CITY OF MIAMI. FLORIOA
INTER -OFFICE MEMORANDUM
PZ=IA
Honorable Mayor and Members =ATE MAR 1 � ipR9 VILE
of the City Commission '�'
SU.JEC- Public Hearing: Edison
Center Gateway Project
Progress Report
COM AtEFERENCES
Cesar H. Odi
City Manager _"CLOSURES
Per the request of Vice Mayor Rosario Kennedy, the Edison Center Gateway Project,
located in the Model C i ty area along N. W. 7th Avenue from N. W. 58th to N. W.
64th Streets and along N. W. 62nd Street (MLK Jr. Boulevard) from I-95 to N. W.
12th Avenue, was placed on the February 18, 1988, City Commission Agenda as a
discussion item. The City Commission, on February 18, 1988, instructed staff to
conduct a public hearing on March 24, 1988. The following are the background and
progress report for your perusal.
BACKGROUND
Following the civil disturbances of 1980, the Edison Center Business District
Economic Committee was organized by Commissioner Miller J . Dawkins to establish
economic development strategies for the revitalization of the Edison Center
Business District, thereby creating a positive image for the area. The
Committee - comprised of business persons, community leaders, residents, community
organization representatives and government staff adopted several objectives and
strategies for economic development including, although not limited to, the
following:
-To upgrade the physical, visual and environmental conditions of the
commercial area and to create an attractive and convenient environment for
shoppers and workers.
The Edison Center Gateway Project is designed to improve the aesthetic appearance
of the Edison Center Business District as well as to create a landscaped gateway
into the area. Initially, improvements will include landscaping to buffer I-95,
street furniture, trash receptacles, and lighting and signage in the following
areas: N.W. 58th Street to N.W. 64th Street along N. W. 7th Avenue; and N.M. 62nd
Street from I-95 to N.W. loth Avenue (see attached map). However, it is proposed
that future plans for the Gateway project will be extended to N.W. 12th Avenue
along N.W. 62nd Street (MLK Jr. Boulevard).
In 1985, the Tacolcy Economic Development Corporation (TEDC) submitted a proposal
to the City of Miami for implementation of the project. TEDC's proposal was
comprehensive, and incorporated a proposed banner program, youth artist street
murals, street furniture, landscaping and brick pavers. The proposed cost of the
project was approximately $116,000. TEDC requested that funding of the project be
provided by the City of Miami ($30,000), Metro -Dade County ($30,000), Florida
Department of Transportation ($24,000) and the private sector ($31,000). The City
has contributed $30,000 from 12th Year Comwnity Development Block Grant funds.
The City of Miami, through the Planning Department, has been coordinating this
project.
V, t
PROGRESS REPORT
A revised cost estimate has been prepared which totals approximately $298,800 (see
attached). The discrepancy of this cost estimate is due to the inclusion of the
MLK Plaza as part of the total Gateway Improvements. In order to reduce costs,
the design and engineering services are being provided in-house by the Department
of Pubic Works.
The City staff has encountered some unexpected difficulties in implementing this
project due to the jurisdictional issues and- requirements, i.e., N.W. 7th Avenue
is a State road and N.W. 62 Street is a County arterial road. The State and the
County have jurisdictional control regarding the setback requirements for the
trees proposed for the area. The State of Florida Department of Transportation
(FDOT) does not foresee a problem with the proposed project; however, FDOT will
require that the City maintain the improvements once the project is completed.
This would depend on the acceptance and approval by the City Commission.
TEDC has forwarded a highway maintenance agreement draft to the Department of
Public Works for execution.
CURRENT STATUS
1. A resolution authorizing the City Manager to enter into a Highway Maintenance
Agreement with the Florida Department of Transportation is being presented
today for approval, as a companion item to this project. A temporary Highway
Maintenance Agreement draft was forwarded to the Department of Public Works by
TEDC for execution. Upon City Commission approval, the City would then accept
the responsibility of the maintenance and upkeep of the improvements.
2. The Department of Public Works Highway Section is proceeding with survey
information in order to prepare final design drawings.
3. Cost estimates are being prepared to reflect the actual quantity of work which
can be accomplished with available funding.
4. New funding sources have been identified through the Local Initiatives Support
Corporation and the State of Florida Beautification Grant Program. An actual
amount has not been determined at this time.
5. Surveys have been completed to determine locations of awnings, driveways, and
other obstacles to tree locations.
6. Preliminary design plans are being prepared for future items such as
decorative lighting, and street furniture. These will require additional
funding. Cost estimates for these items are incomplete.
In summary, the City Administration has estimated that construction of the project
should begin by the fall of 1988.
Page 2 of 2
198-272 6 1
Ei.TON GATEWAY PROJECT COST ESTA.ATE
N. W. 62ND STREET AND N. W. 7TH AVENUE
SIDEWALKS:
Remove Existing Paynnent 1,600 s.j►. x S3.00 • S 4.800•00
Install Brick Pavers 14,500 s. f. x 6.00 * S 72.600.00 S 77.300.00
CROSSWALKS:
Install 800 s.f. per intersection x 9 • S 7.200.00
Pave removal 6300 i 27 x 3 • S 700•00
Pavers 6300 x S6 • S 37,800.00
PALMS:
Install 260 9 S360
Design A Inspection i Cost
M.K PLAZA
Paving (Brick) 1600 s. f. x 6.00
Palms 37 9 350
Shrubs 37 9 30
Trees 7 9 250
Planters 500 1.f. 9 $8.00
Benches 10 9 750
• S 91,000.00
S 42,800.00
S 469700.00
S 91,000.00
S 42,800.00
$256,800.00
• S
8,000.00
• S
12.950.00
• S
1.110.00
• S
1.750.00
• S
4.000.00
a S
7,500.00
Design i Inspection Cost = S 6,690.00
S 35,310.00
$ 6,690.00
S 429000.00
10TAL: S298.800.00
A9-2'7'2.1
logo going 11111 111111tiviiiii Ilim"m
iEl I I�IIu'll�i� I��� Ill[I'1 f��lEl��lllEE �!l���1���"-•. �!!1l1111 1111 I �
O 0 11111111 IIIIIIIII 1 1 � fllllllll 1111
�o'om,�' 1 'lire iliilllllt= ID�lil iiili
� i u u� n ■�r� 1_ mmmi= =_ 's=
VI a�m�I�C OID C�= mmunp �_ --
� �� IiTi 1111111111w iP�Ti �Yi
rm
MIN
� ���IIII�IIC0111��l,,, d
9 MLK F
EOISO
OFF
nn