Loading...
HomeMy WebLinkAboutR-87-0690J-87-649 6/25/87 RESOLUTION N0.j;'�-+; t A RESOLUTION CONFIRMING ORDERING RESOLUTION NO. 87-534 AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR SEALED BIDS FOR THE CONSTRUCTION OF BUENA VISTA HIGHWAY IMPROVEMENT -PHASE III IN BUENA VISTA HIGHWAY IMPROVEMENT DISTRICT PHASE III H-4531. WHEREAS, at the City Commission Meeting of June 11, 1987, Resolution No. 87-534 was passed which ordered a highway improvement identified as BUENA VISTA HIGHWAY IMPROVEMENT -PHASE III in BUENA VISTA HIGHWAY IMPROVEMENT DISTRICT -PHASE III H-4531; and WHEREAS, pursuant to due public notice, a public hearing was held before the City Commission on July 9, 1987, as to any objections to the confirmation of Resolution No. 87-534 which resolution ordered BUENA VISTA HIGHWAY IMPROVEMENT -PHASE III in BUENA VISTA HIGHWAY IMPROVEMENT DISTRICT -PHASE III H-4531; and WHEREAS, no objections to the confirmation of said highway improvement were sustained by the Commission, it is therefore in order for the Commission to confirm said ordering resolution and authorize the City Clerk to advertise for sealed bids for the construction of said improvement; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. Resolution No. 87-534 dated June 11, 1987, which ordered BUENA VISTA HIGHWAY IMPROVEMENT -PHASE III in BUENA VISTA HIGHWAY IMPROVEMENT DISTRICT -PHASE III H-4531 is hereby confirmed. CITY COYiMISSION T�!EETINC OF JUL 9 1987 8 7-630 RESOLUTION No. REMARKS: r r Section 2. The City Clerk is hereby authorized to advertise for sealed bids for the construction of BUENA VISTA HIGHWAY IMPROVEMENT - PHASE III in BUENA VISTA HIGHWAY IMPROVEMENT DISTRICT -PHASE III H-4531. PASSED AND ADOPTED this 9th day of July , 1987. ATTEST CITY CLERK PREPARED AND APPROVED BY: le, /, - x 7, CHIEF DEPUTY CITY ATTORNEY APPR ED ASITO FORM AND CORRECTNESS: L VV.l1 !1 • vV vv CITY ATTORNEY - 2 - V M A Y O R 87-G JO. CITY Ofr MIAMI. FLORIbA INTER -OFFICE MEMORANDUM TO Honorable Mayor and BATE JUN 3 U 1881 VILE: B - 4 5 31 Members of the City Commission SUBJECT Resolution Confirming Ordering Resolution for Buena Vista Highway Improvement - FROM REFERENc&b a s e III H- 4 5 31 Cesar H. O d i 0 ENCLOSURES: City Manager RECOMMENDATION: It is respectfully recommended that the City Commission adopt the attached resolution confirming the ordering resolution for Buena Vista Highway Improvement -Phase III and authorizing the City Clerk to advertise for sealed bids for the construction of said improvement. BACKGROUND: The Department of Public Works, after studying the area and considering the wishes of its residents, and in a continuing effort to serve all residents of the City of Miami, is proposing an assessable improvement under Section 56 of the Charter of the City of Miami described as Buena Vista Highway Improvement -Phase III H-4531. This district is located in the area bordered by N.W. 38 Street, N.W. 46 Street, N. Miami Avenue and N.W. 2 Avenue, and N.W. 38 Street between N.W. 2 Avenue and its western terminus approximately 210 feet west of N.W. 2 Avenue. The condition of certain street rights of way in the Buena Vista area has deteriorated. The pavement is narrow, in poor condition and/or out of grade; side parkways are in poor condition; curbing has deteriorated; and drainage problems exist. All of these problems will be corrected on the streets included in Buena Vista Highway. Improvement -Phase III H-4531. The proposed construction will include asphaltic pavement, concrete sidewalk, concrete curbs and/or gutters, storm drainage facilities and landscaping where feasible. Buena Vista Highway Improvement -Phase III is included in the City of Miami's 1986-92 Capital Improvement Program. The construction of this improvement will be funded by Highway and Storm Sewer General Obligation Bond Funds. The estimated total co:t of this project is $1,800,000. 92 -/ 8'; -GJ0 This project was ordered at the June 11, 1987 Commission meeting. It is now in order to confirm the ordering resolution and authorize the City Clerk to advertise for sealed bids for the construction of said improvement. On April 24, 1987 the Department of Public Works mailed letters to 251 property owners in the proposed improvement district. Included with the letter was a self-addressed postcard for the property owners to fill out, sign and mail back to the Department. The response would be utilized to determine if the majority of the property owners wanted the City to proceed with the proposed improvements. A tabulation of the response from the property owners is attached. On May 5, 1987 the Department of. Public Works held an evening meeting at Shadowlawn Elementary Community School located at 149 N.W. 49 Street, to explain the proposed improvements to the 251 affected property owners. Nineteen people representing 15 properties within the proposed improvement district attended the meeting. Only one property owner at the meeting expressed opposition to the project. Attachments: Proposed Resolution Project Map Tabulation of Ballots - 2 - I ESTIMATE OF COST OF LOCAL IMPROVEMENT AND INCIDENTAL EXPENSES BUENA VISTA HIGHWAY IMPROVEMENT -PHASE III H-4531 ORDERED BY RESOLUTION NO. 87-534 ADOPTED JUNE 11, 1987 ESTIMATED CONSTRUCTION COST OF IMPROVEMENT .....................S ESTIMATED INCIDENTAL EXPENSES: Surveys; Inspection and Supervision of work; Preparation of Plans; Specifications and Estimates, etc.. $216,000 Printing; Publishing of notices • and proceedings; Preparation of Bonds; Legal services; Abstracts; etc., and other necessary and proper expenses .................... S 31,000 TOTAL ESTIMATED INCIDENTAL EXPENSES ................ S ESTIMATEDINDIRECT COST ....................................... S TOTAL ESTIMATED COST OF IMPROVEMENT ........................... S DISTRIBUTION: Estimated cost to be paid by City of Miami ..............: S Estimated cost of all items to be assessed ............... $ Estimated assessment per front foot ...................... S Estimated assessment per L. Ft. of curb and gutter....... S Estimated assessment per L. Ft. of 6" curb ............... S Estimated assessment per L. Ft. of valley gutter......... S Estimated assessment per s.y. of 1-inch asphalt.......... S Estimated assessment per s.y, of 8-inch limerock base.... S Estimated assessment per L. Ft. of concrete sidewalk..... $ 1,544,000 247,000 9,000 1,800,000 1,494,000 306,000 10.00 2.00 1.75 1.75 0.75 2.35 2.50 3 87 -bJO w 1 A it �(� J � �a .! g Li\a t LJ.L �! es•m.o Stmts to be Impumd Ike. •. W • ■.� N as l s. tl ■ t •t—� i BUENA VISTA HIGHWAY I;iPROVEMENT-?HASE III B-4531 i i y bALLU I � BUENA VISTA HIGHWAY � 31 PROVEMENT - PHASE III CRATE 4 4-3 50--8 55 M-nr%-n G APi'ROVE IDISAPPROVEI TOTAL 11 TOTALS 46 1 P,