HomeMy WebLinkAboutM-88-0394to Meelbers of the City Commission „e�1
fRbM N, t
Xavier L. Suarez trl t t Ot
Mayor r -
cItr CK MIAMI. t 1.011R"A
1NtER4FFIct MEMWIANDUM
April 26, 1999 t
I would like to bring up on the April 28th,
1988 Agenda, a personal appearance by Rev. Richard
A. Pankey, from the Allapattah Baptist Church.
XLS/om
cc: City Manager
City Clerk
ko no
148-39,4
r
AttAPATTAh BAPTIST ChURCh
Richard A. 1'ankc%
l'uvnr
.layor Suarez.,
This is just an explanation as to why I am at A standstill nn
the ACLF as I mentioned to you on ,yesterday.
I am required to have a Performance ^ond, Cashier's Check nr
Letter of Credit in the amount of r4,,nnn,nn hefnre I can su!,mit ray
Plat #1102 fnr final apiroval to the Street an� flit Cnnnittcc.
Tentative Plat was apprnv,�d on G -"1.
Cverythinn is finishpd anal waitinn at 5iscavne Ft.nnineerino to
fit- wit' '�;, 1,-t a0 Str-et. I livr, to appear hnFnrn
the City Cnrnnission after that approval, so we'r talking titre:
I have asked several people if I could sine some type of
agreement that I would do this required work in the streets before
I was oiven a permit, but all sail that they were not authorized
to do that. They said that the City Cnrrnission had to do it. The
last time that I appeared before the City Commission, I was goin!
to ask about this. As I started askinn the question. you spoke up
and said, "Peverend, you better stop while you are ahead." I stopped
and I'm still stopped.
I am nenotiatinn with three joint venture capitalists about the way
in which :•le want to finance and venture in the ACLF. The '^5,ngq.nI
will come out of the venture funds. So, until I ac cone to an agreenent
I cannot continue the process which will take another three to four months.
I'm not askinn for money or to have the thing waived. I just want t.
make a covenant to do what is required when I get the money, so I can
go through this platting process and have it behind me and net on with
main project when the funds are available.
!layor, thank you for taking; the time to read this and help me if
you can - - if not, I'll just continue waiting while I'm still ahead.
Sincteely,
Richard A. Pankey
Pastor
4-1"
L-UJ
T'IIF. DIFFF.RFN(T IS WORM THF. DISTANCE 98-394
33M N.W. 171h Avenue 0 Miami, FlO ida 13142 9 (105) 635-(A'
1. .
t(�ita laf ,Iffinuti
DMAtb W. CA"*R, P.E.
ill ""w
July 14, 1987
Rev. Richard A. Pankey
3300 N.M. filth Avenue
Miami, FL 33142
Dear Rev. Pankey:
USAR H. ODIO
roy Man""
ALLAPATTAII BAPTIST PROPERTY - TENTATIVE PLAT 01302 LOCATED AT
N.W. 17 AVENUE BETWEEN 33 AND 34 STREET
Your tentative plat of Allapattah Baptist Property is now being
processed. As stated in our letter of June 5, 1987, State law
and the Code of the City of Miami require that the owner or
owners of land to be platted or replatted enter into an
agreement with the City of Miami to construct certain
Improvements.
Also, a Performance Bond, Letter of Credit or Cashier's Check
will be required guaranteeing the completion of these
improvements within one year from the acceptance of the
subdivision plat by the City Commission. The amount of the
Bond, Letter of Credit or Cashier's Check is determined from
the estimated improvement costs as follows:
REMOVAL OF EXISTING SIDEWALK $ 800.00
Approximately 800 Square Feet
ASPHALTIC CONCRETE PAVEMENT $10,695.00
Approximately 930 Square Yards
NEW SIDEWALK i 3,675.00
Approximately 1,800 Square Feet
NEW CONCRETE CURB AND GUTTER $ 6,360.00
Approximately 795 Linear Feet
Page 1 of 3 A
DEPARTMENT Of PUIILIC WORKS/27S N.W. 2nd Serem/Miami, Florins 13129/(M) 579-"S6 SS-3�4
STORM SEVER STRUCTURES
Including: 1. 50' of 30" French Drain
2. 4 "F-3" Catch Basins
3. 40' of 12" RCP
4. 15' of 15" RCP
S. Remove 2 "D" Catch Basins
OTHER IMPROVEMENTS:
Relocate 220' of 6' C.L. fence
Remove 2 dead trees
ESTIMATED COST OF IMPROVEMENTS
10% CONTINGENT
16% ENGINEERING
TOTAL
AMOUNT OF PERFORMANCE BOND/CASIIIER'S CHECK
LETTER OF CREDIT
$10.950.00
S 2,200.00
$ 500.00
$35.180.00
S 3,518.00
S 6,191.68
$ .
$ 45,000.00
You and your engineer should confer with the Department of
Public Works to determine the standards and specifications
which will govern the proposed improvements. Your engineer
shall prepare complete construction plans for the development
of streets adjacent to the area in the tentative plat. These
plans must be submitted to Public Works for review and
approval. The construction plans shall include the complete
design of a required sanitary sewer system, or extension
thereof, storm drainage system or street improvements for the
entire area to be subdivided. Your contractor shall do no
construction work until your completed construction plans have
been approved for permit by thenepartment of Public Works.
When directed by the Construction Engineer your surveyor will
be responsible for the layout of all street improvements.
Reasonable time must be allotted for the proper review of the
plan submitted. Also, a reproducible mylar of the approved
plans (maximum size 24" x 36") shall be submitted to the
Highway Section of this Department prior to the issuance of any
construction or building permits for the subdivision
improvements or other improvements on the replatted property.
The Landscaping estimate, when included, is based on full
coverage of sod and planting of specified trees. Upon
presentation of an approved site development plan, including
landscaping, this estimate may be reduced. A letter must
accompany the site plan guaranteeing the landscaping for one
year after acceptance of the improvements by the City. For
further information, call Mr. Guillermo Olmedillo of the City
of Miami, Department of Planning, telephone 519-6086. For
Page 2 of 3
R8-394
-1
information concerning water mains and appurtenances, contact
the Miami -Dade Water and Sewer Authority, telephone 665-1471.
When the final record plat has been prepared by your surveyor,
it is to be submitted to Public Works for checking and
processing. The following items are to accompany the cloth
tracing of the plat and are to he received by Public Works no
later than 6 weeks prior to a City Commission Meeting which
usually occurs on the 2nd and 4th Thursday of the month.
I.
Final plat original (inked).
2.
Three (3) prints of final plat.
3.
Check in the amount of S300.00 for platting fee.
4.
Paid tax receipts on the property.
5.
Approval letters from various utilities concerning
easements and service.
6.
Construction estimate for improvement (to be
I
furnished by City of Miami Highway Section).
7.
Letter of Credit, Performance Bond or Cashier's
Check for amount of improvements. (Forms and/or
{,
substance per Public Works.) Please advise which one.
i� 8.
Agreement between owner and City of Miami (forms
from Public Works) in triplicate. For subdivision
improvements.
9.
Opinion of Title from attorney (Dade County form)
of recent date in triplicate. (Forms from
Public Works).
10.
Any liens on property must be paid.9
11.
Any street or alley closure or varce must be
completed before Zoning Board and/or City
Commission Meeting.
12.
Covenant if required by Public Works. (Forms
from Public Works). ($100 fee) (recording fee).
If you have any questions regarding the improvement estimate,
please call Mr. William Mackey, our Highway Engineer, at 579-
6865. If you have any question regarding the final plat and
its submission to the City Commission, please call Mr. Robert
Barbanera of our Survey Section, telephone 579-6885.
Sin ely,
eo e V Campbell, r., P
Chairman, Plat A St eet C mittee
RB:au
cc: Biscayne Engineering
529 W. Flagler Street
Miami, Florida 33130
Page 3 of 3
139-394