HomeMy WebLinkAboutR-87-0644J-87-658 7/2/87 RESOLUTION NO. A RESOLUTION ACCEPTING THE COMPLETED WORK OF MET CONSTRUCTION, INC. AT A TOTAL COST OF $427,533.00 FOR ORANGE BOWL JOIST REPLACEMENT - IP86 C.I.P. PROJECT NO. 332230 AUTHORIZING AN INCREASE IN MAY 16, 1986 CONTRACT WITH MET CONSTRUCTION, INC. FOR SAID WORK IN THE NET AMOUNT OF $9,787.00 AND AUTHORIZING A FINAL PAYMENT OF $20,230.65 WHEREAS, there exists a contract dated May 16, 1986 between the City of Miami, Florida and MET Construction, Inc. for ORANGE BOWL JOIST REPLACEMENT - 1986 C.I.P. Project No. 332230; and WHEREAS, the work has been satisfactorily completed, and MET Construction, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, necessary additional work and the acceleration of work by the contractor in order to complete the project prior to a stadium event 16 days earlier than required by the contract caused an increase in construction cost that will require a final increase in the contract amount of $9,787.00; and WHEREAS, sufficient funds for the increased cost are available from the 1987 F.Y. Orange Bowl Stadium General Operating Budget; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend the increase of $9,787.00 to cover the increase in the contract; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The amount of the May 16, 1986 contract with MET Construction, Inc. for ORANGE BOWL JOIST REPLACEMENT - 1986 C.I.P. Project No. 332230 is hereby increased in the net amount of $9,787.00 with monies therefor to be provided from the 1987 F.Y. Orange Bowl Stadium General Operating Budget. CITY CO4MISSI014 r EATING OF JUL 9 19£Z Section 2. The completed work performed by MET Construction, Inc. for ORANGE BOWL JOIST REPLACEMENT - 1986 C.I.P. Project No. 332230 is hereby accepted at a total cost of $427,533.00. Section 3. The proper officials of the City of Miami are hereby authorized to pay MET Construction, Inc. a balance of $20,230.65 as full and final payment for all work performed and all materials furnished in connection with the aforesaid contract. PASSED AND ADOPTED this9thday of July 1987. ATTE AHIRAI, CITY CLERK PREPARED AND APPROVED BY: CHIEF DEPUTY CITY ATTORNEY APPROVE-b AS TO FORM AND CORRECTNESS: LqViA A. UUUUHty T, C Y ATTORNEY - IL.'- cAgtiM E. GARCIA, DIRECTOR FINAOT DEPARTMENT VMANUHAR MANAGEMENT S BU GET DEPARTMENT KANNING DEPARTMENT 87-6.11 CITY OF MIAMI. IrLORIDA INTER-0IFFICE MEMOIRANDUM To. Honorable Mayor and Members of the City Commission FROM! Cesar H. Odi o PD City Manager - RECOMMENDATION: 24 DATE: J U N 3 0 1987 ME: B- 2 9 0 7 SUBJECT: ORANGE BOWL JOIST REPLACEMENT - 1986 C.I.P. Project No.404000 Resolution for Increase in REFERENCESContract A Final Acceptance ENCLOSURES: It is respectfully recommended that the City Commission adopt the attached resolution accepting the completed work performed by MET Construction, Inc. at a total cost of $427,533.00 for ORANGE BOWL JOIST REPLACEMENT - 1986 C.T.P. Project No. 404000; authorizing an increase in the contract in the amount of $9,787.00 and authorizing a final payment of $20,230.65. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met for the Orange Bowl Joist Replacement - 1986 C.I.P. Project No. 404000. MET Construction, Inc. has completed the project, which originally consisted of the replacement of 150 deteriorated joists and 7,500 s.f. of deck slabs in the Orange Bowl Stadium. Two previous increases in contract have been approved for the project. Resolution No. 86-723 (September 11, 1986) authorized an increase of $30,000 to pay for additional deteriorated deck slabs and structural members that were uncovered during construction and required correction before the first Dolphin Exhibition Game on August 16. The $30,000 increase was insufficient, and it actually cost $34,587 to take care of the additional work. Resolution No. 87-192 (February 12, i987) authorized an increase of $15,496 to widen the Orange Bowl Playing Field area in order to facilitate proposed soccer events. a2y—! 8'` _611 4 4 The contractor had submitted a claim for $10,392.55 in overtime pay to accelerate the project and have it essentially completed, for the August 16 game, 16 days earlier than the contract specified. The acceleration costs were negotiated down to $5200 so that the increase in contract would be less than $10,000 and would facilitate the contractor's final payment. The proposed $9,787 increase in contract is therefore, the sum of the $4587 overrun of the original $30,000 increase in contract and the $5200 negotiated acceleration cost. The total payments to the contractor will be greater than the original contract amount by S55,283 because of the increases noted above. This was a unit price contract in the amount of $372,250 but because of the increases the final construction cost for the project is $427,533. Attachments: Proposed Resolution tr i 2 87-6-111 FINAL CONSTRUCTION FACT SHEET JOB NAME Orange Bowl - Joist Replacement - 1986 - B-2907 CONTRACTOR M.E.T. Construction, Inc. JOB SCOPE Remove and replace 152 concrete joists, 11,675 square feet of concrete deck, misc. steel supports, and modifications to lower grandstand to facilitate soccer events all located at the Orange Bowl Stadium. REASON Replacement of deteriorated joists, deck slabs, widen FOR WORK playing field to facilitate soccer events. SOURCE Orange Bowl Stadium General Operating Budget OF FUNDS PROJECT Bids Received: 5/6/86 HISTORY Contract Awarded: 5/7/86 Preconstruction Meeting: 5/12/86 CONTRACT TIME STARTED 6/2/86 CONTRACT TIME 90 Calendar days plus 173 calendar days delay for extra work and demobilization/remobilization for stadium events and extra work. SCHEDULED I COMPLETION - DATE 2/19/87 ACTUAL COMPLETION DATE 2/19/87 BID AMOUNT $417,746.00 (Includes a $30,000 increase authorized by Comm. Reso. 86-723, dated 9/11/86 and a $15,496 increase authorized by Comm. Reso. 87-192, dated 2/12/87). CONTRACT FINAL COST $427,533.00 (Includes a $9,787 increase to be authorized by Comm. Reso. at final payment). CURRENT ITEM FOR Resolution to accept completed work, increase contract CONSIDERATION amount $9787, and authorize final payment to the contractor. 3