HomeMy WebLinkAboutM-87-0844CITY OF MIAMI. FLORIDA INTER-OFFICK MEMORANDUM TM Honorable Mayor and Members CAT[: AU 3 11987 MA: of the City Commission suuEcr: Coconut Grove Exhibition Center: Renovation/Expansion FROM. Cesar H. Odi MOMI NC"s City Manager s..L.W.—Discussion Item: Con fission 7'Neeeettiing September 8, 1987 W . RECOMMENDATION: It is respectfully recommended that a discussion take place at the City Commission fleeting of September 8, 1987, regarding the Coconut Grove Exhibition Center Renovation and Expansion Project, specifically a presentation by Spillis, Candela i Partners, Architects as a result of their completion of work related to Stage I: Programmatic Analysis and Pre -schematic Design Phase of their agreement with the City, thereby requesting approval of this Stage and seeking the City's authorization to proceed to Stage II and the development of .construction documents. BACKGROUND: In June 1987 the Miami City Commission approved the execution of an agreement between the City of Miami arid Spillis Candela & Partners, Inc. for the expansion and renovation of the Coconut Grove Exhibition Center. Phase I work included an analysis and evaluation of the existing facility, creating an overall expansion program in order to maximize the full potential of the facility, and Phase I recommendations based on a $5,000,000 budget. Following are the analysis and recommendations of Spillis Candela b Partners, Inc.: I. Recommended Upgrading of Existing Facilities A. Bring the existing faci 1 i ty to current 1 i fe-safety standards. Some of these items would include for example: 1. The installation of a fire sprinkler system throughout the building. 2. Providing a new fire pump and an eimergency generator. 3. Providing a fire alarm system and emergency lighting. F� Hon. Mayor and Members of the City Commission Page 2 4. Providing adequate number of exits. S. Removing the steel roll up doors at the west end of the main exhibition space. B. Repair and renovation to the existing structure, including for example: 1. Repair of existing roof leaks. 2. Repairs to existing metal siding. AO1 3. Restoring the A/C, plumbing and electrical systems. C. Bringing the existing facility to minimum industry standards, as for example, providing adequate utilities for exhibits, providing a subdivision of space by means of folding partitions to allow maximum flexibility, etc. II Creating an overall expansion program to maximize the use of the facility by adding the following: A. A multipurpose room for a capacity of +1,000 occupants to serve banquets and conventions. B. Addition of meeting rooms that can be subdivided to serve different size groups, including a +350 seat auditorium. C. Enhancement and expansion of the exhibition area. An additional 32,000 square feet increasing the total square footage to approximately 132,000. eo*� 0. Upgrading the exterior appearance of the facility as well as landscaping and parking improvements. III Based on a E5,000,000 budget the Phase I, the following recommendations are made that will be consistent to the overall expansion program. Approximate construction cost estimates are based on preliminary figures. W Hon. Mayor and Members of the City Commission Page 3 A. Existing Building 1. Code upgrading and life safety issues S 872,400 (including 20% contingency) ' 2. Renovations and partial repairs, including: a. Metal siding repair..............$100,000 b. Repair of existing roofing....... 100,000 c. Replacing of entrance grill...... 10,400 d. Paint ............................ 126,000 e. Plumbing ......................... 148,000 f. HVAC ............................. 263,000 g. Electrical ....................... 140,000 h. Remove steel doors ............... 20,000 i. Caulking and sealants............ 24,000 $931,400 20% contingency:........ 186,280 S17119"q $1,117,680 Say: $2,O00,000 B. Warm Up Kitchen ......................$1O0,000 Equipment............ ................ 100,000 (including 20% contingency).......... $2O0,000 $ 200,000 C. New Exhibition Space ,.� (including 20% contingency) 24,000 SF 0 $75.0O 51080O.000 i 0. Entrance Landscaping .................$118,125 i 20% contingency........... 23,625 Sa)►: t 1409000 rt �� ^.r1: CR 4� Honorable Mayor and Members of the City Commission Page 4 E. Parking Lot C For 137 cars @ $1,000/car (including 20% contingency) .......... $137,000 Say: 4.67% escalation: S 140,000 $4,290,000 200,000 $4,480,000 F. A/E fees: 1. Phase I..........................$150,000 2. Phase II ......................... 370,000 35Zff,w S 520,000 Grand Total: $56000,000 T.. Coconut Grove Exhibition Center PP40POSM SCHTi= Notice to proceed September 15, 1987 Bad Schematic Design November 17, 1987 Review period End December 11, 1987 Start Design Development December 14, 1987 End Design Develcpasnt Febniazy 15, 1988 Review Period End March 4, 19SS Start Construction Documents March 7, 1988 End Construction Documents June 24, 1988 Permits July 22, 1988 Bidding August 19, 1988 Award Contract September 16, 1988 Notice to Proceed & Mobilization October 14, 1968 Start Construction November 7, 1988 Construction End October 6, 1969 � n;t A .