Loading...
HomeMy WebLinkAboutR-88-02350% ^ 3i 1' 8 s4 RESOLUTION NO. AA-235 --------------- A RESOLUTION RATIFYING THE ACTIONS OF THE CITY MANAGER, WHICH (1) UTILIZED A SHORTENED TIME PERIOD FOR SEALED BIDS, (2) ACCEPTED THE LOWEST RESPONSIBLE AND RESPONSIVE BID FROM MARKS BROTHERS, COMPANY, IN THE AMOUNT OF $11,000, FOR THE REPAIR TO THE STORM SEWER BOX CULVERT IN CONNECTION WITH "STORM SEWER REPAIR EAST FLAGLER STREET", WITH MONIES THEREFOR ALLOCATED FROM LOCAL DRAINAGE PROJECTS - FY '88 ACCOUNT, PROJECT NO. 352251 TO COVER THE CONTRACT COST, (3) ENTERED INTO A CONTRACT WITH SAID LOW BIDDER FOR THE CONSTRUCTION OF THE PROJECT; ADOPTING THE CITY MANAGER'S WRITTEN FINDINGS THAT A VALID EMERGENCY EXISTED; WAIVING THE REQUIREMENTS FOR FORMAL SEALED BIDS. WHEREAS, the storm sewer box culvert located in EAST FLAGLER STREET was in need of emergency repairs because of the correction of an unsafe condition due to adjacent work to a sanitary sewer lateral; and WHEREAS, this created a situation that was unsafe and dangerous for the public, and said repairs had to be made immediately; and WHEREAS, the Director of the Department of Public Works has determined that the fastest and most effective way to remedy the situation was to let a contract for the repair of the storm sewer box culvert; and WHEREAS, the Capital Improvements Appropriation Ordinance No. 10347, as amended, was adopted on October 22, 1987, and monies were available for the proposed amount of the contract, project expense, and incidentals from the account entitled "Local Drainage Projects - FY 18811, Project N352251 in said ordinance; and CITY COMMISSION MEETING OF { MAR 1Q13f235 No l�C WHEREAS, the City Manager made a written finding that the use of the competitive sealed bidding method for the award of the herein procurement contract was not practicable or advantageous, due to the fact that the fifteen (15) day bidding time required by the City Code imposed a serious constraint on the correction of the situation on East Flagler Street; and WHEREAS, emergency bids were solicited from eight (8) local contractors, and a low bid was received on February 22, 1988, from Marks Brothers, Company, the lowest responsive and responsible bidder, in the amount of $11,000; and WHEREAS, the City Manager has awarded a contract to said firm in order to avert any danger to the public caused by the above situation; and WHEREAS, the City Commission, after a properly advertised public hearing, accepts the findings of the City Manager and ratifies his actions in connection with this project; and WHEREAS, the City Commission hereby waives the requirements for formal sealed bids in connection with this emergency repair; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The findings set forth in the preamble to this Resolution are hereby adopted as if fully set forth in this Section. Section 2. The actions of the City Manager, which utilized a shortened time period for sealed bids for the "STORM SEWER REPAIR EAST FLAGLER STREET", accepted the low bid of Marks Brothers, Company, the lowest responsive and responsible bidder, and entered into a contract with said low bidder, are hereby ratified by a four -fifths vote of the members of the City Commission, and the formal requirements for competitive sealed bids are hereby waived. Section 3. The amount of $20,000 is hereby allocated from the account entitled Local Drainage Projects - FY 18811, Project No. 352251 to cover the cost of said contract. - 2 - 89-2:35 ^A P% PASSED AND AOOPTEO this 100th aar of March 1988. XAVIER L. SUA 2, MAYOR ATtES MA TY HIRA1, CITY CLERK PREPARED AND APPROVED BY: er4y �7• &a4,,-� ROBERT F. CLARK CHIEF DEPUTY CITY ATTORNEY APPRO D AS TO FORM AND CORRECTNESS: -- ti IWIA A. UGHERTY ITY ATTORNEY - 3 - BUDGETARY REVIEW: FRANK R. MAY, ACTI DIRECTOR MANAGEMENT & BUDG CAPITAL PROJECT: z� DIREC(W OF PLANNING 8"3S QO 65 CITY OF MIAMI. FLORIDA INTiR•OFFiCE MlM011ANDUM .o Monorab l e Mayor and Members DATE MAC _ "ek-4 RtLE 8-5550 of the City Commission " SUNJECT Resolution waiving Formal Bid Requirements & Awarding a Contract FROM Cesar H . Od l REFERENCES City Manager ENCLOSURES C� RECOMMENDATION It Is respectfully recommended that the City Commission adopt the attached resolution which ratifies the emergency actions of the City Manager which waived the requirement for formal sealed bids in connection with the "Storm Sewer Repair East Flagler Street" project, awarded a contract to and entered Into contract with Marks Brothers, Company, the lowest responsive and responsible bidder for the bids received, in the amount of $11,000. BACKGROUND The Department of Public Works has determined that there exists an emergency need to carry out repairs to the storm sewer box culvert on East Flagler Street. Investigations showed that sewage was spilling into the City's storm sewers at this Flagler Street location because of the way the system had been originally constructed years ago. After completion of the repair to and Isolation of the sanitary sewer lateral by the Miami Dade Water & Sewer Authority Department, the box culvert was left with a portion of the top slab removed creating an unsafe and dangerous situation. In order to avoid any delays in the start of construction, a reduction in bidding time was required. In addition, awarding of contracts at the regular Commission meeting of March 10, 1988, would place further time constraints on the repairs. R�"235 10 Honorable Mayor and Memeber Of the Collwl i ss l-on Pape 2 The attached resolution ratifies the actions of the City Manager, which waived the time requlrements for formal sealed bids, awarded a contract to and entered into a contract with Marks Brother, Company, the lowest responsible and responsive bidder, In the amount Of $11,000. Eight (8) invitations were delivered to local contractors, and three (3) bids were submitted In connection with the project (1 Hispanic, 1 Black). The Capital Improvements Ordinance 10347, adopted October 22, 1987, has been amended. Monies are available for the estimated amount of the contract from the account entitled "Local Oralnage Projects - FY '88"•. Project No. 352251. Attachment: Proposed Resolution 2