Loading...
HomeMy WebLinkAboutM-87-0838JNMMIF- y oi" Of MiAMi, VUiDA 93 IWTER4F:F10E tARMORANDUM f�. Ronora'ble Mayor and Meftars Bhft � ftt of the City Coo mission Suer€ef: 'oconut 'Grove Exhibition Center, Renovation/Expansion FROM: Cesar N. Odi City Manager MCLOSIOW-DiSCUSSion Ita: CoWssion Neeting September 8; 1987 RECOMMENDATION: It is respectfully recommended that a discussion take place at the City Commission Meeting of September 8, 1987, regarding the Coconut Grove Exhibition Center Renovation and Expansion Project, specifically a presentation by Spillis, Candela & Partners, Architects as a result of their completion of work related to Stage I: Programmatic Analysis and Pre -schematic Design Phase of their agreement with the City, thereby requesting approval of this Stage and seeking the City's authorization to proceed to Stage II and the development of construction documents. BACKGROUND: In June 1987 the Miami City Commission approved the execution of an agreement between the City of Miami and Spillis Candela & Partners, Inc. for the expansion and renovation of the Coconut Grove Exhibition Center. Phase I work included an analysis and evaluation of the existing facility, creating an overall expansion program in order to maximize the full potential of the facility, and Phase I recommendations based on a $5,000,000 budget. Following are the analysis and recommendations of Spillis Candela & Partners, Inc.: I. Recommended Upgrading of Existing Facilities A. Bring the existing facility to current life -safety standards. Some of these items would include for example: 1. The installation of a fire sprinkler system throughout the building. 2. 3. Providing a new fire pump and an emergency generator. Providing a fire alarm system and emergency lighting. It molls Mayor afld Members of the -City tommisliofl Page 2 4. Providing adequate number of exitt. S. Removing the steel roll up doors at the wrest end of the main exhibition space. R. Repair and renovation to the existing structure, including for example: 1. Repair of existing roof leaks. 2. Repairs to existing metal siding. 3. Restoring the A/C, plumbing and electrical systems. C. Bringing the existing facility to minimum industry standards, as for example, providing adequate utilities for exhibits, providing a subdivision of space by means of folding partitions to allow maximum flexibility, etc. II Creating an overall expansion program to maximize the use of the facility by adding the following: A. A multipurpose room for a capacity of +1,000 occupants to serve banquets and conventions. B. Addition of meeting rooms that can be subdivided to serve different size groups, including a +350 seat auditorium. C. Enhancement and expansion of the exhibition area. An additional 32,000 square feet increasing the total square footage to approximately 132,000. D. Upgrading the exterior appearance of the facility as well as landscaping and parking improvements. III Based on a $5,000,000 budget the Phase I, the following recommendations are made that will be consistent to the overall expansion program. Approximate construction cost estimates are based on preliminary figures. 87-8;313; s 'Ron. Mayor and Members of the deity Commission Page 3 A. Existing 9014ing 1. Code upgrading and life safety issues $ 8720400 (including 20% contingency) 2. Renovations and partial repairs, including: a. Metal siding repair..............5100,000 b. Ranair of existing roofing....... 1006000 c. Replacing of entrance grill...... 100400 d. Paint ............................ 126000 e. Plumbing ......................... 148:000 f. HVAC ............................. 2630000 g. Electrical ....................... 1400000 h. Remove steel doors ............... 20,000 i. Caulking and sealants............ 24,000 $931,400 20% contingency:........ 186,280 $1Z`IT'm $1,117,680 Say: $2,000,000 B. Warm Up Kitchen ......................$100,000 Equipment ............................ 100,000 (including 20% contingency).......... $2009000 $ 200,000 C. New Exhibition Space (including 20% contingency) 24,000 SF @ $75.00 $1,800.000 D. Entrance Landscaping .................$118,125 20% contingency........... 23,625 Say: $ 140,000 i r �Oflorable MAyor amd members of the City tommi ss l orl Page 4 Parki mg Lot 0 For 137 Carl/��9 �$/1*000/eaar j�/� (including tontImq# tcy)......i.i.$137,000 Say: $ 140,000 #4s2$0,000 4.67% escalation: 2000000 $4;480,000 F. A/E fees: 1. Phase I..........................S150,000 2. Phase II... ....... 6866666866666 370,000 T52U-9 Q $ - 520, 000 Grand Total: $S,000,000 u 11 Co= t Grow Exhibition C*nter Notim to Proceed End Schenatc Design Review Period End Start Design Development End Design Development Review Period End Start Construction Documnts End Construction Documents Permits Bidding Award Contract Notice to Proceed & Mobilization Start Construction Construction End Septemmber 1S, 1987 November 17, 1987 December 11, 1987 December 14, 1987 February 15, 1988 March 4, 1988 March 7, 1988 June 24, 1988 July 22, 1988 August 19, 1988 September 16, 1988 October 14, 1988 November 7, 1988 October 6, 1989 1.4