HomeMy WebLinkAboutR-88-0511J-88-535 5/17/RO RESOLUTION NO. HS "`:51 A RESOLUTION ACCEPTING THE COMPLETED WORK OF RIC-MAN INTERNATIONAL, INC. AT A TOTAL COST OF $701,215.39 FOR CITYWIDE SANITARY SEWER REPLACEMENT PROJECT C.I.P. PROJECT NO. 351170 ANn AUTHORIZING A FINAL PAYMENT OF $24,933.44. WHEREAS, there exists a contract dated December 27, 1985 between the City of Miami, Florida and Ric -Man International, Inc.; and WHEREAS, the work has been satisfactorily completed by Ric -Man International, Inc. and they have furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by Ric -Man International, Inc. for CITYWIDE SANITARY SEWER REPLACEMENT PROJECT C.I.P. Project No. 35117n is hereby accepted at a total cost of $701,215.39. Section 2. The proper officials of the City of Miami are hereby authorized to pay $24,933.44 to Ric Man International, Inc. as full and final payment for all work performed and all materials furnished in connection with CITYWIDE SANITARY SEWER REPLACEMENT PROJECT C.I.P. Project No. 351170. CITY COMMISSION MEETING OF JUN 9 1988 )N Na. i2EMARKS, PASSED AND ADOPTED thi 9th day Of 1§88, i -0900, -, MATUT— ATTEST: Ato'looloo....— . ""- PREPARED AND APPROVED BY: CHIEF DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: RNAND CITY ATTORNEY ASSISXA)a `CITY MANAGER , DIRECTOR FINA E DEPARTMENT 2 - 89-511 Ok 34 tltY of WAMI, FLOPIbA INFER-OFFIC€ MEMORANDUM TO. Honorable Mayor and Members of the City Commission FROM Cesar H. Odio City Manager RECOMMENDATION: DATE- MAY 3 1 1988 FILE: B s 5 5 1 7 subJECT REFERENCES: ENCLOSURES. CITYWIDE SANITARY SEWER REPLACEMENT PROJECT EDGEWATER CIP Project #351170 Resolution for Pinal Payment It is respectfully recommended that the City Commission adopt the attached resolution accepting the completed work performed by Ric - Man International, Inc. at a total cost of $701,215.39 for CITYWIDE SANITARY SEWER REPLACEMENT PROJECT - EDGEWATER C.I.P. Project No. 351170 and authorizing a final payment of $24,933.44. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met for Citywide Sanitary Sewer Replacement Project - Edgewater C.I.P. Project No. 351170. Ric -Man International, Inc. has completed the project consisting of the replacement of portions of an existing sanitary sewage system using V -10" clay pipe and ductile iron pipe, 6"-8" laterals, manholes, together with all necessary appurtenances in an area bounded by N.E. 20 Terrace, N.E. 34 Street, Biscayne Blvd:, Biscayne Bay. The total payment to the contractor will be $68,657.61 less than the original contract amount of $769,873.00 because none of the �) cash allowance and not all of the proposal items were used. V Attachments: Proposed Resolution 3y- 1 88--$11 Ak FINALCONSTRUCTIONPACT SHEET JOB NAME Citywide Sanitary Sewer Replacement Projeut Edgewater = B-5517 CONTRACTOR Ric -Man International, Inc, JOB SCOPE Replacement of portions of an existing sanitary sewage system using 8"=1O" clay pipe and ductile iron pipe, 611- 8" laterals, manholes, together with all necessary appurtenances in an area bounded by N.E. 20 Terrace, N.E. 34 Street, Biscayne Blvd., Biscayne Bay, REASON In conjunction with highway improvement FOR WORK SOURCE Citywide Sanitary Sewer Extensions Improvement OF FUNDS PROJECT Bids Received: 10/22/85 HISTORY Contract Awarded: 11/26/95 Preconstruction Meeting: 11/23/85 CONTRACT TIME STARTED 2/4/86 CONTRACT TIME 120 Working days SCHEDULED COMPLETION DATE 7/24/86 ACTUAL COMPLETION DATE 4/25/86 BID AMOUNT $ 769,873.00 CONTRACT FINAL COST $ 701,215.'•9 CURRENT ITEM FOR Resolution to accept completed work and authorize CONSIDERATION final payment to the contractor. 0 2 88-511,