Loading...
HomeMy WebLinkAboutM-87-0602Bid No. 86-87-098 ADVERTISEMENT FOR BIDS Sealed bids for construction of FAIRLAWN SOUTH SANITARY SEWER IMPROVEMENT - SR-5515-C (centerline sewer) will be received by the City Manager and the City Commision of the City of Miami, Florida at 11:00 a.m. on the 29th day of June, 1987, in the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, at which time they will be publicly opened and read. Construction will include: 28,500 + linear feet of 8-inch to 20-inch vitrified clay, and cast or ductile iron pipe sewer with the deepest cut being 16 ± feet; 16,300 + linear feet of 6-inch extra heavy cast iron soil pipe laterlas; 111 + manholes from 4 to 16 feet in depth;. Sidewalk and pavement replacement in construction area. The engineer's estimate for this project is between $1,500,000 to $2,000,000. City requirements permit bidders to furnish performance and bid bonds in accordance with Resolution No. 86-983. For clarification of technical issues as presented in the construction documents and specifications please contact James J. Kay, P. E., Sewer Design Engineer, at (305) 579-6865. All bids shall be submitted in accordance with the Instructions to Bidders and Specifications. Plans and specifications may be obtained from the office of the Director of Public Works, 275 N.W. 2 Street, 4th Floor, Miami, Florida, 33128, on or after May 28, 1987. There will be a $20 deposit required for each set. Deposits will be refunded only upon return of plans and specifications to the Department of Public Works, unmarked and in good condition within two (2) weeks after opening of the bids. Prospective bidders are alerted to the provisions of Ordinance No. 10062 regarding allocation of contracts to minority vendors. The City will expect prospective bidders to submit an Affirmative Action Plan, as defined in said Ordinance, and as required in the Instruction to Bidders. The City of Miami has adopted Ordinance No. 10032, which implements the "First Source Hiring Agreement." The object of this ordinance is to provide employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may be eligible for wage reimbursement under this program. For further information contact the Department of Public Works, City of Miami, at (305)579-6856. Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the Citv Manager may reject any or all bids, and readvertise (8-5515, Req. 3679). Cesar H. Odio City Manager 30-1 M0-1 �0r 87-602 LICITACION NO. 86-87-098 AVISO DE LICITACION Propuestas selladas para FAIRLAWN SOUTH SANITARY SEWER IIMPROVEMERr - SR-5515-C (centerline sewer), seran recibidas por el Administrador y la Comision de la Ciudad de Miami, Florida, a mas tardar a las 11:00 a.m. el dia 25 de junio de 1987, en la Caoara de la Comision, primer piso, Ayuntamiento de Miami, 3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, a cuya Nora y en cuyo lugar seran publicamente abiertas y leidas. Este proyecto comprende la construction de aproximadamente 28,500 pies lineales de tuberia de arcilla vitrificada y de hierro ductil de 8 a 20 pulgaaas de diametro a una profundidad maxima de 16 pies; aproximadamente 16,300 pies lineales de tuber. a lateral de hierro fundido extra fuerte de 6 p,.lgadas de diametro; 111 registros (manholes) a profundidades de 4 a 16 pies; reemplazo de aceras y pavi+-nento. El estimaao ae construction esta entre $1,500,000 y $2,000,000. Regulations municipales permitiran a los licitadores presentar bonos de cumplimiento y de licitacion de acuerdo a la Resoluci6n No. 86-983. Para pregvntas tecnicas acerca de los plans y especificaciones llame a James J. Kay, P.E., Ingeniero de Disefto de Alcantarillados, al (305)579-6865. Today las licitaciones seran sometidas de acuerdo con las Instructions a los Licitadores y las Especificaciones. Los juegos de planos y especificaciones podtIn obtenerse en la oficina del Director de Obras Publicas, 275 N.W. 2 Street Oto Piso), Miami, Florida, a partir del 28 de mayo de 1987. Se requerira un deposito de $20 por calla juego. Estos depositos se reembolsaran unicamente si los planos y las especificaciones son devueltos sin marcas y en buen estado, aentro de un plazo de dos (2) semanas siguientes a la apertura de las licitaciones, al Departamento de Obras Publicas. Se avisa a los interesados de las provisions de la Ordenanza No. 10062, la cual se reftere a la otorgacion de contratos a minorias. La Ciudad requerira de los interesados un Plan de Accion Afinnativa, segun definido en 'dicha Ordenanza, y segue sea requerido en las Instructions a los Licitadores. La Ciudad de Miami ha adoptado la Ordenwma No. 10032, la coal implements el "First Source Hiring Agreement". Esta ordenanza tiene por objeto proveer oportunidades para enpleo a residentes de la Ciudad de Miami en contratos que resulten en la creaci6n de nuevas plazas de trabajo. Los contratistas podran ser elegibles para reenbolsos de gastos de salarios bajo este programa. Para mayor informacion dirijase al Depto. de Obras Publicas, al. (305)579-6856. Las propuestas incluyen el tiempo de ejecucion, y las especificaciones contienen provisos para dahos liquidados incurridos por falta de completar el proyeeto a tiempo. La Comision de la Ciudad se reserva el derecho a descartar cualquier informalidad en cualquier licitacion, y el Administrador de la Ciudad puede rechazar cualquiera o todas las propuestas, y reanunciar (8-5515, Req. 3679) . Matty Hirai Secretaria Municipal 87-602 ESTIMATE OF COST OF LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES FAIRLAWN SOUTH SANITARY SEWER IMPROVEMENT SR-5515 C (centerline sewer) ORDERED BY RESOLUTION NO. 86-679 ADOPTED SEPTEMB 1986-' ESTIMATED CONSTRUCTION COST OF IMPROVEMENT ............ ..�........ S.I-r-8-H 000 ESTIMATED INCID ;.ITAL EXPENSES: Surveys; Inspection and Supervision�� of work; Preparation of Plans; Specifications and Estimates, etc.. S259,000. Printing; Publishing of notices and proceedings; Preparation of Bonds; Legal services; Abstracts; etc., and other necessary and proper expenses .................... S 37,000 TOTAL ESTIMATED INCIDENTAL EXPENSES ................ S 296,000 TOTAL INDIRECT EXPENSE ............................. $ 10,730 TOTAL ESTIMATED CONSTRUCTION COST AND INCIDENTAL AND INDIRECT EXPENSES ........................................ $2,156,730 DISTRIBUTION: Estimated cost to be paid by City of Miami ............... $1,024,680 Estimated cost of all items to be assessed ............... $1,132,050 Estimated cost of 683 Average Lats....................... S 409,800 Estimated cost of 53,500 L. ft. of Frontage .............. $ 722,250 Estimated assessment per front foot: ........................ S 13.50 Estimated assessment per average centerline lateral......... $ 600 3�- 87-602