Loading...
HomeMy WebLinkAboutR-87-0531J-87-527 6/2/87 RESOLUTION N0. 87-531 A RESOLUTION ACCEPTING THE COMPLETED WORK OF M. VILA A ASSOCIATES, INC. AT A TOTAL COST OF $547,456.31 FOR LOCAL DRAINAGE PROJECT E-55 C.I.P. PROJECT NO. 352180 AND AUTHORIZING A FINAL PAYMENT OF E29,919.56. WHEREAS, there exists a contract dated February 19, 1986 between the City of Miami and M. Vila A Associates, Inc.; and WHEREAS, the work has been satisfactorily completed by M. Vila A Associates, Inc. and they have furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractors NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by M. Vila A Associates, Inc. for LOCAL DRAINAGE PROJECT E-55 C.I.P. Project No. 352180 at a total cost of $547,456.31 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $29,919.56 to M. Vila A Associates, Inc. as full and final payment for all work performed and all materials furnished in connection with LOCAL DRAINAGE PROJECT E-55 C.I.P. Project No. 352180. G, CITY COMMISSION MEETING OF JUN 11 1987 604 3 ;w►RKs: PASSED AND ADOPTED this llth day of Duna , 19874 ATTEST: MATTY HIRAI, CITY CLEW — PREPARED AND APPROVED BY: IL CHIEF DEPUTY CITY ATTORNEY APPROVED/ASS TO FORM AND CORRECTNESS: A A• YV V V CITY ATTORNEY rCITY OF MIAMI. FLORIDA INTI M-OFFICE MEMORANDUM P 13 to: Honorable Mayor and Members OATS: �: V" 1g�7 ME- B-5505 of the City Commission subJECT: LOCAL DRAINAGE PROJECT E-55 C.I.P. Project No. 352180 - Resolution for Final Payment FROM: Cesar H. Odio REFERENCES: Final Payment City Manager ENCLOSURES: RECOMMENDATION: It is respectfully recommended that the City Commission adopt the attached resolution accepting the completed work performed by M. Vila & Associates, Inc. at a total cost of $547,456.31 for LOCAL DRAINAGE PROJECT E-55 C.I.P. Project No. 352180 and authorizing a final payment of $29,919.56. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met for Local Drainage Project E-55 C.I.P. Project No. 352180. M. Vila b Associates, Inc. has completed the project consisting of constructing french drain, covered ditches, storm sewer additions with necessary catch basins, manholes, pipe and grading at 30 locations citywide. The total payment to the contractor will be $92,166.69 less than the original contract amount of $639,622.00 because.not all of the proposal items were used. Attachments: Proposed Resolution /3-1 i FINAL CONSTRUCTION FACT SHEET JOB NAME Local Drainage Project E-55 - 8-5505 CONTRACTOR M. Vila A Associates, Inc. JOB SCOPE Construct French drains, covered ditches and sewer additions with necessary catch basins, pipes, manholes and grading at 30 locations citywide. REASON Eliminate drainage problems at locations of greatest FOR 'CORK need. SOURCE Local Drainage Projects. OF FUNDS PROJECT Bids Received: 11/21/85 HISTORY Contract Awarded: 1/9/86 Preconstruction Meeting: 2/6/86 CONTRACT TIME STARTED 3/4/86 CONTRACT TIME 150 Working Days plus 10 days delay from rain and 32 days delay from design changes and extra work. SCHEDULED COMPLETION DATE 12/5/86 ACTUAL COMPLETION DATE 12/5/86 BID AMOUNT $639,622.00 CONTRACT FINAL COST $547,456.31 CURRENT ITEM FOR Resolution to accept completed work, and authorize final CONSIDERATION payment to the contractor. a