HomeMy WebLinkAboutM-87-0438Bid No. 86-87-078
ADVERTISEMENT FOR BIDS
Sealed bids for construction of CITY WIDE HIGHWAY IMPROVEMENT PHASE IV B-4526
wi l l be received by the City Manager and the City Commission of the City of
Miami, Florida at 11 : 00 am on the 14th day of May, 1987, in the Ci ty
Commission Chambers, first floor of the Miami City Hall, 3500 Pan American
Drive, Dinner Key, Miami, Florida, 33133, at which time they will be publicly
opened and read.
The work will include the construciton of approximately 0.8 miles of streets
on N.N. 12 Street Drive (42-45 Avenues), N.W. 45 Avenue (Comfort Canal - N.W.
12 Street Drive), N.N. 27 Court (Flagler Street-N.W. 3 Street) and S.W. 12
Street (1-3 Avenues). Construction will include the following: clearing and
grading, construction of asphaltic pavement, concrete curbs and/or gutters,
concrete sidewalk, storm sewer facilities and landscaping. The engineer's
estimates for the project is between $650,000 and $700,000. City regulations
will allow bidders to furnish a performance bond and a bid bond in accordance
with Resolutions No. 84-423 and No. 84-873.
For technical questions regarding the plans and specifications please contact
-- William A. Mackey, P.E., Highway Design Engineer, at (305)579-6865.
All bids shall be submitted in accordance with the Instructions to Bidders and
Specifications. Plans and specifications may be obtained from the office of
the Director, Department of Public lxlork;s. 275 N.W. 2 Street (4th Floor),
Miami, Florida, on or after Apri116, 1987. There will be a S20 deposit
required for each set. Deposits will be refunded only upon return of plans
and specifications to the Department of Public Worts, unmarked and in good
condition wishing two (2) weeks after, opening of the bids.
Prospective bidders are alerted to the provisions of Ordinance No. 10062
regarding allocation of contracts to minority vendors. The City will expect
prospective bidders to submit an Affirmative Action Plan, as defined in said
Ordinance, and as required in the Instructions to Bidders.
The City of Miami has adopted Ordinance No. 10032, which implements the "First
Source Hiring Agreement." The object of this ordinance is to provide
employment opportunities to City of Miami residents on contracts resulting in
the creation of new permanent jobs. Contractors may be eligible for wage
reimbursement under this program. For further information contact the
Department of Public Works, City of Miami, at (305)579-6856.
Proposal includes the time of performance, and specifications contain
provisions for liquidated damages for failure to complete the work on time.
The City Commission reserves the right to waive any informality in any bid,
and the City Manager may reject any or all bids, and readvertise (B-4526, Req.
3675).
Matty Hirai
City Clerk
A40 P* 0//
87-436
ESTIMATE OF COST
OF
LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES
CITY WIDE HIGHWAY IMPROVEMENT -PHASE IV H-4526
ORDERED BY RESOLUTION NO. 86-678 ADOPTED SEPTEMBER 11, 1986
ESTIMATED CONSTRUCTION COST OF IMPROVEMENT .....................t 600,000*
ESTIMATED INCIDENTAL EXPENSES:
Surveys; Inspection and Supervision
of work; Preparation of Plans;
Specifications and Estimates, etc.. $ 84,000
Printing; Publishing of notices
and proceedings; Preparation of
Bonds; Legal services; Abstracts;
etc., and other necessary and
proper expenses .................... $ 12,000
TOTAL ESTIMATED 114CIDE14TAL EXPENSES ................ $
ESTIMATEDINDIRECT COST ........................................ S
TOTAL ESTIMATED COST OF IMPROVEMENT ........................... S
DISTRIBUTION:
Estimated cost to be paid by City of Miami ............... $
Estimated cost of all items to be assessed ............... S
Estimated assessment per front foot ...................... $
Estimated assessment per L. Ft. of curb and gutter....... S
Estimated assessment per L. Ft. of 6" curb ............... $
Estimated assessment per L. Ft. of valley gutter......... $
Estimated assessment per s.y. of 1-inch asphalt.......... S
Estimated assessment per s'.y. of 8-inch limerock base.... S
Estimated assessment per L. Ft. of concrete sidewalk..... $
* Revised estimate $700,000 as of 4/29/87
I WE
96,000
4,000
700,000
500,000
100,000
10.00
2.00
1.75
1.75
0.76
2.35-
2.50
87-4 i36