorized to pay Garcia Allen Construction Co., Inc. a balance of $46,918.30 as full and final payment for all work performed and all materials furnished in connection with the aforesaid contract. PASSED AND ADOPTED this13 day of March 1987. VIER L. SUAREZ$ PWUR ATTEST: 74C41:Tj jY 7C E E R K PREPARED AND APPROVED BY: 064,6A. CHIEF DEPUTY CITY ATTORNEY APPROVED')AS TO FORM AND CORRECTNESS: uw'v'&n n. uvvu CITY ATTORNEY COX. COMMISSION METTG OF MAR 19 1987 IN No._R7 4 16 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO. Honorable Mayor and DATE. MAR 5 19S7 FILE: B-5503 Members of the City Commission B&C SUBJECT: MANOR STORM SEWER PROJECT BIDS "B" & "C" - Resolution for Final Acceptance FROM: REFERENCES: Cesar H. Odio City Manager ENCLOSURES: RECOMMENDATION: It is respectfully recommended that the City Commission adopt the attached resolution accepting the completed work performed by Garcia Allen Construction Co., Inc. at a total cost of $824,982.65 for MANOR STORM SEWER PROJECT - BIDS "B" & "C"; and authorizing a final payment of $46,918.30. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met for the Manor Storm Sewer Project - Bids "B" & "C". Garcia Allen Construction Co., Inc. has completed the project consisting of constructing 51 French drains and covered ditches including all necessary appurtenances in an area bounded by N.W. 7-19 Avenue between N.W. 40-51 Streets. The total payments to the contractor are less than the original contract amount by $104,892.06. This was a unit price contract in the amount of $929,874.71, the final construction cost for the project is $824,982.65. Attachments: Proposed Resolution 8'7-241 FINAL CONSTRUCTION FACT SHEET JOB NAME Manor Storm Sewer Project (Bids BRC) - B-5503 CONTRACTOR Garcia Allen Construction Co., Inc. JOB SCOPE Construct 51 French drains and covered ditches including all necessary appurtenances in an area bounded by N.W. 7-19 Avenues between N.W. 40-51 Streets. REASON Eliminate drainage problems at locations of greatest FOR WORK need. SOURCE Manor Storm Sewers OF FUNDS PROJECT Bids Received: 1/22/85 HISTORY Contract Awarded: 2/14/85 Preconstruction Meeting: 3/27/85 CONTRACT TIME STARTED 7/30/85 CONTRACT TIME 207 Working days plus 18 days delay from rain and 36 days delay from utility conflicts, design changes due to soil conditions, and extra work. SCHEDULED COMPLETION DATE 8/13/86 = ACTUAL COMPLETION DATE 8/13/86 BID AMOUNT $929,874.71 — CONTRACT FINAL COST $824,982.65 CURRENT ITEM FOR Resolution to accept completed work, and authorize CONSIDERATION final payment to the contractor. 8'7-241