HomeMy WebLinkAboutR-87-0240J-87-212 2/20/87 RESOLUTION NO. 87-240 A RESOLUTION ACCEPTING THE COMPLETED WORK OF MIRI CONSTRUCTION, INC. AT A TOTAL COST OF $58,784.50 FOR CITY WIDE SANITARY SEWER REPLACEMENT - DESIGN PLAZA AND AUTHORIZING A FINAL PAYMENT OF $5,836.150 WHEREAS, there exists a contract dated August 19, 1986 between the City of Miami and Miri Construction, Inc.; and WHEREAS, the work has been satisfactorily completed by Miri Construction, Inc. and they have furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Miri Construction, Inc. for CITY WIDE SANITARY SEWER REPLACEMENT - DESIGN PLAZA at a total cost of $58,784.50 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $5,836.15 to Miri Construction, Inc. as full and final payment for all work performed and all materials furnished in connection with CITY WIDE SANITARY SEWER REPLACEMENT - DESIGN PLAZA, CITY COMMISSION MEETING OF MAR 13 1987 PASSED AND ADOPTED this 13th day of ATTEST: ALta-c"— PREPARED AND APPROVED BY: CHIEF DEPUTY CITY ATTORNEY APPROVE CITY ATTORNEY CORRECTNESS: - 2 - I � % March , 1987. 8'7-24Q is CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO. Honorable Mayor and Members DATE: MAR 5 1907 FILE: B-5524 of the City Co mission SUBJECT CITY WIDE SANITARY SEWER 1 1 REPLACEMENT - DESIGN PLAZA Resolution for Final Payment FROM, REFERENCES: Cesar H. Odio C i ty Manager ENCLOSURES: RECOMMENDATION: It is respectfully recommended that the City Commission adopt the attached resolution accepting the completed work performed by Miri Construction, Inc. at a total cost of $58,784.50 for CITY WIDE SANITARY SEWER REPLACEMENT - DESIGN PLAZA and authorizing a final payment of $5,836.15. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met for City Wide Sanitary Sewer Replacement - Design Plaza. Miri Construction, Inc. has completed the project consisting of 677 feet of 8" mainline sewer, 208 feet of 6" clay laterals and one manhole on M.E. 40 Street between N. Miami Avenue and N.E. 2 Avenue. The total payment to the contractor will be less than the original contract amount of $69,877.50 because not all of the bid item quantities and the $5,000 Cash Allowance for special items were used. Attachments: Proposed Resolution 15-1 87--24C FINAL CONSTRUCTION FACT SHEET JOB NAME Citywide Sanitary Sewer Replacement - Design Plaza - B-5524 CONTRACTOR Miri Construction, Inc. JOB SCOPE Replace 677 feet of 8" clay pipe sewer, 208 feet of 6" clay pipe laterals, and 1 manhole located in N.E. 40 Street between N. Miami Avenue and N.E. 2 Avenue. REASON In conjunction with highway improvement FOR WORK SOURCE Citywide Sanitary Sewer Extension Improvements-FY "86" OF FUNDS PROJECT Bids Received: 5/15/86 HISTORY Contract Awarded: 6/12/86 Preconstruction Meeting: 7/14/86 CONTRACT TIME STARTED 9/23/86 CONTRACT TIME 20 Working Days SCHEDULED COMPLETION DATE 10/21/86 ACTUAL COMPLETION DATE 9/30/86 BID AMOUNT $69,877.50 CONTRACT FINAL COST $58,784.50 CURRENT ITEM FOR Resolution to accept completed work, and authorize CONSIDERATION final payment to the contractor. I S-: I 8'7-24C